Milestone for rare earth project development
Engage with this announcement on our interactive Investor Hub
New areas of ionic rare earth elements with high extraction discovered
The Deep Leads project development stage will now commence, focused on
starting production within months, rather than years, from project approval
ABx deposits are enriched in the highest value, most important rare earths
ABx Group Limited (ASX: ABX) (ABx or the Company) is excited to announce that it has
discovered several new areas of ionic adsorption clay rare earths with high extraction at its
Deep Leads project in northern Tasmania. Ionic rare earths are low cost to extract, so these
results significantly increase the commercial potential of the Deep Leads project.
As a result of identifying new areas with high extraction, the project development stage has
now commenced and will focus on a project that can commence production within months,
not years, from project approval.
Project Setting
Deep Leads project is located 40km by highway west of Launceston in a pine plantation with
a granted Mining Lease for quarrying ABx’s DL130 bauxite deposit, nearby rail and
infrastructure with low-cost grid hydropower and water (Figure 2).
ASX Announcement
10 March 2026
ASX: ABX
Figure 1: New areas with high rare earth
extraction at Deep Leads (red circles)*
Details in Table 2.
These new areas were identified by recent
leach tests of drill samples conducted at
ABx’s research laboratory in Launceston,
Tasmania.
ABx’s leach results are similar to those done
on the same samples by the Australian
Nuclear Science and Technology
Organisation (ANSTO) using the standard
low-cost process for ionic rare earths. For
example, leach tests by ANSTO on a bulk
sample achieved extraction exceeding 80%,
which was 10% higher than ABx’s results on
the same sample (see ASX announcement 23
January 2026)
* Extractions quoted are extractions of total rare
earths & yttrium minus cerium
ASX Announcement 10 March 2026
page 2
Figure 2: Deep Leads rare earths project, ABx tenements and rare earth discoveries in northern Tasmania
Dr Mark Cooksey, Managing Director and CEO of ABx Group, commented:
“My jaw dropped when I saw these leach test results. Our in-house assessment and knowledge
gained from external experts indicate that ionic deposits are likely to be substantially lower on the
cost curve than otherwise equivalent clay-hosted deposits. Ionic deposits also appear to be very
rare, especially in tier 1, dependable jurisdictions such as Australia.
“These results strongly suggest that we have a substantial extent of ionic clay rare earths in our
Deep Leads deposit, which will enhance our ability to supply significant volumes of high-quality
MREC into western supply chains. We have progressed to the project development stage.”
Rare Earths Project Development Strategy
ABx aims to establish Australia’s first ionic rare earths project producing a premium MREC
that is sold to rare earth separation plants. ABx has executed a Memorandum of
Understanding with Ucore Rare Metals Inc. (TSXV: UCU) (OTCQX: UURAF),1
which is
developing rare-earth processing facilities in North America. ABx is also in discussions with
other potential offtake partners, including the provision of MREC samples to multiple
parties.2
Rare earth permanent magnets account for over 90% of the value of the rare earths market,
and are used in electric vehicles, wind turbines, smartphones and military applications. The
permanent magnet rare earths are neodymium (Nd), praseodymium (Pr), dysprosium (Dy)
and terbium (Tb), with Dy and Tb being the highest priced and in shortest supply.
1
ASX Announcement, 4 September 2024
2
ASX Announcement, 2 March 2026
ASX Announcement 10 March 2026
page 3
Rare earth market developments
Table 1: Rare earth metal oxide prices
The basket price of ABx’s heavy rare earth element
enriched MREC product has risen by 34% in the last
3 months. The value of ABx’s MREC product is
underpinned by its exceptional Dy+Tb content
which have current market prices of US$215,900
and US$908,500 per tonne respectively which are the
most valuable rare earths.
The attractiveness of ABx’s MREC is further
reinforced by the strengthening of prices of Gd, Ho,
Er, and Y.
Furthermore, Benchmark Minerals prices for Dy
and Tb oxides in Europe are currently more than
four times Shanghai Metal Market prices.3
ABx’s Ionic Clay-Hosted Deposits
Most rare earths are sourced from hard-rock mineral deposits, typically requiring costly
mining and processing plants with significant lead times to reach production.
An alternative source of rare earths is the ABx type of ionic clay-hosted deposits which can
be leached at low-cost, using a simple benign three-step leaching process that has been used
commercially for many decades, mainly in southern China and SE Asia.
This is in contrast to non-ionic clay-hosted rare earth deposits, which do not leach using the
standard three-step process and require additional process steps to extract the rare earths.
To our knowledge, there has never been commercial production from a non-ionic clay-
hosted rare earth deposit and, consequently, ABx’s project development strategy is to focus
on developing its ionic rare earth resources.
