CEO Presentation - Bell Bay Major Projects Conference
Released
Released
Announcement PDF
(ASX:ABX)
A uniquely positioned
Australian company
delivering materials for a
cleaner future
Mark Cooksey
Managing Director
Bell Bay Major Projects Conference
Hotel Grand Chancellor, Launceston
Wednesday 20 November 2024, 12:00pm
Page 1
Disclaimer
This presentation has been prepared by ABx Group Limited ACN 139 494 885 (“ABx” or the “Company”). It should not be considered as an offer or invitation to subscribe for or
purchase any securities in the Company or as an inducement to make an offer or invitation with respect to those securities. No agreement to subscribe for
securities in the Company will be entered into on the basis of this presentation.
This presentation contains forecasts and forward looking information. Such forecasts and information are not a guarantee of future performance, involving
unknown risks and uncertainties. Actual results and developments will almost certainly differ materially from those expressed or implied. ABx has not audited or
investigated the accuracy or completeness of the information, statements and opinions contained in this presentation. Accordingly, to the maximum extent
permitted by applicable laws, ABx makes no representation and can give no assurance, guarantee or warranty, express or other implied, as to, and take no
responsibility and assume no liability for, the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission, from any information,
statement or opinion contained in this presentation.
You should not act or refrain from acting in reliance on this presentation material. This overview of ABx does not purport to be all inclusive or to contain all
information which its recipients may require in order to make an informed assessment of the Company’s prospects. You should conduct your own investigation
and perform your own analysis in order to make an informed assessment of the company’s prospects. You should also conduct your own investigation and
perform your own analysis in order to satisfy yourself as to the accuracy and completeness of the information, statements and opinions contained in this
presentation and making any investment decision.
Prices for aluminium fluoride (AlF3) were sourced from Asian Metals, China Customs and verified by comparison with prices from Bloomberg. The price actually
achieved will depend upon market conditions at the time of sale.
Competent Person Statement
The information in this report that relate to Exploration Information and Mineral Resources are based on information compiled by Ian Levy who is a member of
The Australasian Institute of Mining and Metallurgy and the Australian Institute of Geoscientists. Mr Levy is a qualified geologist and a director of ABx Group
Limited.
Mr Levy has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity, which he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves. Mr Levy has consented in writing to the inclusion in this report of the Exploration Information in the form and context in which it appears.
ASX: ABX
2
Delivering materials for a cleaner future
Rare earths: Supplying light and
heavy rare earths from
Tasmania
Fluorine waste recycling:
Producing industrial chemicals
from aluminium smelter waste
Bauxite: Mining & enhancing
bauxite resources for the cement,
aluminium & fertiliser industries
3
Investment Proposition
Low cost hydrogen fluoride production using aluminium smelter bath waste
Will enable hydrogen fluoride production in Australia, to reduce 100% reliance on imports
Team
Experienced and capable
Supply shortage
No hydrogen fluoride produced in
Australia
Limited global supplies of fluorspar
Process is low risk
Adaptation of existing commercial
process
Strongly increasing
demand for fluorine
New fluorine source
available at low cost
Pathway to production
Batteries
Aluminium smelter bath waste
First mover, at pilot plant stage
ASX: ABX
4
Strongly increasing demand for fluorine
Most demand growth due to lithium-ion batteries
ASX: ABX
5
Supply shortage: limited supplies of fluorspar
Increasing fluorspar prices
Government recognition
97% min fluorpsar price (USD/t)
600
Critical Minerals Lists
500
Source: Roskill
400
