Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
31 October 2024
ASX: ABX
Quarterly report and activity statement
3 months to 30 September 2024
Highlights
Ionic adsorption clay rare earth project in Tasmania
Signed Memorandum of Understanding with Ucore, to discuss a binding offtake
agreement and potential investment by Ucore into ABx
Awarded an Exploration Drilling Grant Initiative (EDGI) grant from Mineral Resources
Tasmania, which provides for up to $70,000 for half of the drilling costs for a drilling
program at the EL27/2022 exploration tenement
Production of hydrogen fluoride and aluminium fluoride from aluminium smelter
waste (ALCORE)
Achieved maximum of 97% fluorine recovery, an increase over the previous best of 93%
Commercial discussions are being finalised with strategic investors, including locating
the continuous pilot plant at an alternative, superior site
Bauxite operations (Queensland and Tasmania)
Negotiations are continuing with multiple potential offtake partners for potential long
term supply contracts from Binjour, Queensland
For the DL130 Bauxite Project in Tasmania, a response is being prepared to the Request
for Additional Information issued by the EPA
Corporate
Mr Paul Lennon AO retired from his position as Non-Executive Chair, including his Chair
position on the Company’s 83%-owned subsidiary ALCORE Limited, and was replaced
by Ms Joycelyn Morton
ABx Group Limited (ASX: ABX) is a uniquely positioned Australian company delivering materials
for a cleaner future.
ABx Group Limited
ABN 14 139 494 885
ASX: ABX
Level 4, 100 Albert Road, South Melbourne, VIC 3205
P: +61 3 9692 7222
F: +61 2 9956 7355
Quarterly report to 30 September 2024
Rare Earths: Signed Memorandum of Understanding with Ucore
ABx executed a Memorandum of Understanding (MOU)1 with Ucore, a Canadian public
company with a patent-pending rare earth separation technology, RapidSX™. The MOU
describes how:
o
ABx and Ucore will work toward a binding offtake agreement for the supply of an
intermediate rare earth product, which is envisaged to be a mixed rare earth
carbonate (MREC), by ABx to Ucore. The intent is for Ucore to obtain ‘first right of
refusal’ for 50% of ABx annual volume for a minimum period of five years, subject to
the agreement of commercial terms;
o
The parties will explore potential investment by Ucore into the ABx rare earth project
as well as project finance opportunities for the ABx and Ucore projects, which may
involve joint approaches to companies active in the rare earth value chain,
governments, institutional funds, and private investors;
o
ABx and Ucore will collaborate to develop and optimise:
a comprehensive product flowsheet considering where best to implement
collective project efficiencies; and
a total project development strategy, including laboratory, pilot, and
demonstration plant testing.
ABx conducted a 37-hole drilling campaign at the Company’s Deep Leads project, located
approximately 45 km west of Launceston, Tasmania2. This area was directly northwest of the
high-grade Deep Leads discovery. All assay results were received and several intercepts were
considerably thicker than usual and extend ABx’s REE mineralisation across the plateau.3
ABx was awarded an Exploration Drilling Grant Initiative (EDGI) grant from Mineral Resources
Tasmania, with the grant deed to be finalised. This provides for up to $70,000 for half of the
drilling costs for a drilling program at the EL27/2022 exploration tenement, located near
Launceston and 52 km east of ABx’s major Deep Leads / Rubble Mound REE project.
Applications for two exploration leases are in progress, including EL25/2022 covering the 16
km extension from Deep Leads / Rubble Mound to the Wind Break REE discovery area
in-house desorption tests were conducted
Discussions continued with a number of potential customers in North America and Europe
for an ABx mixed rare earth carbonate (MREC) product. The discussions highlighted the
particularly acute supply risks for dysprosium and terbium.
1
ASX Announcement, 4 September 2024
ASX Announcement, 15 July 2024
3
ASX Announcement, 7 August 2024
2
2
Quarterly report to 30 September 2024
Rare Earths Strategy
Rare earths have many applications in a wide variety of industries. Permanent magnets are the
most valuable application, representing over 90% of the total value of rare earths demand.
Permanent magnets are used in electric vehicles, wind turbines, smartphones and military
applications. The four most important rare earths for permanent magnets are neodymium (Nd),
praseodymium (Pr), dysprosium (Dy) and terbium (Tb). The demand for these four rare earths is
predicted to grow significantly in coming years, potentially leading to significant supply shortfalls.
The supply risk is highest for dysprosium and terbium, the two heavy rare earths in permanent
magnets.
Globally, most rare earths are sourced from mineral deposits. These typically require large,
costly processing plants and a significant lead time to reach production.