Mineral Resource
ABx has reported a JORC-compliant mineral resource of 89 million tonnes at its Deep Leads
- Rubble Mound and Wind Break deposits,4
containing 36 ppm Dy+Tb which is 4.3% of total
rare earth oxides (TREO), the highest proportion of any clay-hosted rare earth deposit in
Australia and among the highest globally.5
ABx also has a portfolio of several other rare earth deposits in its large exploration
tenements in northern Tasmania (Figure 2).
3
www.benchmarkminerals.com, 5 March 2026
4
41 Mt inferred, 42 Mt indicated and 6 Mt measured
5
ASX Announcement, 2 May 2024
Shanghai Metals Market 06/03/2026
REE (oxide)
USD$/tonne
at 6/3/26
% change since
26/11/25
La $740 16%
Ce $1,990 21%
Pr $133,100 58%
Nd $133,500 59%
Sm $2,380 2%
Eu $24,900 -1%
Gd $36,300 60%
Tb $908,500 -2%
Dy $215,900 4%
Ho $80,300 15%
Er $58,200 20%
Yb $14,400 2%
Lu $743,800 2%
Y $10,500 24%
ABx MREC Total $59,700 34%
Main REE metals in ABx MREC
Other heavy REE in ABx MREC
ASX Announcement 10 March 2026
page 4
MREC Produced from Bulk Leach Tests
Bulk leaching tests conducted by Australian Nuclear Science and Technology Organisation
(ANSTO) using the standard low cost reagents for ionic clay hosted ores achieved the highest
ionic extractions reported from any clay-hosted resource in Australia. The maiden MREC
produced from these bulk tests has the highest value of contained rare earths, including
4.0% Dy and 0.7% Tb as a percentage of total rare earths, which is more than twice that of
any other peer MREC. 6
In-house Leach Tests
At the early stages of its rare earth project, ABx identified a significant prevalence of ionic
rare earths within its deposits at Deep Leads and Rubble Mound, through leach testing
conducted by ANSTO. However, the true extent of ionic rare earths was still unclear
In 2023-24, ABx developed its own capability to conduct in-house leach testing that produced
similar results to ANSTOs were obtained. This leach testwork is conducted in ABx’s research
laboratory in Launceston and is supervised by former CSIRO chemical engineer, Dr Daniel
Jewell.
Since 2025, ABx has been progressively conducting leach testing on its drill samples across
its deposits, with prioritisation based on grade (TREO-CeO2), the likelihood of being ionic,
other factors related to mining, metallurgical and rehabilitation project development
strategies.
The recent in-house leach testing reported herein has identified three samples with a high
ionic component that are more than 2 km distant from the nearest sample that was
previously known to have high extraction (Figure 1). Full leach test results are contained in
Table 2.
Implications
These new results vastly increase the likely extent of ionic rare earths in the Deep Leads
deposit. This is crucial because it can enable a project with a higher annual production rate
and longer mine life, and it also indicates the possibility of discovering new zones even
superior to the existing known ionic areas.
Next Steps
ABx will continue to conduct in-house leach testing on drill samples, to better define the
extent of ionic rare earths in its deposits.
The ABx strategy is to commence commercial production of a mixed rare earth carbonate
(MREC) as soon as possible, and these leach tests results are a valuable input to the
engineering studies underway with external experts.
6
ASX Announcement, 2 December 2025
ASX Announcement 10 March 2026
page 5
Table 2: Extraction results
TREY = total rare earths (TRE) + yttrium (Y)
TREY-Ce = TREY minus cerium (Ce)
Test conditions
ABx research lab, Launceston, Tasmania
January and February 2026
Leach volume 80ml, solids dry weight 20 g.
Room temperature. Stirred 15 minutes
Ammonium sulfate 4%. pH 4.0
This announcement is approved for release by the board of ABx Group Limited.
Go to the ABx Investor Hub to watch a video of this announcement and ask any questions of
management.
For further information please contact:
Dr Mark Cooksey
MD & CEO
ABx Group
+61 447 201 536
mcooksey@abxgroup.com.au
www.abxgroup.com.au
Media
Chapter One Advisors
David Tasker / Alex Baker
+61 433 112 936 / +61 432 801 745
dtasker@chapteroneadvisors.com.au /
abaker@chapteroneadvisors.com.au
About ABx Group Limited
ABx Group Limited (ABx) is a uniquely positioned Australian company delivering materials
for a cleaner and safer future.
