Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
31 October 2023
ASX: ABX
Quarterly report and activity statement
3 months to 30 September 2023
Highlights
Rare earths (ionic adsorption clay resource in Tasmania)
Resource increased by 30% to 27 million tonnes averaging 770 ppm TREO and 585 ppm
TREO-CeO2 at a cut-off grade of 250 ppm TREO-CeO2
Hole RM336 intersected 17,333 ppm TREO, which is four times higher than
previous highest grade discovery hole RM302
Two exploration licences granted totalling 483 km2, taking total ABx rare earths
exploration footprint in Tasmania to almost 600 km2
Production of hydrogen fluoride and aluminium fluoride from aluminium smelter
waste (ALCORE)
Bath pilot batch reactor fully installed and commissioning in progress
For continuous pilot plant, finalised technical requirements for the oleum production
module and bath reactor module, with two international suppliers
Commercial discussions with potential investors have included the possibility of
locating the pilot plant at an alternative, superior site
Bauxite Operations (Queensland and Tasmania)
Five-year supply agreement for cement-grade bauxite executed with Adelaide Brighton
Cement Limited (ABCL), a subsidiary of Adbri Limited
Corporate
Group available cash at quarter end was $6.87 million
ABx securities total 242,340,814 ordinary shares
R&D tax offsets were received from the Australian Taxation Office for ABx ($503,855)
and ALCORE ($522,715.81)
ABx Group Limited
Level 5 52 Phillip Street Sydney NSW 2000
ABN 14 139 494 885
P: +61 2 9251 7177
F: +61 2 9251 7500
Quarterly report to 30 September 2023
page 2
ABx Group (ASX: ABX) is a uniquely positioned, high-tech Australian company delivering
materials for a cleaner future.
Rare Earths: Record high assay result, four times higher than previous highest
• The mineral resource estimate was increased by 30% to 27 million tonnes1 averaging
803 ppm TREO and 603 ppm TREO-CeO2.2
• An 18-hole drilling program was conducted during August and was designed to explore an
area west of hole RM302, which was ABx’s previous best assay result. All assay results were
received, including an outstanding 17,333 ppm TREO from one sample from hole RM336.3
This sample had four times higher grade than ABx’s previous highest rare earth grade. An
updated resource estimation is underway to identify the high-grade thick zones within the
widespread resource and to identify those areas that require follow-up.
• Two significant exploration licences covering the southwards extensions of the Portrush
discovery near Launceston were granted (Figure 1).4 The two tenements, EL27/2022 and
EL28/2022, total 483 km2 and were granted for an initial term of 5 years. They are located
~52 km east of ABx’s major Deep Leads / Rubble Mound project, and secure the southwards
extension of the high grade Portrush deposit. These two large exploration licences
significantly increase our rare earths exploration footprint in Tasmania to almost 600 km2.
• Exploration licence application EL25/2022 covering the 16 km extension from Deep Leads /
Rubble Mound to the Wind Break REE discovery area is in progress.
• Ongoing discussions with several potential customers continued to endorse the ABx strategy
of producing a mixed rare earth carbonate (MREC) for sale to a refinery. The discussions
highlighted the acute supply risks for dysprosium and terbium in particular.
!
Quarterly report to 30 September 2023
page 3
ABx Rare Earths Strategy
Rare earths have many applications in a wide variety of industries. Permanent magnets are the
most valuable application, representing over 90% of the total value of rare earths demand.
Permanent magnets are used in electric vehicles, wind turbines, smartphones and military
applications. The four most important rare earths for permanent magnets are neodymium,
praseodymium, dysprosium and terbium. The demand for these four rare earths is predicted to
grow significantly in coming years, potentially leading to significant supply shortfalls. The supply
risk is highest for dysprosium and terbium, the two heavy rare earths in permanent magnets.
Globally, most rare earths are sourced from hard-rock mines. These typically require large, costly
processing plants and a significant lead time to reach production.
