Highlights
Rare earths (ionic adsorption clay resource in Tasmania)
Resource increased to 52 million tonnes averaging 817 ppm TREO and 633 ppm TREOCeO2 at a cut-off grade of 350 ppm TREO-CeO2
66-hole drilling campaign conducted from October to December, including the first
drilling program dedicated to rare earths at the Wind Break deposit
Initial assay results were received post the end of the quarter, which confirmed that
ABx’s northern Tasmanian exploration target area exceeds 100 km2
Production of hydrogen fluoride and aluminium fluoride from aluminium smelter
waste (ALCORE)
Bath pilot batch reactor was commissioned and commenced operations
Three test runs were completed under standard process conditions. Observations and
preliminary results indicate that the enhanced process mixing is delivering higher
fluorine yield in a single pass
Commercial discussions continued with potential strategic investors
Bauxite Operations (Queensland and Tasmania)
It is understood that Adelaide Bright Cement has used the trial shipment of ABx bauxite
material in its cement manufacturing operation with no significant issues
390 tonnes of bauxite were excavated from a trial pit and provided to a customer. A
further 600 tonnes will be excavated in January
Corporate
Group available cash at quarter end was $5.82 million. Post the end of the quarter,
$615,960 was raised in a Share Purchase Plan
At 2 January 2024, ABx securities total 250,040,314 ordinary shares
ABx subscribed to Socialsuite’s reporting platform to assist with monitoring and
disclosing progress against ESG metrics
ABx Group Limited
Level 5 52 Phillip Street Sydney NSW 2000
ABN 14 139 494 885
P: +61 2 9251 7177
F: +61 2 9251 7500
Quarterly report to 31 December 2023
page 2
ABx Group (ASX: ABX) is a uniquely positioned, high-tech Australian company delivering
materials for a cleaner future.
Rare Earths: resource increased to over 50 million tonnes
•
The mineral resource estimate was increased to 52 million tonnes1 averaging 817 ppm TREO
and 633 ppm TREO-CeO2.2 The resource has the highest proportion of dysprosium and
terbium (Dy+Tb is 4.4% of TREO) of any clay-hosted rare earths resource in Australia.
•
An 66-hole drilling program was conducted from October to December. This was designed
to test step-out locations from ABx’s previous drilling campaign, which intersected the
highest assays to date.3
•
Initial drilling was conducted at the Wind Break deposit, the first drilling program dedicated
to rare earths at this location. This was supported by funding from Mineral Resources
Tasmania for Round 8 of the Exploration Drilling Grant Initiative (EDGI). The funding is for up
to a maximum of $70,000 on a dollar-for-dollar basis. 4 Initial assay results were received post
the end of the quarter, which confirmed that ABx’s northern Tasmanian exploration target
area exceeds 100 km2 5
•
The remainder of the drilling program was conducted at the northern extensions of the Deep
Leads – Rubble Mound resource. Assay results are expected in January and February 2024
•
Exploration licence application EL25/2022 covering the 16 km extension from Deep Leads /
Rubble Mound to the Wind Break REE discovery area is in progress.
•
Ongoing discussions with several potential customers continued to endorse the ABx strategy
of producing a mixed rare earth carbonate (MREC) for sale to a separation plant. The
discussions highlighted the acute supply risks for dysprosium and terbium in particular.
45 Mt inferred and 7 Mt indicated
ASX announcement 20 November 2023
3
ASX announcement 27 September 2023
4
ASX announcement 7 November 2023
5
ASX announcement 22 January 2024
1
2
Quarterly report to 31 December 2023
page 3
Rare Earths Strategy
Rare earths have many applications in a wide variety of industries. Permanent magnets are the
most valuable application, representing over 90% of the total value of rare earths demand.
Permanent magnets are used in electric vehicles, wind turbines, smartphones and military
applications. The four most important rare earths for permanent magnets are neodymium,
praseodymium, dysprosium and terbium. The demand for these four rare earths is predicted to
grow significantly in coming years, potentially leading to significant supply shortfalls. The supply
risk is highest for dysprosium and terbium, the two heavy rare earths in permanent magnets.
Globally, most rare earths are sourced from hard-rock mines. These typically require large, costly
processing plants and a significant lead time to reach production.