The three priority projects are:
• Heavy rare earths: Supplying light and heavy rare earths from Tasmania into
Western supply chains
o Maiden mixed rare earth carbonate produced
o Processing Options Analysis conducted in partnership with external experts
• Clean fluorine chemical production: Producing industrial chemicals from
aluminium smelter by-product (ALCORE)
o Continuous pilot plant under construction in Bell Bay, Tasmania
• Near-term bauxite production: Mining bauxite resources for the aluminium,
cement and fertiliser industries
o Agreements executed with Good Importing International for bauxite projects
in Queensland and New South Wales, and $2.7 million initial payment has
been received
o Approvals well advanced for DL130 bauxite project in northern Tasmania
ABx endorses best practices on agricultural land and strives to leave land and environment
better than we find it. We only operate where welcomed.
Hole
From To Nth East RL TREY
m m m m m ppm %
RM374 4 5 5413600 478930 229 1,583 1,331 81.2%
RM325 6 7 5411805 481423 243 821 627 78.5%
RM452 8 9 5411080 478025 324 904 722 68.0%
DL605 5 6 5410197 478484 303 922 371 71.8%
RM264 5 6 5409412 481163 226 783 644 70.1%
RM175 7 8 5406210 480826 216 4,634 2,564 25.0%
Depth Extraction
rate
TREY -
Ce ppm
Location WGS 84 56S Grade
ASX Announcement 10 March 2026
page 6
Disclaimer Regarding Forward Looking Statements
This ASX announcement (Announcement) contains various forward-looking statements. All
statements other than statements of historical fact are forward-looking statements.
Forward-looking statements are inherently subject to uncertainties in that they may be
affected by a variety of known and unknown risks, variables and factors which could cause
actual values or results, performance, or achievements to differ materially from the
expectations described in such forward-looking statements.
ABx does not give any assurance that the anticipated results, performance, or achievements
expressed or implied in those forward-looking statements will be achieved.
Competent Persons Statement
The information in this report that relate to Exploration Information and Mineral Resources are
based on information compiled by Ian Levy who is a member of The Australasian Institute of
Mining and Metallurgy and the Australian Institute of Geoscientists. Mr Levy is a qualified
geologist and a director of ABx Group Limited.
Mr Levy has sufficient experience, which is relevant to the style of mineralisation and type of
deposit under consideration and to the activity, which he is undertaking to qualify as a Competent
Personas definedinthe2012EditionoftheAustralasianCodeforReportingofexplorationResults,
Mineral Resources and Ore Reserves. Mr Levy has consented in writing to the inclusion in this
report of the Exploration Information in the form and context in which it appears.
Table 3 - Summary of sampling information referred to above, in accordance with LR 5.8.1
Geology and geological interpretation REE mineralisation occurs in clay layers that overlie a Jurassic age dolerite
basement in a district with some residual weathered Tertiary age alkali
basalt. Paleochannels host the rare earth element mineralisation.
Sampling and sub-sampling techniques Drill samples collected at 1 metre intervals are subsampled by quartering
twice and returning the rejected half into the drill sample bag. An assay
sample anda duplicateassaysamplearecollectedbycuttingacross the full
section of the quartered sample and photographed. Assay results from
resampling and bulk sampling by excavator correspond satisfactorily.
For leach tests, the duplicate sample is dried and two 30-50g samples
collected by riffle splitting, one for the head assay and the duplicate for
leaching.Postleachingandfiltering,theleachedresidueisdried,weighedand
sentforassay.Inaddition,theleachpregnantliquorsolutionisasentforassay
byadifferentALSlab. Thetwo methodsproducesimilar extraction rates.
Drilling techniques RC aircore and push-tube coring used. Auger drilling is also used in
areas of shallow formation and wet conditions.
Criteria used for classification, including
drill and data spacing and distribution.
Not applicable for this report.
Sample analytical method Assay samples are analysed by NATA-approved induction coupled plasma
analyticalmethodsforrareearthelementsatALSlabsinBrisbane(methodME-
MS81) and LabWest inPerth (method MMA04). Interlab comparisons proved
satisfactory.Pregnantliquorsolutions areassayedby ALS in Adelaide (method
ME-MS02forREEandmethodME-ICP02forwhole-rockanalysis
Estimation methodology Notapplicable forthis report.
Cut-off grade Not applicable for this report.
Mining and metallurgical methods and
parameters, and other modifying factors
Not applicable for this report. The land is freehold pine plantations.
ASX Announcement 10 March 2026
page 7
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling
• Include reference to measures taken to ensure sample
representivity
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• Industry standard work:
• Resampling stored drill sample for leach test
• Samples taken at 1 metre intervals.
• Subsampling the metre samples done as per
ISO bauxite sampling processes by cone and
quartering
Drilling
techniques
• Drill type • Reverse circulation aircore
Drill sample
recovery
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Variable weights at 1 metre samples but
consistent weights over 3 metre
Logging • Whether samples have been geologically and geotechnically
logged to an appropriate level for metallurgical studies.
• Whether sampling is qualitative or quantitative.