A less common source of rare earths is ionic adsorption clay (IAC) deposits, which have
historically been mined only in southern China. A major advantage of IAC deposits is that the
rare earths can be extracted from the clay via a low-cost desorption process. Secondly, they
often exist at shallow depth. These advantages enable a project to be developed rapidly and at
lower cost. Furthermore, IAC deposits typically contain a higher proportion of heavy rare earths
compared to hard rock deposits, and low concentrations of radioactive elements such as
uranium and thorium.
ABx is the first company to discover rare earths in Tasmania (Figure 1) and has reported a JORCcompliant mineral resource of 27 million tonnes at its Deep Leads / Rubble Mound project.
ABx engaged Australian Nuclear Science and Technology Organisation (ANSTO) to conduct
desorption tests, which found the highest extractions under relatively neutral conditions
reported from any clay-hosted project in Australia5,6. This proves the mineralisation to be of the
IAC type. Low-cost processing is crucial for clay-hosted rare earth deposits, and industry
processing experts indicate that low-cost processing can only be achieved using desorption with
low acid consumption. Additionally, the rare earths in the Deep Leads / Rubble Mound resource
have the highest proportion of DyTb (4.3% of TREO) of any clay-hosted rare earths resource in
Australia. These factors put ABx at the forefront for customers and countries seeking to diversify
rare earths supply.
Following these excellent discovery and processing results, ABx has built significant momentum
and will continue to conduct further exploration, which will include targeting new areas within
its tenements that have geological features considered prospective for additional rare earths.
The ABx strategy is to produce a mixed rare earth carbonate (MREC) that can be sold to rare
earth refineries. The ABx MREC will be high in heavy rare earths and low in radioactive elements,
which is expected to be attractive to many prospective customers. Market discussions with
several potential customers endorse this strategy.
Quarterly report to 30 September 2023
page 4
Figure 1: ABx leases in the 52 km wide REE province in northern Tasmania.
Quarterly report to 30 September 2023
page 5
ALCORE: installation of bath pilot batch reactor
• The bath pilot batch reactor was fully installed, and commissioning is in progress (Figure
2). This reactor features state-of-the-art technology to enhance process mixing. Following
engineering design by ALCORE, it was ordered from a specialised international supplier
in late March. It features a process capacity ten times larger than the bath laboratory
reactor. If the pilot batch reactor achieves its designed high yield of fluorine from the
aluminium smelter waste, it will:
o Give further confidence that the continuous pilot plant and first commercial plant will
perform as designed
o Enable further development work to be conducted on processing and market
evaluation of the metal sulfate co-products
Figure 2: Bath pilot batch reactor (centre) installed at ALCORE Technology Centre
• For the continuous pilot plant, we finalised the technical requirements within the contract
packages for the oleum production module and bath reactor module, with two
international suppliers. We finalised the technical design for the four scrubbers utilised
in the pilot plant design. The technical requirements and equipment specification sheets
have been sent to potential manufacturers.
• Commercial discussions with potential investors have included the possibility of locating
the pilot plant at an alternative, superior site, instead of the ALCORE Technology Centre
on the NSW Central Coast. Ordering of pilot plant reactors is being deferred until those
commercial discussions are resolved.
Quarterly report to 30 September 2023
page 6
Alcore Strategy
Hydrogen fluoride is an essential chemical for the production of fluorocarbons and
aluminium fluoride. Aluminium fluoride is an essential chemical for aluminium metal
production.
Hydrogen fluoride is mainly produced from fluorspar, which is obtained from the mineral
fluorite. Fluorspar is relatively high cost and has been identified as a critical material by the
USA, Europe, Japan and Canada.
Australia does not mine any fluorite, or produce any fluorspar, hydrogen fluoride or
aluminium fluoride, and so must import all its requirements. The Australian demand for
hydrogen fluoride is small, and it is imported at high cost. Conversely, Australia is a
significant producer of aluminium and so its demand for aluminium fluoride is high.
Australia is the largest producer of primary aluminium metal without its own domestic
aluminium fluoride production, so Australian aluminium smelters rely entirely on imported
aluminium fluoride. This is typically more than 80% from China, but this proportion was only
40% in 2021 when China production was lower, illustrating the supply risks (Figure 3). The
median aluminium fluoride price (FOB China) of the last two years is over US$1,400/t (Figure
4).
