Quarterly report and activity statement
3 months to 30 June 2023
Highlights
Rare earths (ionic adsorption clay resource in Tasmania)
Resource increased by 50% to 21 million tonnes averaging 770 ppm TREO and 585 ppm
TREO-CeO2 at a cut-off grade of 250 ppm TREO-CeO2. Post quarter end, resources
further increased to 27 million tonnes
Recent results indicate that the rare earth mineralisation could extend 16 km from the
Deep Leads / Rubble Mound resource to the Wind Break discovery
Production of hydrogen fluoride and aluminium fluoride from aluminium smelter
waste (Alcore)
Received the $2.7 million second instalment of the previously announced $7.5 million
in grant funding under the Federal Government’s Modern Manufacturing Initiative
(MMI)
Completed preliminary engineering design for pilot plant. Orders for major equipment
planned to be placed by September
Lab bath reactor MkII planned to be delivered in August, which will expedite process
development
Post quarter-end, received an R&D tax offset of $522,715.81 from the Australian Tax
Office for activities undertaken during 2022
Bauxite Operations (Queensland and Tasmania)
1,000 tonnes of bauxite were excavated from a trial pit at the DL130 Project in Tasmania
and provided to two customers
A multi-year supply agreement for cement-grade bauxite is being negotiated with a
customer
Corporate
Group available cash at quarter end was $5.89 million
ABx securities total 223,590,814 ordinary shares
ABx Group Limited
Level 5 52 Phillip Street Sydney NSW 2000
ABN 14 139 494 885
P: +61 2 9251 7177
F: +61 2 9251 7500
ABxGroup
Quarterly report to 30 June 2023
page 2
ABx Group (ASX: ABX) is a uniquely positioned, high-tech Australian company delivering
materials for a cleaner future.
Rare Earths: Ionic adsorption clay resource increased by more than 50%
•
The mineral resource estimate for the Deep Leads / Rubble Mound project was increased to
21 million tonnes1 averaging 770 ppm TREO and 585 ppm TREO-CeO2 at a cut-off grade of
250 ppm TREO-CeO2.2
•
Post quarter, the resource estimate was further increased to 27 million tonnes3 averaging
803 ppm TREO and 603 ppm TREO-CeO2.4 This resource estimate includes all assay results
from samples obtained from the drilling program completed during January-April 2023.
•
The northernmost discovery hole, RM302, located 5 km NE of Deep Leads, could become the
Company’s best prospect. At 11 metres thick, RM302 is highly enriched in permanent magnet
rare earths, especially dysprosium (Dy) and terbium (Tb) (4.7% of TREO). Hole RM302 also
indicates that this rare earth mineralisation could extend 16 km to the Wind Break discovery.
•
Mineral Resources Tasmania has approved a small drilling program near hole RM302. This
is planned for August.
•
A grant for drilling at the Wind Break discovery was received from Mineral Resources
Tasmania for Round 8 of the Exploration Drilling Grant Initiative (EDGI). The funding is for up
to a maximum of $70,000 on a dollar-for-dollar basis.
•
The estimated area within the drilling boundary is 28 km2, of which assay results show that
15 km2 is mineralised above cut-off grade. The area covered by the 27 Mt resource estimate
is 3.3 km2, which is 22% of the estimated mineralised area.
•
Exploration licence application covering the 16 km extension from Deep Leads / Rubble
Mound to the Wind Break REE discovery area is in progress, which will expand the rare earths
target area from 35 km2 to more than 100 km2.
•
ABx has also made two large exploration licence applications covering other key areas in
northern Tasmania south of the Portrush REE discovery area (Figure 1).
•
Market discussions with several potential customers endorsed the ABx strategy of producing
a mixed rare earth carbonate for sale to existing processing plants. ABx’s IAC rare earths are
attractive, with low radioactivity and high heavy rare earths, which are needed for permanent
magnets.
1
17 Mt inferred and 4 Mt indicated
ASX announcement 8 May 2023
3
24 Mt inferred and 4 Mt indicated
4
ASX announcement 18 July 2023
2
ABxGroup
Quarterly report to 30 June 2023
page 3
ABx Rare Earths Strategy
Rare earths have many applications in a wide variety of industries. Permanent magnets are the
most valuable application, representing over 90% of the total value of rare earths consumption.