A less common source of rare earths is ionic adsorption clay (IAC) deposits, which have
historically been mined only in southern China. A major advantage of IAC deposits is that the
rare earths can be extracted from the clay via a low-cost desorption process. Secondly, they
often exist at shallow depth. These advantages enable a project to be developed rapidly and at
lower cost. Furthermore, IAC deposits typically contain a higher proportion of heavy rare earths
compared to hard rock deposits, and low concentrations of radioactive elements such as
uranium and thorium.
ABx is the first company to discover rare earths in Tasmania (Figure 1) and has reported a JORCcompliant mineral resource of 52 million tonnes at its Deep Leads / Rubble Mound project.
ABx engaged Australian Nuclear Science and Technology Organisation (ANSTO) to conduct
desorption tests, which found the highest extractions under relatively neutral conditions
reported from any clay-hosted project in Australia 6,7. This proves the mineralisation to be of the
IAC type. Low-cost processing is crucial for clay-hosted rare earth deposits, and industry
processing experts indicate that low-cost processing can only be achieved using desorption with
low acid consumption. Additionally, the rare earths in the Deep Leads / Rubble Mound resource
have the highest proportion of dysprosium and terbium (Dy+Tb is 4.4% of TREO) of any clayhosted rare earths resource in Australia. Furthermore, the level of radioactive elements is very
low (2 ppm U2O3 and 6 ppm ThO). These factors put ABx at the forefront for customers and
countries seeking to diversify rare earths supply.
Following these excellent discovery and processing results, ABx has built significant momentum
and will continue to conduct further exploration, which will include targeting new areas within
its tenements that have geological features considered prospective for additional rare earths.
The ABx strategy is to produce a mixed rare earth carbonate (MREC) that can be sold to rare
earth separation plants, which produces separated rare earth oxides. The ABx MREC will be high
in heavy rare earths and low in radioactive elements, which is expected to be attractive to many
prospective customers. Market discussions with several potential customers endorse this
strategy.
6
7
ASX announcement 31 May 2022
ASX announcement 2 February 2023
Quarterly report to 31 December 2023
page 4
ABx tenements
p
EL7/2010
Launceston
EL9/2010
EL18/2014
Hobart
EL10/2021
EL25/2022
EL27/2022
Applica�on
Wind Break
EL28/2022
Launceston
Infrastructure
Airport
Deep
Leads
Railway
Rubble
Mound
Main Road
Secondary Road
NEW
EL27/2022
NEW
EL28/2022
Figure 1: ABx leases in the 52 km wide REE province in northern Tasmania.
Quarterly report to 31 December 2023
page 5
ALCORE: positive results from bath pilot batch reactor
•
The bath pilot batch reactor was commissioned and commenced operations. 8 The new
reactor is approximately ten times larger than the Company’s previous laboratory-scale
reactor
•
Three test runs were completed under standard process conditions (Figure 2). 9 Each run
involved approximately 10 kg total of bath and sulfuric acid. Following two runs and
minor equipment modifications, the reactor is now performing as designed. In particular,
the reactor is achieving enhanced process mixing.
•
Hydrogen fluoride gas was successfully produced throughout each of the test runs. In
the most recent run, several kilograms of metal sulfate powder were produced (Figure 3)
that appeared similar to the powder previously produced by more manual methods and
multiple processing steps using smaller reactors, where more than 90% of the fluorine
was extracted.
•
This gives confidence that the enhanced process mixing is delivering higher fluorine yield
in a single pass, which is a highly significant milestone for the ongoing scale-up of the
ALCORE process.
•
Several powder samples from the runs have been sent to an external laboratory to
measure the fluorine content and confirm the fluorine yield. Results from these
independent assessments are anticipated in January 2024.
•
Commercial discussions continued with potential strategic investors, and have included
the possibility of locating the continuous pilot plant at an alternative, superior site,
instead of the ALCORE Technology Centre on the NSW Central Coast. Ordering of
continuous pilot plant reactors is being deferred until those commercial discussions are
agreed.