• Totallength&percentageoftherelevantintersectionslogged.
• Logged, sampled, photographed & stored to
ISO standards.
Sub-
sampling
techniques
andsample
preparation
• If core, whether cut or sawn, quarter, half or all core.
• If non-core, sample method, whether sampled wet or dry.
• Nature, quality & appropriateness of the sample preparation.
• Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
• Measures taken to ensure that the sampling is representative
of the in situ material collected, including for instance results
for field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the
material being sampled.
• Drill samples subsampled by cone and
quartering twice followed by collecting assay
sample and duplicate assay sample by
cutting through the quartered subample
• Samples for leach testing are collected from
the second assay subsample and
subsampled by drying and riffle splitting
• Some lab reject samples are used for leach
tests. Correspondence of leach extraction
rates are good.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
• Geophysical tools, spectrometers, handheld XRF instruments,
etc, the parameters used in determining the analysis
• Nature of quality control procedures adopted.
• Assaying done by NATA-registered ALS
laboratories, Brisbane and Adelaide with
QA/QC protocols and results on its website
• ABx leach tests have been done at the ABx
research laboratory in Launceston since
2023 under supervision of ex-CSIRO
chemical engineer Dr Daniel Jewell.
• Correspondence with leach test results done
on the same samples by ANSTO has been
excellent due to simplicity of both
mineralisation and the technique
Verification
of sampling
and
assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Duplicate subsamples re-assayed the same.
• Metal assays from ALS converted to oxides
as per industry standards for reporting
Location of
data points
• Accuracy & quality of surveys used to locate drill holes & pits.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Location by GPS
Data
spacing and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient.
• Whether sample compositing has been applied.
• Drill sampling at 1m intervals considered
appropriate and sufficient
Orientationof
datainrelation
togeological
structure
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
• Does the drilling orientation introduce a sampling bias
• Vertical drillholes and 1 metre sampling is
appropriate for the horizontal layers of REE
mineralisation 3 to 10 metres thick
Sample
security
• The measures taken to ensure sample security. • Chain of custody protocols were applied to
secure the bags of samples.
Audits or
reviews
• The results of any audits or reviews of sampling techniques
and data.
• Duplicate subsamples re-assayed the same
• Interlab comparisons satisfactory
ASX Announcement 10 March 2026
page 8
Section 2 Reporting of Exploration Results (Criteria listed in preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement
and land
tenure status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
• Security of tenure and impediments to obtaining a licence to operate.
• EL7/2010 and EL10/2021 are
100% owned, unencumbered an
in good standing.
• A Mining Lease ML2142P/M
granted to ABx covers part of
EL7/2010 for quarrying bauxite
Explorationby
otherparties
• Acknowledgment and appraisal of exploration by other parties. • ABx sole discoverer and first to
explore this area.
Geology • Deposit type, geological setting and style of mineralisation. • REE mineralisation occurs in clay
layers that overlie a Jurassic age
dolerite basement in a district
with some residual weathered
Tertiary age alkali basalt.
Drill hole
Information
• Summary of information for understanding exploration results including a
tabulation of the following information for all material drill holes:
o easting and northing of thedrillhole collar
o elevation or RL (Reduced Level –elevation above sea level in metres)
o dip and azimuth of thehole
o down hole length and interception depth
o hole length.
• If exclusion of this information is justified, the Competent Person should
clearly explain why this is the case.
• Drill locations measured by
GPS and are shown in Table 2
• WGS 84 56S grid
• RLs by LiDAR
• All holes vertical
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (eg cutting of high grades) and cut-off
grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade results
and longer lengths of low grade results, the procedure used for such
aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values should be
clearly stated.
• No aggregation or any cutting
of assays done
• Metal assays from ALS
converted to oxides as per
industry standards for
reporting
Relationship
between
mineralisation
widths &
intercept
lengths
• These relationships are particularly important.
• If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.
• If it is not known and only the down hole lengths are reported, there should be
a clear statement to this effect (eg ‘down hole length, true width not known’).
• Vertical drilling and sampling is
appropriate for the horizontal
layers of REE mineralisation
Diagrams • Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These should
include, but not be limited to a plan view of drill hole collar locations and
appropriate sectional views.
• See report
Balanced
reporting
• Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should
be practiced to avoid misleading reporting of Exploration Results.
• All applicable data to date is
reported in this report
Other
substantive
exploration
data
• Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious or
contaminating substances.
• All applicable data to date is
reported in this report
Further
work
• The nature and scale of planned further work (eg tests for lateral extensions
or depth extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions, including the
main geological interpretations and future drilling areas, provided this
information is not commercially sensitive.
• ANSTO labs conducted bulk
column leaching on a 100kg
bulk sample to produce a
mixed rare earth carbonate
(MREC)