An alternative source of rare earths is clay-hosted deposits. These typically contain a mixture of
ionic adsorption clay (IAC, the ionic component) and a non-ionic component. The relative
proportions of each in different deposits varies enormously. The rare earths in the ionic
component can be leached using a low-cost desorption process, which produces a solution
containing rare earths that is subsequently precipitated into a mixed rare earth carbonate
(MREC). Industry processing experts indicate that it is very difficult to economically extract rare
earths from the non-ionic component. Thus it is critical to have a high ionic proportion.
The other major advantages of ionic adsorption clay deposits are:
Higher proportion of heavy rare earths compared to mineral deposits
Low concentrations of radioactive elements such as uranium and thorium
Typically exist at shallow depth
These advantages mean that:
The minimum viable project for an ionic adsorption clay project is typically significantly
smaller than for a mineral project. Crucially, this means that considerably less capital,
time and risk is typically required to deliver a cash-flow positive ionic adsorption clay
project compared to a mineral project
The basket price for a concentrate from an ionic adsorption clay deposit is typically higher
than one from a mineral deposit.
Ionic adsorption clay deposits have historically been mined only in southern China.
ABx is the first company to discover rare earths in Tasmania (Figure 1) and has reported a JORCcompliant mineral resource of 89 million tonnes4 at its Deep Leads - Rubble Mound and Wind
Break deposits.5 The resource contains 36 ppm DyTb,6 the highest of any clay-hosted rare earths
4
41 Mt inferred, 42 Mt indicated and 6 Mt measured
ASX Announcement, 2 May 2024
6
DyTb = Dy2O3 + Tb4O7
5
3
Quarterly report to 30 September 2024
resource in Australia and one of the highest in the world. This contributes to a higher basket
price. Furthermore, the level of radioactive elements is very low (2 ppm U2O3 and 6 ppm ThO2).
ABx engaged Australian Nuclear Science and Technology Organisation (ANSTO) to conduct
desorption tests, which found the highest extractions under relatively neutral conditions
reported from any clay-hosted resource in Australia,7,8 which means that the ABx resource has
the highest ionic proportion of any clay-hosted rare earths resource in Australia.
The ABx rare earth deposits are located in accessible forest plantations near highways, ports,
railways, airports, grid hydropower and major towns.
The ABx strategy is to produce a mixed rare earth carbonate that can be sold to rare earth
separation plants, for conversion into separated rare earth oxides. Numerous discussions with
potential customers and investors have confirmed the particular strengths of the ABx rare earth
deposits:
High levels of dysprosium and terbium
High ionic component
Located in Australia
The next stages of the project are:
7
8
Further exploration, primarily to identify the preferred initial mining location
Metallurgical studies, to develop an understanding of the parameters that affect the
performance of each process step (desorption, impurity removal and precipitation)
Developing a preferred process and initial cost model
ASX Announcement, 31 May 2022
ASX Announcement, 2 February 2023
4
Quarterly report to 30 September 2024
ABx tenements
EL7/2010
Launceston
EL9/2010
EL18/2014
Hobart
EL10/2021
EL25/2022
EL27/2022
EL28/2022
Applicafion
Wind Break
Launceston
Infrastructure
Airport
Deep
Leads
Railway
Rubble
Mound
Main Road
Secondary Road
NEW
EL27/2022
NEW
EL28/2022
Figure 1: ABx leases in the 52 km wide REE province in northern Tasmania.
5
Quarterly report to 30 September 2024
ALCORE: achieved 97% fluorine recovery using bath pilot batch reactor
Rigorous investigation of process conditions continued using the bath pilot batch reactor,
which had been commissioned in October 2023.9 The latest rector results have seen
ALCORE achieve 97% fluorine recovery10, improving upon the previous best of 93%, a
result which was already deemed very likely to be sufficient in a commercial plant.11
This headline 97% recovery was delivered using the bath pilot batch reactor followed by
further manual processing of some product material in a separate furnace. In the
Company’s latest test run, the bath pilot batch reactor delivered 85% fluorine recovery –
the highest achieved from a single stage. The continuous pilot plant reactor will
incorporate the two-stage design and will operate under similar processing conditions.
An extensive literature review revealed a number of options for further processing and
sale of the metal sulfate products.
Commercial discussions are being finalised with strategic investors, including locating the
continuous pilot plant at an alternative, superior site, instead of the ALCORE Technology
Centre on the NSW Central Coast. Ordering of continuous pilot plant reactors is being
deferred until those commercial discussions are finalised.