8
9
ASX announcement 8 November 2023
ASX announcement 13 December 2023
Quarterly report to 31 December 2023
page 6
Figure 2: Third run of bath pilot batch reactor under standard process conditions
Figure 3: Sample of metal sulfate powder produced from bath pilot batch reactor
Quarterly report to 31 December 2023
page 7
ALCORE Strategy
Hydrogen fluoride is an essential chemical for the production of fluorocarbons and
aluminium fluoride. Aluminium fluoride is an essential chemical for aluminium metal
production. Fluorine has been recently added to Australia’s critical minerals list.
Hydrogen fluoride is mainly produced from fluorspar, which is obtained from the mineral
fluorite. Fluorspar is relatively high cost and has been identified as a critical material by the
USA, Europe, Japan and Canada.
Australia does not mine any fluorite, or produce any fluorspar, hydrogen fluoride or
aluminium fluoride, and so must import all its requirements. The Australian demand for
hydrogen fluoride is small, and it is imported at high cost. Conversely, Australia is a
significant producer of aluminium and so its demand for aluminium fluoride is high.
Australia is the largest producer of primary aluminium metal without its own domestic
aluminium fluoride production, so Australian aluminium smelters rely entirely on imported
aluminium fluoride. This is typically more than 80% from China, but this proportion was only
40% in 2021 when China production was lower, illustrating the supply risks (Figure 4). The
median aluminium fluoride price (FOB China) for the last two years is over US$1,400/t (Figure
5).
Most modern aluminium smelters produce excess bath, for which the only meaningful
market is new smelters, which require bath to commence operations. Aluminium industry
forecasts suggest that the global bath market will increasingly be in surplus, because far
fewer new smelters are being constructed. All of the major global aluminium producers are
eager for alternative applications for excess bath, to avoid the unpalatable options of on-site
storage or landfill.
ALCORE has developed a world-first process to recover hydrogen fluoride from aluminium
smelter bath. This is combined with aluminium hydroxide to produce aluminium fluoride.
ALCORE is also investigating the use of dross (another aluminium smelter waste) and bauxite
as alternatives to aluminium hydroxide as the source of aluminium. The use of dross or
bauxite would further lower the production cost.
ALCORE intends to construct commercial hydrogen fluoride and aluminium fluoride plants
in Bell Bay, Tasmania. The aluminium source for the initial aluminium fluoride production is
likely to be aluminium hydroxide, as this is lower risk and allows a faster path to production.
Subsequent production may use aluminium from dross or bauxite to further improve the
financial and environmental outcomes.
The initial plant is proposed to transform 1,600 tonnes per year of aluminium smelter bath
into hydrogen fluoride and other industrial chemicals. A proportion of the hydrogen fluoride
will be further processed to aluminium fluoride. The relative amounts of hydrogen fluoride
and aluminium fluoride produced can be optimised to suit market demand. ALCORE’S longer
term plan is to expand the plant by 15 times, which will process all of Australia’s aluminium
smelter bath and supply more than 80% of Australia’s aluminium fluoride requirements.
Quarterly report to 31 December 2023
page 8
AlF3 imports from China (tonnes)
25,000
20,000
15,000
10,000
5,000
0
2016
2017
2018
2019
2020
2021
2022
2023
Figure 4: Imports of aluminium fluoride from China into Australia (source: China Customs Statistics)
$2,000
$1,800
AlF3 price FOB China (US$/t)
$1,600
$1,400
$1,200
$1,000
$800
$600
$400
$200
$0
Dec-11 Dec-12 Dec-13 Dec-14 Dec-15 Dec-16 Dec-17 Dec-18 Dec-19 Dec-20 Dec-21 Dec-22 Dec-23
Figure 5: Aluminium fluoride monthly prices FOB China (source: China Customs Statistics)
Quarterly report to 31 December 2023
page 9
Bauxite Operations
Sunrise Bauxite Project: Binjour, Queensland
•
Survey reports of the Bundaberg port lease area are planned to commence in Q1, 2024
•
The application to modify the site boundary at the Bundaberg port is continuing to be
progressed by the Department of Resources.
•
Environmental studies at the mine and port sites are being planned for Q1, 2024
DL130 Bauxite Project: Tasmania
•
It is understood that Adelaide Bright Cement has used the trial shipment of ABx bauxite
material in its cement manufacturing operation with no significant issues
•
390 tonnes of bauxite were excavated from a trial pit and provided to a customer. A
further 600 tonnes will be excavated in January
•
Some aspects of the mine lease application are taking longer than planned. These are
not major issues, and they should all be straightforward to resolve, but commencement
of mining is now expected in Q3 2024.
