CEO Presentation at Fluorine Forum
Released
Released
Announcement PDF
ASX:ABX
FLUORINE FORUM 2025
Hotel Grand Dino, Baveno, Italy
23 October 2025
Clean fluorine chemical production:
producing industrial chemicals from
aluminium smelter by-product
ASX:ABX
DISCLAIMER
This presentation has been prepared by ABx Group Limited ACN 139 494 885 (“ABx” or the “Company”). It should not be considered as an offer or invitation to subscribe for or
purchase any securities in the Company or as an inducement to make an offer or invitation with respect to those securities. No agreement to subscribe for
securities in the Company will be entered into on the basis of this presentation.
This presentation contains forecasts and forward looking information. Such forecasts and information are not a guarantee of future performance, involving
unknown risks and uncertainties. Actual results and developments will almost certainly differ materially from those expressed or implied. ABx has not audited or
investigated the accuracy or completeness of the information, statements and opinions contained in this presentation. Accordingly, to the maximum extent
permitted by applicable laws, ABx makes no representation and can give no assurance, guarantee or warranty, express or other implied, as to, and take no
responsibility and assume no liability for, the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission, from any information,
statement or opinion contained in this presentation.
You should not act or refrain from acting in reliance on this presentation material. This overview of ABx does not purport to be all inclusive or to contain all
information which its recipients may require in order to make an informed assessment of the Company’s prospects. You should conduct your own investigation
and perform your own analysis in order to make an informed assessment of the company’s prospects. You should also conduct your own investigation and
perform your own analysis in order to satisfy yourself as to the accuracy and completeness of the information, statements and opinions contained in this
presentation and making any investment decision.
2
3
ASX:ABX
Heavy Rare Earths
Supplying light and heavy rare earths from
Tasmania into Western supply chains
Clean fluorine chemical production
Producing industrial chemicals from
aluminium smelter by-product
Near-term bauxite production
Mining bauxite resources for the aluminium,
cement and fertiliser industries
Delivering materials
for a cleaner future
3
ASX:ABX
4
INVESTMENT PROPOSITION
Low-cost hydrogen
fluoride production using
aluminium smelter bath
by-product
Will enable hydrogen
fluoride production in
Australia, to reduce 100%
reliance on imports
Team
Experienced and capable
Strongly increasing demand
for fluorine
Batteries
Supply shortage
No hydrogen fluoride produced in
Australia. Limited global fluorspar
resources
New fluorine source
available at low cost
Aluminium smelter bath waste
Chemical process is low risk
Adaptation of existing
commercial process
Pathway to production
First mover globally: at pilot
plant stage
ASX:ABX
5
HIGHLY EXPERIENCED TEAM
DR MARK COOKSEY JOYCELYN MORTON IAN LEVY XIAO LIANG
Managing Director Non-Executive Chair Non-Executive Director Principal Engineer
More than 20 years with Rio Tinto
and CSIRO
Significant experience in developing
and commercialising new
processes in minerals and metals
industry
PhD in Chemical & Materials
Engineering
Over 30 years’ experience as an
executive and director with
Australian and international listed
companies, including Argo
Investments, ASC and Snowy Hydro
Chair of the Audit, Risk and
Compliance Committee for multiple
boards
Fellow and Life Member of CPA
Australia, and former National
President
30 years of senior management
and geological experience with
multiple commodities, including at
WMC
Previously CEO of Allegiance Mining
and Director of Gloucester Coal
Member of JORC for 11 years (4
years as Vice Chairman) and
Federal President, Australian
Institute of Geoscientists
Over 15 years of expertise in
chemical process innovation and
intensification, including conceptual
design, fundamental research, and
process scale-up.
With extensive leadership
experience, he drives cutting-edge
technology development and
oversees successful planning and
implementation of new
technologies at ALCORE
ASX:ABX
6
ALUMINIUM SMELTER BATH
Mechanism of surplus bath formation
Alumina contains sodium oxide (Na2O) impurity
Na2O reacts with aluminium fluoride (AlF3) in the bath to produce sodium fluoride (NaF) and alumina (Al2O3)
AlF3 additions required to maintain AlF3 content
Production of NaF and addition of AlF3 means that bath (Na3AlF6) is produced
Main reaction: 2Al2O3 + 3C 4Al + 3CO2
Side reactions: 3Na2O + 2AlF3 6NaF + Al2O3
3NaF + AlF3 Na3AlF6
Compound Chemical Formula Content (%)
Cryolite Na3AlF6 (3NaF.AlF3) 88-94
Calcium Fluoride CaF2 4-6
Alumina Al2O3 2-6
Iron Oxide Fe2O3 <0.08
Silica SiO2 <0.08
Carbon C <0.4
Alumina
Bath
Aluminium
metal
CO2
Carbon
Electricity
Used as electrolyte in aluminium smelting, because it dissolves alumina (Al2O3) and is electrically conductive
Typical bath composition
Aluminium smelting
ASX:ABX
7
NEW FLUORINE SOURCE AVAILABLE: ALUMINIUM SMELTER BY-PRODUCT
Aluminium
fluoride (AIF3)
Aluminium
Smelter
Aluminium
smelter bath
(50%)
Waste
refractories
(50%)
Fluorine process flow in aluminium smelters
50% of fluorine leaves aluminium smelting process
as aluminium smelter bath by-product
Source: S.J. Lindsay, Bath generation and management, 10th Australasian Aluminium Smelting Technology Conference, 2011
Increasing global surplus of aluminium smelter bath
New smelter requires bath to commence operations
New smelter short term bath demand long term bath
surplus
ASX:ABX
Exemplary demonstration
of circular economy
8
ALCORE PROCESS
Smelter bath
Aluminium
smelting
Aluminium
fluoride
AIF3
Hydrogen
fluoride
HF
e.g. Metal
treatment, graphite
purification
Fluorocarbons
Metal
sulfates
e.g. Refrigerants,
lubricants
Low technical risk
Process is adaptation of
existing commercial
process to produce
hydrogen fluoride from
fluorspar
ASX:ABX
PROCESS FLOWSHEET
Overall energy consumption: ~1 kWh/kg AlF3
Existing commercial process
9
AlF3 production
Aluminium
fluoride
1.40t
Sulfuric acid
2.45t
HF production
Metal
sulfates
3.20t
Alumina
trihydrate
1.30t
Smelter
bath
1.75t
Hydrogen
fluoride
1.00t
Water
0.90t
ASX:ABX
SIGNIFICANT COST ADVANTAGE OF REPLACING FLUORSPAR WITH SMELTER BATH
ALCORE process produces
same hydrogen fluoride
product using a much lower
cost feed material
Aluminium smelter bath is a
good quality material (low
impurities)
Potential for significant
profit margin
A rare opportunity that is financially, strategically and environmentally attractive
Other raw
materials
Other raw
materials
Utilities, labour,
etc.
