Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
30 April 2024
ASX: ABX
Quarterly report and activity statement
3 months to 31 March 2024
Highlights
Rare earths (ionic adsorption clay resource in Tasmania)
66-hole drilling campaign conducted mid-January to early March, including the first
drilling program dedicated to rare earths at the Wind Break deposit
Assay results continue to confirm that the ABx deposits have the highest proportions
of the most valuable permanent magnet rare earths of any clay-hosted rare earths
resource in Australia
Resource update in progress and planned to be announced soon
Production of hydrogen fluoride and aluminium fluoride from aluminium smelter
waste (ALCORE)
Rigorous investigation of process conditions continued using the bath pilot batch
reactor
Fluorine recovery very close to the 90% target. Results provide confidence that this can
be achieved at commercial scale
Commercial discussions continued with potential strategic investors
Bauxite Operations (Queensland and Tasmania)
Remodelling of the Binjour mine plan was completed to further enhance functionality
and maximise operational efficiencies
Negotiations are continuing with multiple offtake partners for potential long term
supply contracts from Binjour
Corporate
Appointed Joycelyn Morton as Non-Executive Director
$615,960 was raised in a Share Purchase Plan at the beginning of the quarter. Group
available cash at quarter end was $0.36 million, with a further $5.21 million held in trust.
At 31 March 2024, ABx securities total 250,040,314 ordinary shares
ABx Group Limited
ABN 14 139 494 885
ASX: ABX
Level 4, 100 Albert Road, South Melbourne, VIC 3205
P: +61 3 9692 7222
F: +61 2 9956 7355
Quarterly report to 31 March 2024
ABx Group (ASX: ABX) is a uniquely positioned, high-tech Australian company delivering
materials for a cleaner future.
Rare Earths: Area of high-grade mineralisation extended
The assay results were received from the first rare earths drilling campaign at the Wind Break
deposit, which was conducted in late 2023. Like all ABx rare earth deposits in Tasmania, the
Wind Break mineralisation is highly enriched in the two rare earths with the most critical
supply risk, dysprosium (Dy) and terbium (Tb), with Dy+Tb exceeding 4.5% of TREO.1 The
results confirmed that ABx’s northern Tasmanian exploration target area exceeds 100 km2.
A 66-hole drilling program was conducted from mid-January to early March. This was to focus
on the large potential extensions of Deep Leads and Leech Scrub high-grade zones, and also
to commence drilling at the high-grade Rubble Mound zone that had yet to be drilled
specifically for rare earth mineralisation.
The assay results were received before the end of the quarter for all except 12 holes.2,3 These
continued to show high proportions of dysprosium and terbium. Typically, the rare earth
enriched layer is 4 to 7 metres thick beneath 2 to 5 metres of clay and soil, which is
considered ideal for restoring any mined areas to other productive land uses. A resource
update is in progress and is planned to be announced soon.
Exploration licence application EL25/2022 covering the 16 km extension from Deep Leads /
Rubble Mound to the Wind Break REE discovery area is in progress.
Ongoing discussions with several potential customers continued to endorse the ABx strategy
of producing a mixed rare earth carbonate (MREC) for sale to a separation plant. The
discussions highlighted the acute supply risks for dysprosium and terbium in particular.
1
ASX announcement, 22 January 2024
ASX announcement, 13 March 2024
3
ASX announcement, 27 March 2024
2
2
Quarterly report to 31 March 2024
Rare Earths Strategy
Rare earths have many applications in a wide variety of industries. Permanent magnets are the
most valuable application, representing over 90% of the total value of rare earths demand.
Permanent magnets are used in electric vehicles, wind turbines, smartphones and military
applications. The four most important rare earths for permanent magnets are neodymium,
praseodymium, dysprosium and terbium. The demand for these four rare earths is predicted to
grow significantly in coming years, potentially leading to significant supply shortfalls. The supply
risk is highest for dysprosium and terbium, the two heavy rare earths in permanent magnets.
Globally, most rare earths are sourced from mineral deposits. These typically require large,
costly processing plants and a significant lead time to reach production.
An alternative source of rare earths is clay-hosted deposits. These typically contain a mixture of
ionic adsorption clay (IAC, the ionic component) and a non-ionic component, and the relative
proportions of each in different deposits varies enormously. The rare earths in the ionic
component can be extracted using a low-cost desorption process, which produces a solution
contain rare earths that is subsequently precipitated into a mixed rare earth carbonate (MREC).