Fluorspar
USA
Europe
Japan
Canada
Fluorine
Australia
300
Source: Asian Metal
200
100
0
2014
2016
2017
2019
2020
2021
2023
2024
• Global fluorspar market projected to
move into pronounced deficit by 2025
• Most hydrogen fluoride is produced from fluorspar
ASX: ABX
6
New fluorine source available: aluminium smelter bath waste
Aluminium fluoride (AlF3)
Essential chemical for aluminium smelting
•
1.2 million tonnes produced globally per year worth
US$1.5 billion (US$1,000-1,800 per tonne)
•
•
Australia is the largest aluminium producer without
local aluminium fluoride production, and imports
mostly from China
Results in production of aluminium smelter bath –
controlled waste containing 50% fluorine
Aluminium
fluoride (AlF3)
Aluminium
Smelter
Aluminium
smelter bath
Increasing surplus of aluminium smelter bath
350,000
300,000
Bath (tonnes/year)
•
250,000
200,000
Global surplus
150,000
100,000
50,000
0
Waste
refractory
bricks
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Bath Consumption
Bath Production
Source: S.J. Lindsay, Bath generation and management, 10th Australasian Aluminium Smelting Technology Conference, 2011
ASX: ABX
7
Process is relatively low risk
Smelter bath
Relatively low technical risk
Process is adaptation of existing
commercial process to produce
hydrogen fluoride from fluorspar
Aluminium
smelting
e.g. Refrigerants,
lubricants
AIF3
HF
Aluminium
fluoride
Hydrogen
fluoride
Fluorocarbons
Metal
sulfates
e.g. Metal
treatment, graphite
purification
ASX: ABX
Exemplary demonstration
of circular economy
8
Pathway to production: Vision for fluorine
recycling business
Expansion
Recycle smelter waste
from the global
aluminium industry
Demonstration
Production
Demonstrate chemical
process for recycling
aluminum smelter waste
Construct plant to produce
hydrogen fluoride and
aluminium fluoride from
aluminium smelter waste
Diversification
Enable Australian
fluorochemical industry
ASX: ABX
9
Pathway to production: Project development
Laboratory
300g bath
NSW
$2m (lab)
Batch Pilot
3 kg bath
NSW
$50k
Continuous
Pilot
20 kg/h bath
$2m
2019-22
2023-24
2024-25
Commercial
Stage 1
200 kg/h bath
1,200 t/y AlF 3
Tasmania
$16m
Commercial
Stage 2
3,000 kg/h bath
20,000 t/y AlF 3
Tasmania
$80m
$7.5m federal government grant awarded1 and $5.7m instalments received2
Basic engineering design
package being finalised
Critical process steps
demonstrated 3
Achieved target
fluorine recovery4
First plant planned for Bell Bay, Tasmania
Produce saleable hydrogen fluoride for
evaluation by customers
Determine design and operating
parameters for commercial plant
1ABX ASX Announcement, 29 April 2022
2ABX ASX Announcement, 28 June 2023
3ABX ASX Announcement, 24 October 2022
4ABX ASX Announcement, 4 June 2024
ASX: ABX
10
Investment Proposition
Low cost hydrogen fluoride production using aluminium smelter bath waste
Will enable hydrogen fluoride production in Australia, to reduce 100% reliance on imports
Team
Experienced and capable
Supply shortage
No hydrogen fluoride produced in
Australia
Limited global supplies of fluorspar
Process is low risk
Adaptation of existing commercial
process
Strongly increasing
demand for fluorine
New fluorine source
available at low cost
Pathway to production
Batteries
Aluminium smelter bath waste
First mover, at pilot plant stage
ASX: ABX
11
Delivering materials for a cleaner future
Rare earths: Supplying light and
heavy rare earths from
Tasmania
Fluorine waste recycling:
Producing industrial chemicals
from aluminium smelter waste
Bauxite: Mining & enhancing
bauxite resources for the cement,
aluminium & fertiliser industries
12
Investment Proposition
Highest proportion of Dy+Tb of any clay-hosted resource in Australia
Simple processing without drill and blast mining, or use of acids
Supply Shortage
Team
Massive demand growth for rare
earths
Mineralogy and REE
Distribution
Pathway to Production
Jurisdiction
Experienced and capable
No acid required for processing
Balance of light and heavy REE
Commercial forest plantation in
Australia
Bauxite mining is enabler
Infrastructure
Less than 50 km to industrial
centre and enabling infrastructure
ASX: ABX
13
Massive demand growth for rare earths
Electric motors require permanent magnets containing rare earths