Permanent magnets are used in electric vehicles, wind turbines, smartphones and military
applications. The four most important rare earths for permanent magnets are neodymium,
praseodymium, dysprosium and terbium. Furthermore, the demand for these four
‘supermagnet’ rare earths is predicted to grow faster than for other rare earths.
Globally, most rare earths are sourced from hard-rock mines. These typically require large, costly
processing plants and a significant lead time to reach production.
A less common source of rare earths is ionic adsorption clay (IAC) deposits, which have
historically been mined only in southern China. A major advantage of IAC deposits is that the
rare earths can be extracted from the clay via a low-cost desorption process. Secondly, they
often exist at shallow depth. These advantages enable a project to be developed rapidly and at
lower cost. Furthermore, IAC deposits typically contain a higher proportion of heavy rare earths
compared to hard rock deposits, and low concentrations of radioactive elements such as
uranium and thorium.
ABx is the first company to discover rare earths in Tasmania (Figure 1) and has reported a JORCcompliant mineral resource of 27 million tonnes at its Deep Leads / Rubble Mound project.
ABx engaged Australian Nuclear Science and Technology Organisation (ANSTO) to conduct
desorption tests, which found the highest extractions under relatively neutral conditions
reported from any clay-hosted project in Australia5,6. This proves the mineralisation to be of the
IAC variety. Low-cost processing is crucial for clay-hosted rare earth deposits, and industry
processing experts indicate that low-cost processing can only be achieved using desorption with
low acid consumption. Additionally, the rare earths in the Deep Leads / Rubble Mound resource
have the highest proportion of DyTb (4.3% of TREO) of any clay-hosted rare earths resource in
Australia. These factors put ABx at the forefront for customers and countries seeking to diversify
rare earths supply.
Following these excellent discovery and processing results, ABx has built significant momentum
and will continue to conduct further exploration, which will include targeting new areas within
its tenements that have geological features considered prospective for additional rare earths.
The ABx strategy is to produce a mixed rare earth carbonate that can be sold to existing
refineries to increase their production. The ABx carbonate will be high in heavy rare earths and
low in radioactive elements, which is expected to be attractive to many prospective customers.
Market discussions with several potential customers endorse this strategy.
5
6
ASX announcement 31 May 2022
ASX announcement 2 February 2023
Quarterly report to 30 June 2023
page 4
ABxGroup
New
Leads
Rubble Mound
Wind Break
Portrush
100 km2 target
Westbury
New
New
ABx REE discoveries & leases
Figure 1: ABx leases in the 52 km wide REE province, including the new exploration licence application covering
the area between Deep Leads and the Wind Break rare earths discovery located 16km ENE of Deep Leads.
ABxGroup
Quarterly report to 30 June 2023
page 5
Alcore: completed preliminary engineering design of a pilot plant
•
Alcore received7 the $2.7 million second instalment of the previously announced $7.5
million8 in grant funding under the Federal Government’s Modern Manufacturing
Initiative (MMI)9. This means that 75% of the grant funding has been received. Alcore will
match the grant funding dollar-for-dollar for the project. The pilot plant is being designed
to recover fluorine from ‘excess bath’, an aluminium smelter waste product, to produce
hydrogen fluoride.
•
For the pilot plant, the preliminary engineering design was completed.10 The detailed
engineering designs of all major equipment are very close to being finalised, with orders
planned to be placed by September 2023. Alcore staff are working on the site
preparation, including with contractors for civil and electric infrastructure work, and with
local authorities for all necessary permits and approvals. The facility will occupy the entire
the back section of the Alcore Technology Centre in Berkeley Vale, NSW. It is planned that
pilot plant commissioning will commence by March 2024.
•
Development work in 2022 and early 2023 strongly indicated that the existing laboratory
equipment provided insufficient process mixing to achieve a very high yield of fluorine
from the aluminium smelter waste. Yield is important, to maximise the amount of
hydrogen fluoride and aluminium fluoride produced and minimise the amount of
fluorine that reports to the metal sulfate co-products. In late March, a laboratory bath
reactor MkII employing state-of-the-art technology to enhance process mixing was
ordered from a specialised international supplier. Manufacture and factory testing is
complete and it will be shipped shortly, with delivery expected in August.