Industry processing experts indicate that it is very difficult to economically extract rare earths
from the non-ionic component. Thus it is critical to have a high ionic proportion.
The other major advantages of ionic adsorption clay deposits are:
Higher proportion of heavy rare earths compared to mineral deposits
Low concentrations of radioactive elements such as uranium and thorium
Typically exist at shallow depth
These advantages mean that:
The minimum viable project for an ionic adsorption clay project is typically significantly
smaller than for a mineral project. Crucially, this means that considerably less capital,
time and risk is typically required to deliver a cash-flow positive ionic adsorption clay
project compared to a mineral project
The basket price for a concentrate from an ionic adsorption clay deposit is typically higher
than one from a mineral deposit.
Ionic adsorption clay deposits have historically been mined only in southern China.
ABx is the first company to discover rare earths in Tasmania (Figure 1) and has reported a JORCcompliant mineral resource of 52 million tonnes4 at its Deep Leads / Rubble Mound project.5 The
resource has the highest proportion of dysprosium and terbium (Dy+Tb is 4.4% of TREO) of any
clay-hosted rare earths resource in Australia, contributing to a higher basket price. Furthermore,
the level of radioactive elements is very low (2 ppm U2O3 and 6 ppm ThO).
4
5
45 Mt inferred and 7 Mt indicated
ASX announcement, 20 November 2023
3
Quarterly report to 31 March 2024
ABx engaged Australian Nuclear Science and Technology Organisation (ANSTO) to conduct
desorption tests, which found the highest extractions under relatively neutral conditions
reported from any clay-hosted resource in Australia6,7, which means it has the highest ionic
proportion of any clay-hosted resource in Australia.
These factors put ABx at the forefront for customers and countries seeking to diversify rare
earths supply.
The ABx strategy is to produce a mixed rare earth carbonate that can be sold to rare earth
separation plants, which produces separated rare earth oxides. The ABx mixed rare earth
carbonate will be high in heavy rare earths and low in radioactive elements, which is expected
to be attractive to many prospective customers. Market discussions with several potential
customers endorse this strategy.
During 2024, ABx is continuing its exploration program, and will be conducting further
metallurgical studies.
Figure 1: ABx leases in the 52 km wide REE province in northern Tasmania.
6
7
ASX announcement, 31 May 2022
ASX announcement, 2 February 2023
4
Quarterly report to 31 March 2024
ALCORE: positive results from bath pilot batch reactor
Rigorous investigation of process conditions continued using the bath pilot batch reactor,
which had been commissioned in October 2023.8 This reactor is approximately ten times
larger than the Company’s previous laboratory-scale reactor.
The target fluorine recovery is 90%. Results from the first three runs, conducted in late
2023, showed that 70% fluorine recovery could be consistently achieved.9 It was judged
that the primary cause of the lower than target recovery was large particles of bath, as
larger particles will react much slower in the reactor.
ALCORE had anticipated this issue and had ordered a ball mill and ultrasonic vibrating
screen in October 2023, to enable bath to be prepared with a narrower range of particle
sizes. These were received in January.
With this improved bath preparation capability, ALCORE conducted three further runs
since late January.10 The assay results from these runs indicated significant impacts of
feed particle sizes on fluorine recovery, with a maximum of 80% being achieved from a
single process stage using the bath pilot batch reactor alone.
A rigorous analysis of the results suggests that a second stage process, using a different
reactor configuration, will be required to further increase the fluorine recovery to over
the 90% target. This possibility has been anticipated for some time and has been
incorporated into the design of the continuous pilot plant, as some existing analogous
commercial processes involve two stages.
Initial investigations, involving further manual processing of some product material from
these recent runs in a separate furnace, achieved a maximum of 88% fluorine recovery.
These manual tests provide confidence that the 90% target can be reached at commercial
scale, and also provide direction for design optimisation of the second stage reactor.
In addition, separate pilot batch reactor runs were conducted at various temperatures to
investigate the effect of temperature on fluorine recovery. This exploration will assist to
identify the feasible range of process temperatures for future continuous pilot process
operation.