Dysprosium demand ($billion)
$6
$5
$4
$3
$2
$1
$0
2020 Capacity
2030 High Demand
Sources: US DoE, Critical Minerals Assessment, 2023; Ginger International Trade & Investment
Source: Adamas Intelligence
• Demand for NdFeB magnets forecast to increase
at a CAGR of 8.7% for 2024 to 2040
ASX: ABX
• Of the rare earths, dysprosium has the most
acute supply risk
14
ABx Deep Leads Rare Earth Project
•
Upgrade to 89 Mt announced May 20241
•
Over 10-fold increase in 12 months
Size
Cut-off
(ppm
TREO-CeO2)
Mean
TREO
(ppm)
Mean
TREO-CeO2
(ppm)
DyTb3
(%TREO)
89 Mt2
350
844
652
4.3%
Holes
drilled
Metres drilled
(m)
Metres assayed
(m)
From
(m)
To
(m)
1,077
9,742
3,843
4.2
12.0
Resource based on only 29% of identified
mineralised outline1
Source: ABX ASX Announcement, 2 May 2024
1ABX ASX Announcement, 2 May 2024
241 Mt inferred, 42 Mt indicated and 6 Mt measured
3DyTb = Dy O + Tb O
2 3
4 7
ASX: ABX
15
Deep Leads mineralogy is amenable to low cost processing
•
Rare earths can be extracted from an ionic adsorption
clay ore in less than 30 minutes at pH 4 or above. They
do not require acid
•
Avoidance of acid significantly reduces impurities and
hence operating cost
•
Most clay-hosted deposits are not ionic
Company
Project
Country
Proposed Leaching
ABx
Deep Leads
Australia
AMSUL, pH 4
Australian Rare Earths
Koppamuura
Australia
MGSUL, pH 1-2.2
OD6
Splinter Rock
Australia
HCl, 25 g/L
Meteoric Resources
Caldeira
Brazil
4
Ionic Rare Earths
Makuutu
Uganda
2
Cost and Price (per kg proudct)
Deep Leads is one of the few ionic adsorption clay resources
Operating cost
1 Non-Ionic
(acid )
Sources: See Appendix 1
2
3
pH
Ionic 4
(non-acid)
Illustrative cost curve for clay-hosted rare earth resources
ASX: ABX
16
Deep Leads has ideal balance of light and heavy rare earths
ABx rare earth product will be attractive to separation
plants
•
ABx will be more resilient to variation in demand for light
and heavy rare earths
Company
Project
Country
•
%NdPr
%DyTb
ABx
Deep Leads
Australia
21.8%
4.3%
Lynas
Mt Weld
Australia
23.3%
0.4%
MP Materials
Mountain Pass
USA
16.4%
-
Meteoric
Resources
Caldeira
Brazil
23%
1.1%
Sources: See Appendix 2
ABx has among the highest Dy and Tb grades of any
ionic adsorption clay deposit
40
35
30
Dy2O3 + Tb4O7 (ppm)
•
25
20
15
10
Feature
5
Light rare earth
Provide magnetic strength
0
Heavy rare earth
Retain magnetic properties at high
temperatures
Rare earth
Type
Nd and Pr
Dy and Tb
Ema (Brazil)
Kennedy (QLD)
Caldeira (Brazil)
Colossus (Brazil) Deep Leads (TAS)
Sources: See Appendix 3
ASX: ABX
17
Pathway to Production: Rapid project advancement
Extensive exploration
for bauxite in northern
Tasmania
Re-analysis of
previous bauxite
assay results
2010 - 2019
Mining of
bauxite at Bald
Hill
2020
Commenced exploration
drilling for rare earths on
existing exploration leases
2021
Re-assaying of
existing samples
for rare earths
Maiden rare
earths resource
estimate
2022
First ANSTO metallurgical
results, indicating ionic
adsorption clay
Most recent resource
estimate: 89 Mt1 at
844 ppm TREO
2023
Two further exploration
leases granted: EL27/2022
and EL28/2022
2024
Signed MoU with
Ucore
141 Mt inferred, 42 Mt indicated and 6 Mt measured
ASX: ABX
18
Pathway to Production: Vision for
rare earths business
Expansion
Project Development
Demonstrate project feasibility
Production
Identify additional ionic
adsorption clay rare earth
resources
Construct mine and plant to
produce mixed rare earth carbonate
Deep Leads Project Enabler: Bauxite Mining
Pre-strip bauxite mining to supply cement and fertiliser plants
Project will expose rare earths and provide funding for rare earths development
ASX: ABX
Value-adding
Construct plant to produce
separated rare earth oxides
19
Pathway to Production: Bauxite operations
• ABx mined bauxite northern Tasmania from
2014 to 2020, and sold the product to cement
and fertiliser plants. Customer demand is
ongoing1
• Similar bauxite resource overlays Deep Leads
rare earth resource
• Bauxite mining operations will expose rare earth
mineralisation and enable rare earths project to
be fast tracked
• Bauxite sales will provide cashflow for funding
rare earths development
• Bauxite mining licence application submitted.