•
Further experiments were conducted using the existing laboratory equipment. The
results support the conclusion that process mixing is a limiting factor, giving further
confidence that the laboratory bath reactor MkII will achieve higher fluorine yield. This
will be very significant because it will:
7
•
Give further confidence that the pilot plant will perform as designed
•
Enable further development work to be conducted on processing of the metal sulfate
co-products
ASX announcement 28 June 2023
ASX announcement 29 April 2022. Note: Actual grant is $7,582,966
9
The grant provides for up to 50% of eligible project expenditure. See https://business.gov.au/grants-andprograms/mmi-manufacturing-translation-stream-recycling-and-clean-energy-round-2
10
ASX announcement 21 June 2023
8
ABxGroup
Quarterly report to 30 June 2023
page 6
Alcore Strategy
Hydrogen fluoride is an essential chemical for the production of fluorocarbons and
aluminium fluoride. Aluminium fluoride is an essential chemical for aluminium metal
production.
Hydrogen fluoride is mainly produced from fluorspar, which is obtained from the mineral
fluorite. Fluorspar is relatively high cost and has been identified as a critical material by the
USA, Europe, Japan and Canada.
Australia does not mine any fluorite, or produce any fluorspar, hydrogen fluoride or
aluminium fluoride, and so must import all its requirements. The Australian demand for
hydrogen fluoride is small, and it is imported at high cost. Conversely, Australia is a
significant producer of aluminium and so its demand for aluminium fluoride is high.
Australia is the largest producer of primary aluminium metal without its own domestic
aluminium fluoride production, so Australian aluminium smelters rely entirely on imported
aluminium fluoride. This is typically more than 80% from China, but this proportion was only
40% in 2021 when China production was lower, illustrating the supply risks (Figure 6).
Aluminium fluoride prices have been above US$1,300/t for the last 20 months (Figure 7).
Most modern aluminium smelters produce excess bath, for which the only meaningful
market is new smelters, which require bath to commence operations. Aluminium industry
forecasts suggest that the global bath market will increasingly be in surplus, because far
fewer new smelters are being constructed. All of the major global aluminium producers are
eager for alternative applications for excess bath, to avoid the unpalatable options of on-site
storage or landfill.
Alcore has developed a world-first process to recover hydrogen fluoride from aluminium
smelter bath. This is combined with aluminium hydroxide to produce aluminium fluoride.
Alcore is also investigating the use of dross (another aluminium smelter waste) and bauxite
as alternatives to aluminium hydroxide as the source of aluminium. The use of dross or
bauxite would further lower the production cost.
Alcore intends to construct commercial hydrogen fluoride and aluminium fluoride plants in
Bell Bay, Tasmania. The aluminium source for the initial aluminium fluoride production is
likely to be aluminium hydroxide, as this is lower risk and allows a faster path to production.
Subsequent production may use aluminium from dross or bauxite to further improve the
financial and environmental outcomes.
The initial plant is proposed to transform 1,600 tonnes per year of aluminium smelter bath
into hydrogen fluoride and other industrial chemicals. A proportion of the hydrogen fluoride
will be further processed to aluminium fluoride. The relative amounts of hydrogen fluoride
and aluminium fluoride produced can be optimised to suit market demand. Alcore’s longer
term plan is to expand the plant by 15 times, which will process all of Australia’s aluminium
smelter bath and supply more than 80% of Australia’s aluminium fluoride requirements.
Quarterly report to 30 June 2023
page 7
ABxGroup
AlF3 imports from China (tonnes)
25,000
20,000
15,000
10,000
5,000
0
2016
2017
2018
2019
2020
2021
2022
2023 YTD
June
Figure 6: Imports of aluminium fluoride from China into Australia (source: China Customs Statistics)
$2,000
$1,800
AlF3 price FOB China (US$/t)
$1,600
$1,400
$1,200
$1,000
$800
$600
$400
$200
$0
Dec-11 Dec-12 Dec-13 Dec-14 Dec-15 Dec-16 Dec-17 Dec-18 Dec-19 Dec-20 Dec-21 Dec-22 Dec-23
Figure 7: Aluminium fluoride monthly prices FOB China (source: China Customs Statistics)
ABxGroup
Quarterly report to 30 June 2023
page 8
Bauxite Operations
Sunrise Bauxite Project: Binjour, Queensland
•
An internal review of the Binjour mine plan has progressed, with selection of the
preferred mining schedule and infrastructure layout.
•
Our application to modify the Bundaberg port site boundary is being assessed by the
Department of Resources.