9
ASX announcement, 8 November 2023
ASX announcement, 30 October 2024
11
ASX Announcement, 4 June 2024
10
6
Quarterly report to 30 September 2024
ALCORE Strategy
Hydrogen fluoride is an essential chemical for the production of fluorocarbons and
aluminium fluoride. Aluminium fluoride is an essential chemical for aluminium metal
production. Fluorine was added to Australia’s critical minerals list in 2023.
Hydrogen fluoride is mainly produced from fluorspar, which is obtained from the mineral
fluorite. Fluorspar is relatively high cost and has been identified as a critical material by the
USA, Europe, Japan and Canada.
Australia does not mine any fluorite, or produce any fluorspar, hydrogen fluoride or
aluminium fluoride, and so must import all its requirements. The Australian demand for
hydrogen fluoride is small, and it is imported at high cost. Conversely, Australia is a
significant producer of aluminium and so its demand for aluminium fluoride is high.
Australia is the largest producer of primary aluminium metal without its own domestic
aluminium fluoride production, so Australian aluminium smelters rely entirely on imported
aluminium fluoride, typically more than 80% from China. The average aluminium fluoride
price (FOB China) has been more than US$1,350/t for the past two years.
Most modern aluminium smelters produce excess bath, for which the only meaningful
market is new smelters, which require bath to commence operations. Aluminium industry
forecasts suggest that the global bath market will increasingly be in surplus, because far
fewer new smelters are being constructed. All the major global aluminium producers are
eager for alternative applications for excess bath, to avoid the unpalatable options of on-site
storage or landfill.
ALCORE has developed a world-first process to produce industrial chemicals from aluminium
smelter bath waste. The major products are hydrogen fluoride and metal sulfates. The
hydrogen fluoride is combined with aluminium hydroxide to produce aluminium fluoride via
an existing commercial process. The combined approach is illustrated in Figure 3.
ALCORE intends to construct commercial hydrogen fluoride and aluminium fluoride plants
in Bell Bay, Tasmania. In 2022, ALCORE received a $7.6 million grant from the Australian
Government’s Modern Manufacturing Initiative (MMI) to support the project.12
The process to produce hydrogen fluoride has been operated at pilot scale in a batch reactor.
The next stage is to construct and operate a bath continuous pilot plant, the outcomes of
which will be:
1. Selection of reactor designs and process conditions for the commercial plant
2. Production of saleable hydrogen fluoride for evaluation by customers
The metal sulfates can potentially be sold as a single industrial chemical, or further
processed into multiple industrial chemicals. A range of options is being assessed.
12
ASX Announcement, 29 April 2022
7
Quarterly report to 30 September 2024
Smelter bath
Aluminium
smelting
AIF3
HF
Aluminium
fluoride
Hydrogen
fluoride
Graphite
purification,
fluorochemicals,
etc.
Figure 3: Circular economy approach of recycling aluminium smelter bath into aluminium fluoride
8
Quarterly report to 30 September 2024
Bauxite Operations
Sunrise Bauxite Project: Binjour, Queensland
Application for a standard environmental authority (EA) for Mine Lease 100277 was
submitted to the Department of Environment, Science, and Innovation.
The Queensland Government approved a $7,500,000 upgrade of the Biggenden Railway
Crossing (overpass removal). This initiative will significantly improve regional freight
efficiency and project route logistics.
The Port of Bundaberg has commenced operations of its multi-use conveyor. This is
designed for a variety of bulk minerals, providing additional bauxite export capability and
options for the project.
DL130 Bauxite Project: Tasmania
Following public submissions to the planning permit application advertised by the
Meander Valley Council, the EPA issued a Request for Additional Information. The main
requirements are a Dust Management Plan and Stormwater Management Plan, which
are being prepared. The Stormwater Management Plan also required some additional
environmental testing, which has been completed
ABx held two community drop-in sessions in Westbury and Deloraine, where
management and staff were available to answer any questions from the community.
Bauxite Strategy
The ABx strategy is to selectively produce metallurgical grade, cement grade and fertiliser
grade bauxite, with a focus on profitability. ABx bauxite can substantially improve the
properties of superphosphate fertiliser.
The largest project is the Sunrise Bauxite Project in Queensland, with a JORC compliant
resource of 37 million tonnes, supporting 20-25 years production. It is anticipated that the
mine will export 500,000 tonnes per year of metallurgical grade bauxite in its first year of
production, then scale up to full operational capacity of 1.5 million tonnes per year.
In February 2022, ABx entered a JV with Alumin for the development of the Sunrise Bauxite
Project, comprising a bauxite mine at Binjour and port operations at Bundaberg.13 Alumin is
an Australian special purpose vehicle company associated with our strategic marketing
partner, Rawmin India, having extensive experience in funding long term sustainable
investments in projects involving mining and bulk-shipping of metallurgical grade bauxite to
end users around the world.