Operations expected to commence in Q1 2025
ABx bauxite mining at Bald Hill Project near Campbell Town, Tasmania in 2020
1ABx ASX Announcement, 11 September 2023
ASX: ABX
20
Pathway to Production: Strategic and offtake partnerships
Offtake Interest
• Executed MOU for offtake and potential investment with
Ucore, who is undertaking technology transfer from
demonstration scale to commercial scale rare earth oxide
separation in North America
Strategic Investor Interest
• Engaging with deep-pocketed long-term investors with
strategic interest in rare earths supply chain
Government Support
• Engaged with the Australian and Tasmanian governments’
critical minerals strategies – potential for the company to
receive financial support
Ucore RapidSX demonstration plant in Kingston, Canada
ASX: ABX
21
Deep Leads is in outstanding jurisdiction and location
Commercial plantation forest area in Tasmania, Australia
Deep
Leads
• Deep Leads located in recently harvested commercial hardwood
plantation, close to town of Launceston and Bell Bay port
• Australian supply highly attractive to global customers
• ABx has operated in region for over 10 years
ASX: ABX
22
Significant infrastructure locally available
Infrastructure
Transport
Less than 20 km to major
highway
Less than 100 km to
deepwater Bell Bay port
Labour
Less than 50 km to
Launceston (pop 65,000)
Water
High availability in Tasmania
Energy
Close to major transmission
lines
Greater than 90% of Tasmania
energy demand generated by
renewables1
12018-23, Open Electricity
ASX: ABX
23
Investment Proposition
Highest proportion of Dy+Tb of any clay-hosted resource in Australia
Simple processing without drill and blast mining, or use of acids
Supply shortage
Team
Massive demand growth for rare
earths
Mineralogy and REE
Distribution
Pathway to Production
Jurisdiction
Experienced and capable
No acid required for processing
Balance of light and heavy REE
Commercial forest plantation in
Australia
Bauxite mining is enabler
Infrastructure
Less than 50 km to industrial
centre and enabling infrastructure
ASX: ABX
24
ABx Group Limited
www.abxgroup.com.au
Level 4, 100 Albert Rd
South Melbourne VIC 3205
Australia
Phone: +61 3 9692 7222
E: investors@abxgroup.com.au
Mark Cooksey
Managing Director and CEO
E: mcooksey@abxgroup.com.au
Appendix 1
Company
Project
Country
Stage
Study
Level
Resource
Mt
Type
Grade
(TREO)
(ppm)
Cut-off grade
(TREO-CeO2)
(ppm)
Proposed leaching conditions
Reference
Conditions
Reference
ABx
Deep Leads
Australia
Exploration
-
89
Meas +
Ind + Inf
844
350
ABX ASX
Announcement
Table 1
2 May
2024
AMSUL
pH 4
ABX ASX
Announcement
31 May
2022
Australian
Rare Earths
Koppamurra
Australia
Exploration
-
236
Meas +
Ind + Inf
748
325
AR3 ASX
Announcement
Table 1
30 Sep
2024
MGSUL
pH 1-2.2
AR3 ASX
Announcement
AR3 ASX
Announcement
16 May
2023
8 July
2024
OD6
Splinter Rock
Australia
Exploration
-
682
Ind + Inf
1,338
1,0002
OD6 ASX
Announcement
Table 1
29 May
2024
HCl,
25g/L
OD6 ASX
Announcement
16 Oct
2024
Meteoric
Resources
Caldeira
Brazil
Exploration
Scoping
409
Inferred
2,626
1,0002
MEI ASX
Announcement
Table 2
1 May
2023
AMSUL
pH 4
MEI ASX
Announcement
8 July
2024
Ionic Rare
Earths
Makuutu
Uganda
Exploration
DFS
532
Ind + Inf
640
200
IXR ASX
Announcement
Table 3
20 Mar
2023
AMSUL
pH 2
IXR ASX
Announcement
20 Mar
2023
1Meas = Measured, Ind = Indicated, Inf = Inferred
2Cut-off grade is TREO (ppm)
The resource figures provided are the most recent reported by each company, and at the desired reported cut-off grade provided by each company’s headline numbers. Each resource model contains its own economic
and geological assumptions not represented in this table. Resource sizes and grades vary depending on the cut-off used by the specific company.