Bauxite Strategy
The ABx strategy is to selectively produce metallurgical grade, cement grade and fertiliser
grade bauxite, with a focus on profitability. ABx bauxite can substantially improve the
properties of superphosphate fertiliser.
The largest project is Binjour, with a JORC compliant resource of 37 million tonnes,
supporting 20-25 years production. In February 2022, ABx entered a JV with Alumin for the
development of the Sunrise Bauxite Project, comprising a bauxite mine at Binjour plateau
and port operations at Bundaberg in Queensland 10. Alumin is an Australian special purpose
vehicle company associated with our strategic marketing partner, Rawmin India, having
extensive experience in funding long term sustainable investments in projects involving
mining and bulk-shipping of metallurgical grade bauxite to end users around the world.
It is anticipated that the mine at Binjour will export 500,000 tonnes per year of metallurgical
grade bauxite in its first year of production, then scale up to full operational capacity of 1.5
million tonnes per year. ABx has reforecast its timeline to begin exporting of product in H2
2025.
In Tasmania, ABx has a JORC compliant resource of 13.7 million tonnes across three deposits.
ABx plans to recommence bauxite mining in Tasmania by Q2 2024, at the DL130 Bauxite
Project. The primary products are likely to be cement grade and fertiliser grade bauxite.
An updated company presentation has been placed on the ABx website
www.abxgroup.com.au.
10
ASX Announcement 28 February 2022
Quarterly report to 31 December 2023
page 10
This announcement is approved for release by the board of directors.
For further information please contact:
Dr Mark Cooksey
MD & CEO
ABx Group
+61 447 201 536
mcooksey@abxgroup.com.au
www.abxgroup.com.au
Media
Chapter One Advisors
David Tasker / Alex Baker
+61 433 112 936 / +61 432 801 745
dtasker@chapteroneadvisors.com.au /
abaker@chapteroneadvisors.com.au
Quarterly report to 31 December 2023
page 11
Qualifying statements
General: The information in this report that relate to Exploration Information and Mineral Resources are based on
information compiled by Jacob Rebek and Ian Levy who are members of The Australasian Institute of Mining and
Metallurgy and the Australian Institute of Geoscientists. Mr Rebek and Mr Levy are qualified geologists and Mr Levy is
a director of ABx Group Limited.
Mainland: The information relating to Mineral Resources on the Mainland was prepared and first disclosed under the
JORC Code 2004. It has not been updated since to comply with the JORC Code 2012 on the basis that the information
has not materially changed since it was last reported. Mr Rebek and Mr Levy have sufficient experience, which is relevant
to the style of mineralisation and type of deposit under consideration and to the activity, which they are undertaking to
qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of exploration Results,
Mineral Resources and Ore Reserves. Mr Rebek and Mr Levy have consented in writing to the inclusion in this report of
the Exploration Information in the form and context in which it appears.
Tasmania: The information relating to Exploration Information and Mineral Resources in Tasmania has been prepared
or updated under the JORC Code 2012. Mr Rebek and Mr Levy have sufficient experience, which is relevant to the style
of mineralisation and type of deposit under consideration and to the activity, which they are undertaking to qualify as
a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves. Mr Rebek and Mr Levy have consented in writing to the inclusion in this report
of the Exploration Information in the form and context in which it appears.
The information relating to the latest REE Resources update is extracted from the report entitled “ABx Rare Earth
Resources Exceed 50 Million Tonnes” dated 20 November 2023 and is available to view on
https://www.abxgroup.com.au/site/investor-information/asx-announcements (2023).
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the company’s market announcements and, in the case of estimates of Mineral Resources or Ore Reserves,
that all material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed.
The Company also confirms that the form and context in which the Competent Person’s findings are presented have
not been materially modified from the original market announcements.
Disclaimer Regarding Forward Looking Statements
This ASX announcement (Announcement) contains various forward-looking statements. All statements other than
statements of historical fact are forward-looking statements. Forward-looking statements are inherently subject to
uncertainties in that they may be affected by a variety of known and unknown risks, variables and factors which could
cause actual values or results, performance or achievements to differ materially from the expectations described in
such forward-looking statements.