Utilities, labour,
etc.
Fluorspar process ALCORE process
Indicative
Opertating
Cost
Fluorspar
Smelter bath
Utilities,
labour, etc
Other raw
materials
Fluorspar
Utilities,
labour, etc
Other raw
materials
Smelter bath
10
11
ASX:ABX
VISION FOR CLEAN FLUORINE CHEMICALS PRODUCTION BUSINESS
Production
Expansion
Construct similar plants overseas
Value-adding
Enable Australian fluorochemical
industry
COMMERCIALISATION GROWTH
Construct plant in Tasmania to
produce hydrogen fluoride and
aluminium fluoride from aluminium
smelter by-product
11
ASX:ABX
12
PATHWAY TO PRODUCTION: PROJECT DEVELOPMENT
First plant planned for Bell Bay, Tasmania
$3.15m Federal Government MMI grant1
2019-22 2023-24 2024-26
Critical process steps
demonstrated2
At facility leased from Rio Tinto at reduced rate4
$1m conditional loan from Tasmanian Government5
Orders placed for all key equipment6
Produce saleable hydrogen fluoride for evaluation by
customers
Determine design and operating parameters for
commercial plant
ALCORE has first mover advantage
Laboratory
300g bath
NSW
$2m (lab)
Batch Pilot
3kg bath
NSW
$50k
Continuous Pilot
20kg/h bath
Tasmania
$3m
Commercial
Stage 1
200kg/h bath
860t/y HF
Tasmania
$16m
Commercial
Stage 2
4,400kg/h bath
20,000t/y HF
Tasmania
$90m
Achieved target fluorine
recovery3
1ABX ASX Announcement, 26 June 2025
2ABX ASX Announcement, 24 October 2022
3ABX ASX Announcement, 30 October 2024
4ABX ASX Announcement, 15 January 2025
5ABX ASX Announcement, 19 December2024
6ABX ASX Announcement, 9 April 2025
ASX:ABX
BATCH PILOT REACTOR PERFORMANCE
4 kg crushed bath and 6 kg H2SO4
97% of fluorine extracted from bath
as HF (two stage process)1
13
1ABX ASX Announcement, 30 October 2024
ASX:ABX
CONTINUOUS PILOT PLANT – BELL BAY, TASMANIA
ALCORE Pilot
plant
Bell Bay
aluminium
smelter
Location
Leased from Rio Tinto at reduced rate1
Orders placed for all key equipment. Most of the
specialised equipment is being fabricated by
experienced overseas suppliers2
Expect equipment to be delivered late 2025 to Q1 20263
Facility
14
1ABX ASX Announcement, 15 January 2025
2ABX ASX Announcement, 9 April 2025
3ABX ASX Announcement, 15 October 2025
ASX:ABX
ANTICIPATED PROJECT MILESTONES
Project Activities
2025 2026 2027 2028 2029
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1
Continuous Pilot
Plant
Engineering Studies
Environmental
Approvals
Commercial Stage 1
Plant
Commercial Stage 2
Plant
15
ASX:ABX
16
INVESTMENT PROPOSITION
Low-cost hydrogen
fluoride production using
aluminium smelter bath
by-product
Will enable hydrogen
fluoride production in
Australia, to reduce 100%
reliance on imports
Team
Experienced and capable
Strongly increasing demand
for fluorine
Batteries
Supply shortage
No hydrogen fluoride produced in
Australia. Limited global fluorspar
resources
New fluorine source
available at low cost
Aluminium smelter bath waste
Chemical process is low risk
Adaptation of existing
commercial process
Pathway to production
First mover globally: at pilot
plant stage
ASX:ABX
17
www.abxgroup.com.au
Suite 2, Level 11, 385 Bourke St
Melbourne VIC 3000
Australia
Phone: +61 3 9692 7222
E: investors@abxgroup.com.au
Mark Cooksey
Managing Director and CEO
E: mcooksey@abxgroup.com.au
Share your feedback
Discover