Alumin is continuing negotiations with multiple interested parties to secure long-term
offtake agreements, reflecting the growing global demand for bauxite and the limited
number of options for new supply. Project investment is likely to be contingent on securing
13
ASX Announcement, 28 February 2022
9
Quarterly report to 30 September 2024
offtake agreements. Once investment is secured, full project activities will commence. As
such, the projected operational commencement has been revised to late 2025 / early 2026.
In Tasmania, ABx has three bauxite deposits and has previously mined at Bald Hill near
Campbell Town. ABx plans to recommence bauxite mining at the DL130 Bauxite Project and
assessment of the mine lease application by Meander Valley Council, the EPA and Mineral
Resources Tasmania is in progress. The primary products are likely to be cement grade and
fertiliser grade bauxite. In September 2023, an agreement was executed with Adelaide
Brighton Cement Limited (ABCL), a subsidiary of Adbri Limited (ASX:ABC), for the supply of
cement-grade bauxite to ABCL’s Birkenhead cement manufacturing operation in South
Australia.14 The agreement forecasts supply of 90,000-120,000 tonnes of bauxite over a fiveyear term. Bauxite production was expected to commence in Q4 2024 but, due to the request
for additional information issued by the EPA, is now expected to be Q1 2025.
Corporate
Retirement of Paul Lennon and Appointment of Ms Joycelyn Morton as Chair
Mr Paul Lennon AO retired from his position as Non-Executive Chair, effective 30 September
2024, including his Chair position on the Company’s 83%-owned subsidiary ALCORE
Limited15.
Ms Joycelyn Morton was appointed Non-Executive Chair of ABx and ALCORE. Ms Morton was
appointed to the ABx Board in April 202416 and in a short time has demonstrated her
leadership and experience, and acquired a deep understanding of the strengths and
opportunities for ABx.
Mr Rex Adams has resigned from his position as non-executive director of the Company’s
83%-owned subsidiary ALCORE Limited, effective 31 October 2024. Mr Adams was an
inaugural director of ALCORE from 2018, and provided wise guidance to the development of
the technology over the past six years.
Updated rare earths and ALCORE presentations have been placed on the ABx website
www.abxgroup.com.au.
This announcement is approved for release by the board of directors.
For further information please contact:
Dr Mark Cooksey
MD & CEO
Media
Chapter One Advisors
14
ASX Announcement, 11 September 2023
ASX Announcement, 30 September 2024
16
ASX Announcement, 3 April 2024
15
10
Quarterly report to 30 September 2024
ABx Group
+61 447 201 536
mcooksey@abxgroup.com.au
www.abxgroup.com.au
David Tasker / Alex Baker
+61 433 112 936 / +61 432 801 745
dtasker@chapteroneadvisors.com.au /
abaker@chapteroneadvisors.com.au
11
Quarterly report to 30 September 2024
Qualifying statements
General: The information in this report that relate to Exploration Information and Mineral Resources are based on
information compiled by Jacob Rebek and Ian Levy who are members of The Australasian Institute of Mining and
Metallurgy and the Australian Institute of Geoscientists. Mr Rebek and Mr Levy are qualified geologists and Mr Levy is
a director of ABx Group Limited.
Mainland: The information relating to Mineral Resources on the Mainland was prepared and first disclosed under the
JORC Code 2004. It has not been updated since to comply with the JORC Code 2012 on the basis that the information
has not materially changed since it was last reported. Mr Rebek and Mr Levy have sufficient experience, which is relevant
to the style of mineralisation and type of deposit under consideration and to the activity, which they are undertaking to
qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of exploration Results,
Mineral Resources and Ore Reserves. Mr Rebek and Mr Levy have consented in writing to the inclusion in this report of
the Exploration Information in the form and context in which it appears.
Tasmania: The information relating to Exploration Information and Mineral Resources in Tasmania has been prepared
or updated under the JORC Code 2012. Mr Rebek and Mr Levy have sufficient experience, which is relevant to the style
of mineralisation and type of deposit under consideration and to the activity, which they are undertaking to qualify as
a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves. Mr Rebek and Mr Levy have consented in writing to the inclusion in this report
of the Exploration Information in the form and context in which it appears.
The information relating to the latest REE Resources update is extracted from the report entitled “ABx Rare Earth
Resources Increase 70% to 89 Million Tonnes” dated 2 May 2024 and is available to view on
https://www.abxgroup.com.au/site/investor-information/asx-announcements.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the company’s market announcements and, in the case of estimates of Mineral Resources or Ore Reserves,
that all material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed.