Most modern aluminium smelters produce excess bath, for which the only meaningful
market is new smelters, which require bath to commence operations. Aluminium industry
forecasts suggest that the global bath market will increasingly be in surplus, because far
fewer new smelters are being constructed. All of the major global aluminium producers are
eager for alternative applications for excess bath, to avoid the unpalatable options of on-site
storage or landfill.
Alcore has developed a world-first process to recover hydrogen fluoride from aluminium
smelter bath. This is combined with aluminium hydroxide to produce aluminium fluoride.
Alcore is also investigating the use of dross (another aluminium smelter waste) and bauxite
as alternatives to aluminium hydroxide as the source of aluminium. The use of dross or
bauxite would further lower the production cost.
Alcore intends to construct commercial hydrogen fluoride and aluminium fluoride plants in
Bell Bay, Tasmania. The aluminium source for the initial aluminium fluoride production is
likely to be aluminium hydroxide, as this is lower risk and allows a faster path to production.
Subsequent production may use aluminium from dross or bauxite to further improve the
financial and environmental outcomes.
The initial plant is proposed to transform 1,600 tonnes per year of aluminium smelter bath
into hydrogen fluoride and other industrial chemicals. A proportion of the hydrogen fluoride
will be further processed to aluminium fluoride. The relative amounts of hydrogen fluoride
and aluminium fluoride produced can be optimised to suit market demand. Alcore’s longer
term plan is to expand the plant by 15 times, which will process all of Australia’s aluminium
smelter bath and supply more than 80% of Australia’s aluminium fluoride requirements.
Quarterly report to 30 September 2023
page 7
$&"""
$""""
#&"""
#""""
&"""
"
$"#'
$"#(
$"#)
$"#*
$"$"
$"$#
$"$$
$"$%
Figure 3: Imports of aluminium fluoride from China into Australia (source: China Customs Statistics)
Figure 4: Aluminium fluoride monthly prices FOB China (source: China Customs Statistics)
Quarterly report to 30 September 2023
page 8
Bauxite Operations
Sunrise Bauxite Project: Binjour, Queensland
• Survey reports of the Bundaberg port lease area are planned to commence in December
2023.
• The application to modify the site boundary at the Bundaberg port is being progressed
by the Department of Resources.
• Scheduling of the planned environmental studies at the mine and port sites are
continuing.
DL130 Bauxite Project: Tasmania
• An agreement was executed with Adelaide Brighton Cement Limited (ABCL), a subsidiary
of Adbri Limited (ASX:ABC), for the supply of cement-grade bauxite to ABCL’s Birkenhead
cement manufacturing operation in South Australia.7 The agreement forecasts supply of
90,000-120,000 tonnes of bauxite over a five-year term, with first shipment anticipated
inQ1 2024. The bauxite sale price has been agreed for the first shipment and is
satisfactorily profitable and commercial-in-confidence. The sale price is to be negotiated
for subsequent shipments. ABCL has the option to extend the term for a further five
years.
• The bauxite material for ABCL to trial is on site at the Birkenhead cement manufacturing
operation. ABCL will trial the material at an appropriate time within their production
schedule.
• It is planned to excavate a further 1,000 tonnes of bauxite from a second trial pit and
provide it to two customers. This is expected to take place in the December quarter.
• The EPA approved the Environmental Effects Report (EER) for the mine lease application.
• Some aspects of the mine lease application are taking longer than planned. These are no
major issues, and they should all be straightforward to resolve, but commencement of
mining is now expected in Q2 2024.
Bauxite Strategy
The ABx strategy is to selectively produce metallurgical grade, cement grade and fertiliser
grade bauxite, with a focus on profitability.