Commercial discussions continued with potential strategic investors and have included
the possibility of locating the continuous pilot plant at an alternative, superior site,
instead of the ALCORE Technology Centre on the NSW Central Coast. Ordering of
continuous pilot plant reactors is being deferred until those commercial discussions are
finalised.
8
ASX announcement, 8 November 2023
ASX announcement, 20 February 2024
10
ASX announcement, 4 April 2024
9
5
Quarterly report to 31 March 2024
ALCORE Strategy
Hydrogen fluoride is an essential chemical for the production of fluorocarbons and
aluminium fluoride. Aluminium fluoride is an essential chemical for aluminium metal
production. Fluorine was added to Australia’s critical minerals list in 2023.
Hydrogen fluoride is mainly produced from fluorspar, which is obtained from the mineral
fluorite. Fluorspar is relatively high cost and has been identified as a critical material by the
USA, Europe, Japan and Canada.
Australia does not mine any fluorite, or produce any fluorspar, hydrogen fluoride or
aluminium fluoride, and so must import all its requirements. The Australian demand for
hydrogen fluoride is small, and it is imported at high cost. Conversely, Australia is a
significant producer of aluminium and so its demand for aluminium fluoride is high.
Australia is the largest producer of primary aluminium metal without its own domestic
aluminium fluoride production, so Australian aluminium smelters rely entirely on imported
aluminium fluoride, typically more than 80% from China. The median aluminium fluoride
price (FOB China) for the last two years is over US$1,400/t (Figure 2).
Most modern aluminium smelters produce excess bath, for which the only meaningful
market is new smelters, which require bath to commence operations. Aluminium industry
forecasts suggest that the global bath market will increasingly be in surplus, because far
fewer new smelters are being constructed. All of the major global aluminium producers are
eager for alternative applications for excess bath, to avoid the unpalatable options of on-site
storage or landfill.
ALCORE has developed a world-first process to recover hydrogen fluoride from aluminium
smelter bath. This is combined with aluminium hydroxide to produce aluminium fluoride.
The combined approach is illustrated in Figure 3. ALCORE is also investigating the use of
dross (another aluminium smelter waste) and bauxite as alternatives to aluminium
hydroxide as the source of aluminium. The use of dross or bauxite would further lower the
production cost.
ALCORE intends to construct commercial hydrogen fluoride and aluminium fluoride plants
in Bell Bay, Tasmania. The aluminium source for the initial aluminium fluoride production is
likely to be aluminium hydroxide, as this is lower risk and allows a faster path to production.
Subsequent production may use aluminium from dross or bauxite to further improve the
financial and environmental outcomes.
The initial plant is proposed to transform 1,600 tonnes per year of aluminium smelter bath
into hydrogen fluoride and other industrial chemicals. A proportion of the hydrogen fluoride
will be further processed to aluminium fluoride. The relative amounts of hydrogen fluoride
and aluminium fluoride produced can be optimised to suit market demand. In 2022, ALCORE
received a $7.6 million grant from the Australian Government’s Modern Manufacturing
Initiative (MMI) to support this plant. ALCORE is matching grant funding dollar-for-dollar for
the project.
6
Quarterly report to 31 March 2024
ALCORE’S longer term plan is to expand the plant by 15 times, which will process all of
Australia’s aluminium smelter bath and supply more than 80% of Australia’s aluminium
fluoride requirements.
Figure 2: Aluminium fluoride monthly prices FOB China (source: China Customs Statistics)
Figure 3: Circular economy approach of recycling aluminium smelter bath into aluminium fluoride
7
Quarterly report to 31 March 2024
Bauxite Operations
Sunrise Bauxite Project: Binjour, Queensland
Remodelling of the Binjour mine plan was completed to further enhance functionality
and maximise operational efficiencies.
Negotiations are continuing with multiple offtake partners for potential long term supply
contracts.
The MOU for the planned infrastructure site at the Port of Bundaberg has been extended
for a further 12 months.
DL130 Bauxite Project: Tasmania
We continue to progress the mine lease application through the EPA, council and Mineral
Resources Tasmania approval processes.
Bauxite Strategy
The ABx strategy is to selectively produce metallurgical grade, cement grade and fertiliser
grade bauxite, with a focus on profitability. ABx bauxite can substantially improve the
properties of superphosphate fertiliser.