The Company also confirms that the form and context in which the Competent Person’s findings are presented have
not been materially modified from the original market announcements.
Disclaimer Regarding Forward Looking Statements
This ASX announcement (Announcement) contains various forward-looking statements. All statements other than
statements of historical fact are forward-looking statements. Forward-looking statements are inherently subject to
uncertainties in that they may be affected by a variety of known and unknown risks, variables and factors which could
cause actual values or results, performance or achievements to differ materially from the expectations described in
such forward-looking statements.
ABx does not give any assurance that the anticipated results, performance or achievements expressed or implied in
those forward-looking statements will be achieved.
Patent
Refined Ore Industries Ltd (ROIL) was the owner of the CORE process technology via ROIL’s intellectual property
company, Berkeley Process Technologies Pty. Ltd which issued a global exclusive licence for the aluminium-related
portion of the CORE process technology to ABx in November 2017 and ABx has issued a global exclusive sub-licence
to ALCORE when ALCORE was incorporated on 1 July 2018.
After a company restructure and expansion of the patent definition to cover isolation and extraction of mineral
compounds, metals, metalloids, alloys and elements from waste streams, mineral ores, recyclable commodities,
industrial by-products and mixed substances, the holding company is now named Core Refining Limited (CRL) and the
intellectual property company is Core Intelligence Australia Pty Ltd (CIAL) which holds the Patent Application No.
2019904311 and the global exclusive licences to ABx and ALCORE continue in force.
CRL’s CORE process technology involves the refining of a wide range of ore types using a combination of fluorine acids
and related thermal energy process steps. The technology that is licensed to ABx and ALCORE by CRL is part of CRL’s
broader Core technology.
12
Quarterly report to 30 September 2024
Table 1: Tenement information required under LR 5.3.3
Tenement No.
Location
New South Wales
EL 9593
Taralga
EL 9664
Penrose Quarry
Queensland
MLA 100277
Sunrise ML application
EPM 27787
Binjour
ML 80126
Toondoon ML
Tasmania
EL 7/2010
Conara
EL 9/2010
Deloraine
EL 18/2014
Prosser’s Road
EL 10/2021
Rubble Mound
EL 27/2022
Temple Bar
EL 28/2022
Triangle Flats
Notes: No tenements were relinquished.
All tenements are in good standing, 100% owned and not subject
to any third-party royalties nor are they encumbered in any way.
Information required under Listing Rule 5.3.1: Exploration expenditure reported during the quarter related to
the rare earth project development ($525,000), research conducted by ALCORE with respect to its reported
advancements ($229,000), and staff, administration and corporate costs amounted to ($570,000).
Information required under Listing Rule 5.3.2: No mining production was conducted during the quarter.
Information required under Listing Rule 5.3.5: The payments as disclosed in section 6.1 of the Appendix 5B
amounting to $120,000 relate to payment for Director’s fees and salaries.
13
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
ABx Group Limited
ABN
Quarter ended (“current quarter”)
14 139 494 885
30 September 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (9
months)
$A’000
-
101
(a) exploration & evaluation
-
-
(b) research & development
(229)
(738)
(c) production
-
-
(d) staff costs
(225)
(500)
(e) administration and corporate costs
(345)
(865)
-
-
37
134
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
943
1,423
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
181
(445)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(525)
(1,431)
(e) investments
-
-
(f)
-
-
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Proceeds from the disposal of:
Current quarter
$A’000
Year to date (9
months)
$A’000
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets (release of
MMI funds held-in-trust)
370
1,470
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
(9)
2.6
Net cash from / (used in) investing
activities
(155)
30
-
616
(a) entities
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(73)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
-
543
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
438
336*
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
181
(445)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(155)
30
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date (9
months)
$A’000
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
543
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
464
464
* Cash and cash equivalents at the beginning of the period has been updated in accordance with the
audited consolidated financial statements of ABx Group Limited for the year ended 31 December 2023.
As at 30 September 2024, in addition to the cash and cash equivalent of $464k (31 December 2023:
$336k), the company has access to $3.57 million (31 December 2023: $5.52 million) as held in trust.
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
424
398
5.2
Call deposits
40
40
5.3
Bank overdrafts
-
-
5.4
Other
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
464**
438**
** As at end of current quarter, in addition to the cash and cash equivalent of $464k (End of previous
quarter: $438k), the company has access to $3.57 million (End of previous quarter: $3.97 million) as
held in trust.
6.
Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
120
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or uns