ABx does not give any assurance that the anticipated results, performance or achievements expressed or implied in
those forward-looking statements will be achieved.
Patent
Refined Ore Industries Ltd (ROIL) was the owner of the CORE process technology via ROIL’s intellectual property
company, Berkeley Process Technologies Pty. Ltd which issued a global exclusive licence for the aluminium-related
portion of the CORE process technology to ABx in November 2017 and ABx has issued a global exclusive sub-licence
to ALCORE when ALCORE was incorporated on 1 July 2018.
After a company restructure and expansion of the patent definition to cover isolation and extraction of mineral
compounds, metals, metalloids, alloys and elements from waste streams, mineral ores, recyclable commodities,
industrial by-products and mixed substances, the holding company is now named Core Refining Limited (CRL) and the
intellectual property company is Core Intelligence Australia Pty Ltd (CIAL) which holds the Patent Application No.
2019904311 and the global exclusive licences to ABx and ALCORE continue in force.
CRL’s CORE process technology involves the refining of a wide range of ore types using a combination of fluorine acids
and related thermal energy process steps. The technology that is licensed to ABx and ALCORE by CRL is part of CRL’s
broader Core technology.
Quarterly report to 31 December 2023
page 12
Table 1: Tenement information required under LR 5.3.3
Tenement No.
Location
New South Wales
EL 6997
Inverell
EL 7357
Taralga replacement pending
EL 8600
Penrose Quarry expired
Queensland
MLA 100277
Sunrise ML application
EPM 27787
Binjour
ML 80126
Toondoon ML
Tasmania
EL 7/2010
Conara
EL 9/2010
Deloraine
EL 18/2014
Prosser’s Road
EL 10/2021
Rubble Mound
EL 27/2022
Portrush Extension
EL 28/2022
Portrush South
Notes: No tenements were relinquished or granted during the
quarter.
All tenements are in good standing, 100% owned and not subject
to any third-party royalties nor are they encumbered in any way.
Information required under Listing Rule 5.3.1: Exploration expenditure reported during the quarter related to
the REE program development ($485,000), research conducted by ALCORE with respect to its reported advancements
($359,000).
Information required under Listing Rule 5.3.2: No mining production was conducted during the quarter.
Information required under Listing Rule 5.3.5: $135,000 directors fees were paid to Paul Lennon, Ian Levy,
Kenneth Boundy and Mark Cooksey for their services rendered.
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
ABx Group Limited
ABN
Quarter ended (“current quarter”)
14 139 494 885
31 December 2023
Consolidated statement of cash flows
Current quarter
$A’000
Year to date ( 12
months)
$A’000
104
241
(a) exploration & evaluation
(485)
(2,431)
(b) development
(359)
(1,348)
(c) production
-
-
(d) staff costs
(179)
(459)
(e) administration and corporate costs
(272)
(712)
-
-
54
163
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (Government RD/Innovation Grant)
176
7,152
1.9
Net cash from / (used in) operating
activities
(961)
2,606
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(12)
(126)
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
-
(c) property, plant and equipment
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date ( 12
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(12)
(126)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
1,500
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(72)
(186)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (Net proceed from issuing of equity
securities – controlled entity)
-
-
3.10
Net cash from / (used in) financing
activities
(72)
1,314
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
6,896
2,057
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(961)
2,606
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(12)
(126)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(72)
1,314
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date ( 12
months)
$A’000
-
-
5,851
5,851
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
89
289
5.2
Call deposits
329
1,097
5.3
Bank overdrafts
-
-
5.4
Other (Held in trust)
5,433
5,510
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
5,851
6,896
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
135
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
6.3
Include below any explanation necessary to under the transactions included in items 6.1
and 6.2
Current quarter
$A'000
$135,074 director fee were paid to Paul Lennon, Kenneth Boundy and
Mark Cooksey for their services rendered.
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(961)
8.4
Cash and cash equivalents at quarter end (item 4.6)
5,851
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
•
8.7
-
$A’000
(961)
-
5,851
ABX completed share purchase plan to raise $0.61M in Jan 2024
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
6
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer:
N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer:
N/A
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer:
N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
.............................23 January 2024.............................................
Authorised by: ...............Mark Cooksey, CEO.....................................
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required
Share your feedback
Discover