The largest project is Binjour, with a JORC compliant resource of 37 million tonnes,
supporting 20-25 years production. In February 2022, ABx entered a JV with Alumin for the
development of the Sunrise Bauxite Project, comprising a bauxite mine at Binjour plateau
and port operations at Bundaberg in Queensland8. Alumin is an Australian special purpose
vehicle company associated with our strategic marketing partner, Rawmin India, having
Quarterly report to 30 September 2023
page 9
extensive experience in funding long term sustainable investments in projects involving
mining and bulk-shipping of metallurgical grade bauxite to end users around the world.
It is anticipated that the mine at Binjour will export 500,000 tonnes per year of metallurgical
grade bauxite in its first year of production, then scale up to full operational capacity of 1.5
million tonnes per year. ABx plans to begin exporting product in H1 2025.
In Tasmania, ABx has a JORC compliant resource of 13.7 million tonnes across three deposits.
ABx plans to recommence bauxite mining in Tasmania by Q2 2024, at the DL130 Bauxite
Project. The primary products are likely to be cement grade and fertiliser grade bauxite.
An updated company presentation has been placed on the ABx website
www.abxgroup.com.au.
This announcement is approved for release by the board of directors.
For further information please contact:
Dr Mark Cooksey
Managing Director and CEO
ABx Group
Mobile: +61 447 201 536
Email: mcooksey@abxgroup.com.au
Website: abxgroup.com.au
Quarterly report to 30 September 2023
page 10
)&*/'03."5*0/*/5)*43&10355)"53&-"5&5091-03"5*0//'03."5*0/"/%*/&3"-&4063$&4"3&#"4&%0/
*/'03."5*0/ $0.1*-&% #: "$0# &#&, "/% "/ &7: 8)0 "3& .&.#&34 0' )& 6453"-"4*"/ /45*565& 0' */*/( "/%
&5"--63(:"/%5)&6453"-*"//45*565&0'&04$*&/5*4543&#&,"/%3&7:"3&26"-*'*&%(&0-0(*454"/%3&7:*4
"%*3&$5030'93061*.*5&%
)&*/'03."5*0/3&-"5*/(50*/&3"-&4063$&40/5)&"*/-"/%8"413&1"3&%"/%'*345%*4$-04&%6/%&35)&
0%& 5)"4/05#&&/61%"5&%4*/$&50$0.1-:8*5)5)&0%& 0/5)&#"4*45)"55)&*/'03."5*0/
)"4/05."5&3*"--:$)"/(&%4*/$&*58"4-"453&1035&%3&#&,"/%3&7:)"7&46''*$*&/5&91&3*&/$&8)*$)*43&-&7"/5
505)&45:-&0'.*/&3"-*4"5*0/"/%5:1&0'%&104*56/%&3$0/4*%&3"5*0/"/%505)&"$5*7*5:8)*$)5)&:"3&6/%&35",*/(50
26"-*':"4"0.1&5&/5&340/"4%&'*/&%*/5)& %*5*0/0'5)&6453"-"4*"/0%&'03&1035*/(0'&91-03"5*0/&46-54
*/&3"-&4063$&4"/%3&&4&37&43&#&,"/%3&7:)"7&$0/4&/5&%*/83*5*/(505)&*/$-64*0/*/5)*43&10350'
5)&91-03"5*0//'03."5*0/*/5)&'03."/%$0/5&95*/8)*$)*5"11&"34
)&*/'03."5*0/3&-"5*/(5091-03"5*0//'03."5*0/"/%*/&3"-&4063$&4*/ "4."/*")"4#&&/13&1"3&%
0361%"5&%6/%&35)&0%& 3&#&,"/%3&7:)"7&46''*$*&/5&91&3*&/$&8)*$)*43&-&7"/5505)&45:-&