The leaching conditions provided are the most representative provided by each company. In the case of a DFS, PFS or scoping study, they are the conditions used as the base case in that study. In other cases, they are
those reported as ‘optimum’ by the company
ASX: ABX
26
Appendix 2
Company
Project
Country
Stage
Study
Level
Resource (Mt)
Mt
Type1
Grade
(TREO)
(ppm)
Cut-off
grade (TREO)
(ppm)
%Pr2
%Nd2
%Tb2
%Dy2
Reference
ABx
Deep
Leads
Australia
Exploration
-
89
Meas +
Ind + Inf
844
3503
4.4%
17.4%
0.62%
3.7%
ABX ASX
Announcement
Table 1
2 May
2024
Lynas
Mt Weld
Australia
Production
-
106.6
Meas +
Ind + Inf
41,000
25,000
5.1%4
18.3%4
0.16%4
0.6%4
LYC ASX
Announcement
Table 1
Table 7
5 Aug
2024
MP Materials
Mountain
Pass
USA
Production
-
9.095
Ind + Inf
50,500
21,800
4.2%
12.1%
0.0%
0.0%
MP Materials
Form 10-K for 31
Dec 2023
Page 22
22 Feb
2024
Meteoric
Resources
Caldeira
Brazil
Exploration
Scoping
409
Inferred
2,626
1,0002
5.9%
17.0%
0.19%
1.0%
MEI ASX
announcement
Table 2
1 May
2023
1Meas = Measured, Ind = Indicated, Inf = Inferred
2%Pr = Pr O / TREO, %Nd = Nd O / TREO, %Tb = Tb O / TREO, %Dy = Dy O / TREO,
6 11
2 3
4 7
2 3
3Cut-off grade is TREO-CeO (ppm)
2
4For 32.0 Mt reserve, not 106.6 Mt resource
5Short tons
The figures provided are the most recent reported by each company, and at the desired reported cut-off grade provided by each company’s headline numbers. Each resource model contains its own economic and
geological assumptions not represented in this table. Resource sizes and grades vary depending on the cut-off used by the specific company.
ASX: ABX
27
Appendix 3
Company
Project
Country
Stage
Study
Level
Resource (Mt)
Mt
Type1
Grade
(TREO)
(ppm)
Cut-off
grade
(TREO-CeO2)
(ppm)
Tb4O7
(ppm)
Dy2O3
(ppm)
Reference
Brazilian Critical
Minerals
Ema
Brazil
Exploration
-
1,017
Inferred
793
500
4
13
BCM ASX
Announcement
Table 1
22 Apr
2024
Devex Resources
Kennedy
Australia
Exploration
-
150
Inferred
1,000
325
3.7
22
DEV ASX
Announcement
Table 2
4 Jul
2024
Meteoric
Resources
Caldeira
Brazil
Exploration
Scoping
409
Inferred
2,626
1,0002
5
25
MEI ASX
Announcement
Table 2
1 May
2023
Viridis Mining
and Minerals
Colossus
Brazil
Exploration
Scoping
201
Indicated
+ Inferred
2,590
1,0002
5
27
VMM ASX
Announcement
Page 4
4 June
2024
ABx
Deep
Leads
Australia
Exploration
-
89
Meas +
Ind + Inf
844
350
5.2
31
ABX ASX
Announcement
Table 1
2 May
2024
1Meas = Measured, Ind = Indicated, Inf = Inferred
2Cut-off grade is TREO (ppm)
The figures provided are the most recent reported by each company, and at the desired reported cut-off grade provided by each company’s headline numbers. Each resource model contains its own economic and
geological assumptions not represented in this table. Resource sizes and grades vary depending on the cut-off used by the specific company.
ASX: ABX
28
Share your feedback
Discover