The largest project is Binjour, with a JORC compliant resource of 37 million tonnes,
supporting 20-25 years production. In February 2022, ABx entered a JV with Alumin for the
development of the Sunrise Bauxite Project, comprising a bauxite mine at Binjour plateau
and port operations at Bundaberg in Queensland11. Alumin is an Australian special purpose
vehicle company associated with our strategic marketing partner, Rawmin India, having
extensive experience in funding long term sustainable investments in projects involving
mining and bulk-shipping of metallurgical grade bauxite to end users around the world.
It is anticipated that the mine at Binjour will export 500,000 tonnes per year of metallurgical
grade bauxite in its first year of production, then scale up to full operational capacity of 1.5
million tonnes per year. ABx has reforecast its timeline to begin exporting of product in H2
2025.
In Tasmania, ABx has three bauxite deposits and has previously mined at Bald Hill near
Campbell Town. ABx plans to recommence bauxite mining in Tasmania by Q3 2024, at the
DL130 Bauxite Project. The primary products are likely to be cement grade and fertiliser
grade bauxite.
An updated company presentation has been placed on the ABx website
www.abxgroup.com.au.
This announcement is approved for release by the board of directors.
11
ASX Announcement 28 February 2022
8
Quarterly report to 31 March 2024
For further information please contact:
Dr Mark Cooksey
MD & CEO
ABx Group
+61 447 201 536
mcooksey@abxgroup.com.au
www.abxgroup.com.au
Media
Chapter One Advisors
David Tasker / Alex Baker
+61 433 112 936 / +61 432 801 745
dtasker@chapteroneadvisors.com.au /
abaker@chapteroneadvisors.com.au
9
Quarterly report to 31 March 2024
Qualifying statements
General: The information in this report that relate to Exploration Information and Mineral Resources are based on
information compiled by Jacob Rebek and Ian Levy who are members of The Australasian Institute of Mining and
Metallurgy and the Australian Institute of Geoscientists. Mr Rebek and Mr Levy are qualified geologists and Mr Levy is
a director of ABx Group Limited.
Mainland: The information relating to Mineral Resources on the Mainland was prepared and first disclosed under the
JORC Code 2004. It has not been updated since to comply with the JORC Code 2012 on the basis that the information
has not materially changed since it was last reported. Mr Rebek and Mr Levy have sufficient experience, which is relevant
to the style of mineralisation and type of deposit under consideration and to the activity, which they are undertaking to
qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of exploration Results,
Mineral Resources and Ore Reserves. Mr Rebek and Mr Levy have consented in writing to the inclusion in this report of
the Exploration Information in the form and context in which it appears.
Tasmania: The information relating to Exploration Information and Mineral Resources in Tasmania has been prepared
or updated under the JORC Code 2012. Mr Rebek and Mr Levy have sufficient experience, which is relevant to the style
of mineralisation and type of deposit under consideration and to the activity, which they are undertaking to qualify as
a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves. Mr Rebek and Mr Levy have consented in writing to the inclusion in this report
of the Exploration Information in the form and context in which it appears.
The information relating to the latest REE Resources update is extracted from the report entitled “ABx Rare Earth
Resources Exceed 50 Million Tonnes” dated 20 November 2023 and is available to view on
https://www.abxgroup.com.au/site/investor-information/asx-announcements (2023).
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the company’s market announcements and, in the case of estimates of Mineral Resources or Ore Reserves,
that all material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed.
The Company also confirms that the form and context in which the Competent Person’s findings are presented have
not been materially modified from the original market announcements.
Disclaimer Regarding Forward Looking Statements
This ASX announcement (Announcement) contains various forward-looking statements. All statements other than
statements of historical fact are forward-looking statements. Forward-looking statements are inherently subject to
uncertainties in that they may be affected by a variety of known and unknown risks, variables and factors which could
cause actual values or results, performance or achievements to differ materially from the expectations described in
such forward-looking statements.
ABx does not give any assurance that the anticipated results, performance or achievements expressed or implied in
those forward-looking statements will be achieved.
Patent
Refined Ore Industries Ltd (ROIL) was the owner of the CORE process technology via ROIL’s intellectual property
company, Berkeley Process Technologies Pty. Ltd which issued a global exclusive licence for the aluminium-related
portion of the CORE process technology to ABx in November 2017 and ABx has issued a global exclusive sub-licence
to ALCORE when ALCORE was incorporated on 1 July 2018.