0'.*/&3"-*4"5*0/"/%5:1&0'%&104*56/%&3$0/4*%&3"5*0/"/%505)&"$5*7*5:8)*$)5)&:"3&6/%&35",*/(5026"-*':"4
" 0.1&5&/5 &340/ "4 %&'*/&% */ 5)& %*5*0/ 0' 5)& 6453"-"4*"/ 0%& '03 &1035*/( 0' 91-03"5*0/ &46-54
*/&3"-&4063$&4"/%3&&4&37&43&#&,"/%3&7:)"7&$0/4&/5&%*/83*5*/(505)&*/$-64*0/*/5)*43&1035
0'5)&91-03"5*0//'03."5*0/*/5)&'03."/%$0/5&95*/8)*$)*5"11&"34
)&*/'03."5*0/3&-"5*/(505)&-"5&45&4063$&461%"5&*4&953"$5&%'30.5)&3&1035&/5*5-&%;!3&4063$&
*/$3&"4&4 50
. 50//&4 "/% /&8 %*4$07&3*&4< %"5&% 6-: "/% *4 "7"*-"#-& 50 7*&8 0/
)5514888"#9(3061$0."64*5&*/7&4503*/'03."5*0/"49"//06/$&.&/54
)& 0.1"/: $0/'*3.4 5)"5 *5 *4 /05 "8"3& 0' "/: /&8 */'03."5*0/ 03 %"5" 5)"5 ."5&3*"--: "''&$54 5)& */'03."5*0/
*/$-6%&%*/5)&$0.1"/:=4."3,&5"//06/$&.&/54"/%*/5)&$"4&0'&45*."5&40'*/&3"-&4063$&4033&&4&37&4
5)"5 "-- ."5&3*"- "446.15*0/4 "/% 5&$)/*$"- 1"3".&5&34 6/%&31*//*/( 5)& &45*."5&4 */ 5)& 3&-&7"/5 ."3,&5
"//06/$&.&/5$0/5*/6&50"11-:"/%)"7&/05."5&3*"--:$)"/(&%
)&0.1"/:"-40$0/'*3.45)"55)&'03."/%$0/5&95*/8)*$)5)&0.1&5&/5&340/=4'*/%*/(4"3&13&4&/5&%)"7&
/05#&&/."5&3*"--:.0%*'*&%'30.5)&03*(*/"-."3,&5"//06/$&.&/54
)*4 ! "//06/$&.&/5 //06/$&.&/5 $0/5"*/4 7"3*064 '038"3%-00,*/( 45"5&.&/54 -- 45"5&.&/54 05)&3 5)"/
45"5&.&/54 0' )*4503*$"- '"$5 "3& '038"3%-00,*/( 45"5&.&/54 038"3%-00,*/( 45"5&.&/54 "3& */)&3&/5-: 46#+&$5 50
6/$&35"*/5*&4*/5)"55)&:.":#&"''&$5&%#:"7"3*&5:0',/08/"/%6/,/08/3*4,47"3*"#-&4"/%'"$50348)*$)$06-%
$"64&"$56"-7"-6&4033&46-541&3'03."/$&03"$)*&7&.&/5450%*''&3."5&3*"--:'30.5)&&91&$5"5*0/4%&4$3*#&%*/
46$)'038"3%-00,*/(45"5&.&/54
9%0&4/05(*7&"/:"4463"/$&5)"55)&"/5*$*1"5&%3&46-541&3'03."/$&03"$)*&7&.&/54&913&44&%03*.1-*&%*/
5)04&'038"3%-00,*/(45"5&.&/548*--#&"$)*&7&%
&'*/&% 3& /%6453*&4 5% 8"4 5)& 08/&3 0' 5)& 130$&44 5&$)/0-0(: 7*" =4 */5&--&$56"- 1301&35:
$0.1"/:&3,&-&:30$&44 &$)/0-0(*&45:5%8)*$)*446&%"(-0#"-&9$-64*7&-*$&/$&'035)&"-6.*/*6.3&-"5&%
1035*0/0'5)&130$&445&$)/0-0(:509*/07&.#&3 "/%9)"4*446&%"(-0#"-&9$-64*7&46#-*$&/$&
508)&/8"4*/$03103"5&%0/ 6-:
'5&3 " $0.1"/: 3&4536$563& "/% &91"/4*0/ 0' 5)& 1"5&/5 %&'*/*5*0/ 50 $07&3 *40-"5*0/ "/% &953"$5*0/ 0' .*/&3"-
$0.106/%4 .&5"-4 .&5"--0*%4 "--0:4 "/% &-&.&/54 '30. 8"45& 453&".4 .*/&3"- 03&4 3&$:$-"#-& $0..0%*5*&4
*/%6453*"-#:130%6$54"/%.*9&%46#45"/$&45)&)0-%*/($0.1"/:*4/08/".&%03&&'*/*/(*.*5&%"/%5)&
*/5&--&$56"- 1301&35: $0.1"/: *4 03& /5&--*(&/$& 6453"-*" 5: 5% 8)*$) )0-%4 5)& "5&/5 11-*$"5*0/ 0
"/%5)&(-0#"-&9$-64*7&-*$&/$&4509"/%$0/5*/6&*/'03$&
=4130$&445&$)/0-0(:*/70-7&45)&3&'*/*/(0'"8*%&3"/(&0'03&5:1&464*/("$0.#*/"5*0/0''-603*/&"$*%4
"/%3&-"5&%5)&3."-&/&3(:130$&4445&14 )&5&$)/0-0(:5)"5*4-*$&/4&%509"/%#:*41"350'=4
#30"%&303&5&$)/0-0(:
Quarterly report to 30 September 2023
page 11
!