•
The next stage of environmental studies at both the mine and port locations are
scheduled for Q4, 2023.
DL130 Bauxite Project: Tasmania
•
1,000 tonnes of bauxite were excavated from a trial pit and provided to two customers.
The customer trial for fertiliser production was successful and future orders are
anticipated. The material for trial for cement production is enroute to the customer. In
parallel, a multi-year supply agreement for cement-grade bauxite is being negotiated
with this customer.
•
The Environmental Effects Report (EER) was reviewed by the EPA. Minor amendments
were made to the EER and it was resubmitted for evaluation. The EER forms a significant
part of the mine lease application
•
Discussions were held with all landowners affected by the mine lease application. No
major issues were identified, but finalisation of landowner agreements is taking longer
than anticipated. Commencement of mining is now expected in Q4 2023 / Q1 2024.
Bauxite Strategy
The ABx strategy is to selectively produce metallurgical grade, cement grade and fertiliser
grade bauxite, with a focus on profitability.
The largest project is Binjour, with a JORC compliant resource of 37 million tonnes,
supporting 20-25 years production. In February 2022, ABx entered a JV with Alumin for the
development of the Sunrise Bauxite Project, comprising a bauxite mine at Binjour plateau
and port operations at Bundaberg in Queensland11. Alumin is an Australian special purpose
vehicle company associated with our strategic marketing partner, Rawmin India, having
extensive experience in funding long term sustainable investments in projects involving
mining and bulk-shipping of metallurgical grade bauxite to end users around the world.
It is anticipated that the mine at Binjour will export 500,000 tonnes per year of metallurgical
grade bauxite in its first year of production, then scale up to full operational capacity of 1.5
million tonnes per year. ABx plans to begin exporting product in H1 2025.
11
ASX Announcement 28 February 2022
ABxGroup
Quarterly report to 30 June 2023
page 9
In Tasmania, ABx has a JORC compliant resource of 13.7 million tonnes across three deposits.
ABx plans to recommence bauxite mining in Tasmania by Q1 2024, at the DL130 Bauxite
Project. The primary products are likely to be cement grade and fertiliser grade bauxite.
An updated company presentation has been placed on the ABx website
www.abxgroup.com.au.
This announcement is approved for release by the board of directors.
For further information please contact:
Dr Mark Cooksey
Managing Director and CEO
ABx Group
Mobile: +61 447 201 536
Email: mcooksey@abxgroup.com.au
Website: abxgroup.com.au
ABxGroup
Quarterly report to 30 June 2023
page 10
Qualifying statements
General: The information in this report that relate to Exploration Information and Mineral Resources are based on
information compiled by Jacob Rebek and Ian Levy who are members of The Australasian Institute of Mining and
Metallurgy and the Australian Institute of Geoscientists. Mr Rebek and Mr Levy are qualified geologists and Mr Levy is
a director of ABx Group Limited.
Mainland: The information relating to Mineral Resources on the Mainland was prepared and first disclosed under the
JORC Code 2004. It has not been updated since to comply with the JORC Code 2012 on the basis that the information
has not materially changed since it was last reported. Mr Rebek and Mr Levy have sufficient experience, which is relevant
to the style of mineralisation and type of deposit under consideration and to the activity, which they are undertaking to
qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of exploration Results,
Mineral Resources and Ore Reserves. Mr Rebek and Mr Levy have consented in writing to the inclusion in this report of
the Exploration Information in the form and context in which it appears.
Tasmania: The information relating to Exploration Information and Mineral Resources in Tasmania has been prepared
or updated under the JORC Code 2012. Mr Rebek and Mr Levy have sufficient experience, which is relevant to the style
of mineralisation and type of deposit under consideration and to the activity, which they are undertaking to qualify as
a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves. Mr Rebek and Mr Levy have consented in writing to the inclusion in this report
of the Exploration Information in the form and context in which it appears.
The information relating to the latest REE Resources update is extracted from the report entitled “ABX REE resource
increases to 27m tonnes and new discoveries” dated 18 July 2023 and is available to view on
https://www.abxgroup.com.au/site/investor-information/asx-announcements (2023).
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the company’s market announcements and, in the case of estimates of Mineral Resources or Ore Reserves,
that all material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed.
The Company also confirms that the form and context in which the Competent Person’s findings are presented have
not been materially modified from the original market announcements.