After a company restructure and expansion of the patent definition to cover isolation and extraction of mineral
compounds, metals, metalloids, alloys and elements from waste streams, mineral ores, recyclable commodities,
industrial by-products and mixed substances, the holding company is now named Core Refining Limited (CRL) and the
intellectual property company is Core Intelligence Australia Pty Ltd (CIAL) which holds the Patent Application No.
2019904311 and the global exclusive licences to ABx and ALCORE continue in force.
CRL’s CORE process technology involves the refining of a wide range of ore types using a combination of fluorine acids
and related thermal energy process steps. The technology that is licensed to ABx and ALCORE by CRL is part of CRL’s
broader Core technology.
10
Quarterly report to 31 March 2024
Table 1: Tenement information required under LR 5.3.3
Tenement No.
Location
New South Wales
EL 9593
Taralga
ELA 6650
Penrose Quarry – granted
March 2024 (not yet have
EL number)
Queensland
Tasmania
EL 7/2010
Conara
EL 9/2010
Deloraine
EL 18/2014
Prosser’s Road
EL 10/2021
Rubble Mound
EL 27/2022
Temple Bar
EL 28/2022
Triangle Flats
MLA 100277
Sunrise ML application
Notes: No tenements were relinquished or granted during the
quarter.
EPM 27787
Binjour
ML 80126
Toondoon ML
All tenements are in good standing, 100% owned and not subject
to any third-party royalties nor are they encumbered in any way.
Information required under Listing Rule 5.3.1: Exploration expenditure reported during the quarter related to
the REE program development ($484,000), research conducted by ALCORE with respect to its reported advancements
($174,000).
Information required under Listing Rule 5.3.2: No mining production was conducted during the quarter.
Information required under Listing Rule 5.3.5: The payments of $62,000 as disclosed in section 6.1 of the
Appendix 5B relates to payment towards Directors fee and salaries during the quarter.
11
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
ABx Group Limited
ABN
Quarter ended (“current quarter”)
14 139 494 885
31 March 2024
Consolidated statement of cash flows
Current quarter
$A’000
Year to date (3
months)
$A’000
65
65
(a) exploration & evaluation
-
-
(b) research & development
(174)
(174)
(c) production
-
-
(d) staff costs
(105)
(105)
(e) administration and corporate costs
(184)
(184)
-
-
52
52
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(346)
(346)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(b) tenements
-
-
(c) property, plant and equipment
-
-
(484)
(484)
(e) investments
-
-
(f)
-
-
(a) entities
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Proceeds from the disposal of:
Current quarter
$A’000
Year to date (3
months)
$A’000
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
310
310
(a) entities
(e) other non-current assets
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(174)
(174)
616
616
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(73)
(73)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
543
543
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
336*
336*
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(346)
(346)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(174)
(174)
543
543
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
Current quarter
$A’000
Year to date (3
months)
$A’000
-
-
359
359
* Cash and cash equivalents at the beginning of the period has been updated in accordance with the
audited consolidated financial statements of ABx Group Limited for the year ended 31 December 2023.
The addition to the cash and cash equivalent of $359k, the company has access to $5.21 million as held
in trust as at 31 March 2024.
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
319
296
5.2
Call deposits
40
40
5.3
Bank overdrafts
-
-
5.4
Other
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
359**
336**
** Reconciliation of cash and cash equivalents of previous quarter has been updated in accordance with
the audited consolidated financial statements of ABx Group Limited for the year ended 31 December
2023. As at 31 March 2024 The addition to the cash and cash equivalent of $359k (31 December 2023:
$ 336k), the company has access to $5.21 million (31 December 2023: $ 5.52 million) as held in trust
as at 31 March 2024.
6.
Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
62
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(346)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(484)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(830)
8.4
Cash and cash equivalents at quarter end (item 4.6)
359
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
359
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
0.43
-
$A’000
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: Yes. As at 31 March 2024, in addition to the cash and cash equivalent of $359k,
the company has access to $5.21 million as held in trust.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: ABx is in ongoing discussions with potential strategic investors, which are highly
prospective.
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Yes, the entity expects to be able to continue to meet its operations and meet its
business objectives as a result of the actions contemplated in items 8.8.1 and 8.8.2
above.
Note: where item 8.7 is less than