19(5(//
#$5$/*$5(3/$&(0(173(1',1*
(1526( 8$55<(;3,5('
21$5$
(/25$,1(
5266(5=6!2$'
!8%%/(281'
257586+;7(16,21
257586+"287+
"815,6($33/,&$7,21
,1-285
27(6 2 7(1(0(176 :(5( 5(/,148,6+(' #:2 ;3/25$7,21
,&(1&(6
$1'
:(5(*5$17(',11257+(51
#$60$1,$
#221'221
//7(1(0(176$5(,1*22'67$1',1*
2:1('$1'12768%-(&7
72$1<7+,5'3$57<52<$/7,(6125$5(7+(<(1&80%(5(',1$1<:$<
;3/25$7,21(;3(1',785(5(3257(''85,1*7+(48$57(55(/$7('72
7+(!352*5$0'(9(/230(17
5(6($5&+&21'8&7('%</&25(:,7+5(63(&772,765(3257('$'9$1&(0(176
20,1,1*352'8&7,21:$6&21'8&7(''85,1*7+(48$57(5
',5(&7256 )((6 :(5( 3$,' 72 $8/ (1121 $1 (9<
(11(7+281'<$1'$5.22.6(<)257+(,56(59,&(65(1'(5('
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
ABx Group Limited
ABN
Quarter ended (“current quarter”)
14 139 494 885
30 September 2023
Consolidated statement of cash flows
Current quarter
$A’000
Year to date ( 9
months)
$A’000
84
137
(a) exploration & evaluation
(618)
(1,946)
(b) development
(343)
(989)
(c) production
-
-
(d) staff costs
(48)
(280)
(e) administration and corporate costs
(133)
(440)
-
-
56
109
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (Government RD/Innovation Grant)
593
6,976
1.9
Net cash from / (used in) operating
activities
(409)
3,567
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
(114)
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
-
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date ( 9
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
-
(114)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
1,500
1,500
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(114)
(114)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (Net proceed from issuing of equity
securities – controlled entity)
-
-
3.10
Net cash from / (used in) financing
activities
1,386
1,386
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
5,919
2,057
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(409)
3,567
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
-
(114)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
1,386
1,386
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date ( 9
months)
$A’000
-
-
6,896
6,896
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
289
364
5.2
Call deposits
1,097
-
5.3
Bank overdrafts
-
-
5.4
Other (Held in trust)
5,510
5,555
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
6,896
5,919
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
110
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
6.3
Include below any explanation necessary to under the transactions included in items 6.1
and 6.2
Current quarter
$A'000
$110,074 director fee were paid to Paul Lennon and Mark Cooksey for
their services rendered.
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(409)
8.4
Cash and cash equivalents at quarter end (item 4.6)
6,896
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
-
$A’000
(409)
-
6,896
16
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer:
N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer:
N/A
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer:
N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
.............................25 October 2023.............................................
Authorised by: ...............Mark Cooksey, CEO.....................................
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prep