Disclaimer Regarding Forward Looking Statements
This ASX announcement (Announcement) contains various forward-looking statements. All statements other than
statements of historical fact are forward-looking statements. Forward-looking statements are inherently subject to
uncertainties in that they may be affected by a variety of known and unknown risks, variables and factors which could
cause actual values or results, performance or achievements to differ materially from the expectations described in
such forward-looking statements.
ABx does not give any assurance that the anticipated results, performance or achievements expressed or implied in
those forward-looking statements will be achieved.
Patent
Refined Ore Industries Ltd (ROIL) was the owner of the CORE process technology via ROIL’s intellectual property
company, Berkeley Process Technologies Pty. Ltd which issued a global exclusive licence for the aluminium-related
portion of the CORE process technology to ABx in November 2017 and ABx has issued a global exclusive sub-licence
to ALCORE when ALCORE was incorporated on 1 July 2018.
After a company restructure and expansion of the patent definition to cover isolation and extraction of mineral
compounds, metals, metalloids, alloys and elements from waste streams, mineral ores, recyclable commodities,
industrial by-products and mixed substances, the holding company is now named Core Refining Limited (CRL) and the
intellectual property company is Core Intelligence Australia Pty Ltd (CIAL) which holds the Patent Application No.
2019904311 and the global exclusive licences to ABx and ALCORE continue in force.
CRL’s CORE process technology involves the refining of a wide range of ore types using a combination of fluorine acids
and related thermal energy process steps. The technology that is licensed to ABx and ALCORE by CRL is part of CRL’s
broader Core technology.
Quarterly report to 30 June 2023
page 11
ABxGroup
Table 1: Tenement information required under LR 5.3.3
Tenement No.
Location
New South Wales
EL 6997
Inverell
EL 7357
Taralga replacement pending
EL 8600
Penrose Quarry expired
Queensland
MLA 100277
Sunrise ML application
EPM 27787
Binjour
ML 80126
Toondoon ML
Tasmania
EL 7/2010
EL 9/2010
EL 18/2014
EL 10/2021
Conara
Deloraine
Prosser’s Road
Rubble Mound
Notes:
No tenements were relinquished or granted. Old tenement EL
7357 is being replaced with a new tenement. Old tenement EL
8600 is expired and a replacement is being designed.
All tenements are in good standing, 100% owned and not
subject to any third-party royalties nor are they encumbered in
any way.
Information required under Listing Rule 5.3.1: Exploration expenditure reported during the quarter related to
the REE program development ($662,000), research conducted by Alcore with respect to its reported advancements
($356,000).
Information required under Listing Rule 5.3.2: No mining production was conducted during the quarter.
Information required under Listing Rule 5.3.5: $133,000 directors fees were paid to Paul Lennon, Ian Levy,
Kenneth Boundy and Mark Cooksey for their services rendered.
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
ABx Group Limited
ABN
Quarter ended (“current quarter”)
14 139 494 885
30 June 2023
Consolidated statement of cash flows
Current quarter
$A’000
Year to date ( 6
months)
$A’000
53
53
(a) exploration & evaluation
(662)
(1,328)
(b) development
(356)
(646)
(c) production
-
-
(d) staff costs
(94)
(232)
(e) administration and corporate costs
(162)
(307)
-
-
29
53
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (Government RD/Innovation Grant)
2,606
6,383
1.9
Net cash from / (used in) operating
activities
1,414
3,976
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
(114)
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
-
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date ( 6
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
-
(114)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (Net proceed from issuing of equity
securities – controlled entity)
-
-
3.10
Net cash from / (used in) financing
activities
-
-
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
4,505
2,057
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
1,414
3,976
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
-
(114)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
-
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date ( 6
months)
$A’000
-
-
5,919
5,919
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
364
51
5.2
Call deposits
-
1,505
5.3
Bank overdrafts
-
-
5.4
Other (Held in trust)
5,555
2,949
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
5,919
4,505
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
133
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
6.3
Include below any explanation necessary to under the transactions included in items 6.1
and 6.2
Current quarter
$A'000
$133,697 director fee were paid to Paul Lennon, Kenneth Boundy and
Mark Cooksey for their services rendered.
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
1,414
8.4
Cash and cash equivalents at quarter end (item 4.6)
5,919
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
-
$A’000
1,414
-
5,919
N/A
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer:
N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer:
N/A
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer:
N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordanc
Share your feedback