Material to be Delivered at Annual General Meeting
Released
Released
Announcement PDF
ASX Announcement
31 May 2023
ASX: ABX
Material to be Delivered at Annual General Meeting
31 May 2023 – 11:00 am Sydney Time
ABx Group (ASX: ABX) (“ABx” or “the Company”) provides the attached material in compliance
with Listing Rule 13.13.3.
Documents Attached
•
Chairman’s address
•
Director Presentation – Ionic Adsorption Clay Rare Earth Deposits in Tasmania
•
Managing Director and CEO Presentation – Aluminium Fluoride Recycled from
Industrial Waste
Paul Lennon, Chairman of ABx opens his address by saying, "ABx Group is driven to deliver
projects with substantial commercial upside while also making a significant, positive ESG
contribution. This strategy sits at the heart of everything we do. I think it is instructive to
discuss the Company’s overall strategy and why your board sees so much exciting potential."
Meeting Notes
1. If you wish to attend the virtual AGM which starts at 11:00 am, 31 May 2023, you must
register at:
https://us02web.zoom.us/meeting/register/tZAlfu-vpzssEtd6a3-jve1ScyQtRWOnR5AO
You will then be sent a link to the meeting webcast;
2. We will provide an opportunity to ask questions at the meeting however there may be
connectivity and other issues during the video conference. Therefore, we recommend
that any questions concerning the business of the meeting are submitted during
registration or corporate@abxgroup.com.au in advance of the meeting;
3. Please mute your microphone unless you wish to ask a question; and
4. All resolutions will be determined by way of a poll. The poll will be conducted based on
votes submitted by proxy and by Shareholders at the meeting.
ASX Release authorised by Mark Cooksey, Managing Director and CEO.
For further information please contact:
Dr Mark Cooksey
CEO
ABx Group
Mobile: +61 447 201 536
Email: mcooksey@abxgroup.com.au
Website: abxgroup.com.au
ABx Group Limited
Level 5 52 Phillip Street Sydney NSW 2000
ABN 14 139 494 885
P: +61 2 9251 7177
F: +61 2 9251 7500
ASX release 31 May 2023
page 2
CHAIRMAN’S REVIEW OF 2022 DEVELOPMENTS
ABx Group is driven to deliver projects with substantial commercial upside while also making a significant,
positive ESG contribution. This strategy sits at the heart of everything we do. I think it is instructive to discuss
the Company’s overall strategy and why your board sees so much exciting potential.
At Alcore, the business is developing industry-leading technology that processes aluminium smelter waste,
known as ’excess bath’, into high-value products such as aluminium fluoride. The only meaningful market for
excess bath is new smelters, which require bath to commence operations. Aluminium industry forecasts
suggest the global bath market will increasingly be in surplus, because far fewer new smelters are being
constructed. All of the major global aluminium producers are eager for alternative applications for excess
bath, to avoid the unpalatable options of on-site storage or landfill. Alcore has the potential to be the missing
piece of this puzzle.
I mentioned ABx is not just focussed on ESG contributions, it is also dedicated to delivering financial returns.
For Alcore, the aluminium fluoride market is very favourable with 1.2 million tonnes produced per annum,
valued at US$1.5 billion. With a sizable addressable market, the next critical task for Alcore is to firmly
understand the process performance at larger scale. This is why the pilot plant is so important. Its completion
will provide valuable engineering data and better indications of capital and operating costs, ahead of a fullscale commercial facility. The pilot plant is expected to be completed in 2023 and I urge all shareholders to
watch this story closely.
Meanwhile, the developments at our Deep Leads – Rubble Mound rare earths deposit are also closely aligned
with our strategy. In November, ABx defined a maiden JORC compliant rare earths resource which provided
an initial indication of the potential size and scope of our deposit. Since then, ABx has had the rig turning
almost non-stop with plenty of targets to further expand the channel. We recently announced an upgrade to
21 million tonnes.
Looking deeper into the total rare earth oxide (TREO) grades, Deep Leads’ mineralisation is relatively rich in
heavy rare earths, like dysprosium and terbium. These, along with neodymium and praseodymium, are used
in permanent magnet technologies and are in high demand, fetching higher prices. There is a major financial
and ESG opportunity to be realised at the project – and this is before we even consider that the
mineralisation style is an ionic adsorption clay (IAC).
Not all clays are created equal and, in ABx’s case, its ionic adsorption clay is very special. At Deep Leads we
are seeing rare earths attached (‘adsorbed’) to the surface of clay particles. Why is this important? The
Australian Nuclear Science and Technology Organisation (ANSTO) have run desorption tests, where the rare
earths are extracted from the clay into a solution. This process achieves high rare earth recoveries using a
relatively benign salt solution with a pH of 4, which is less acidic than apple juice. This compares favourably to
many other rare earth deposits, which need more aggressive and expensive acid processing. Due to this
unique mineralisation, the potential for low-cost rare earths production at Deep Leads is phenomenal.
Finally, ABx Group continues to pursue the excellent potential at its bauxite projects in Queensland and
Tasmania. These projects offer fantastic opportunity to advance towards the production phase. Our previous
bauxite mining operations were conducted in close conjunction with the landholders, establishing a
reputation for quality environmental management. I see no reason why ABx cannot continue to maintain this
reputation into the future.
When looking at the strategy which ABx is pursuing and the track record of execution, I am exceptionally
proud of the work completed to date and an excited for what the future may bring.
Thank you again to all shareholders and I look forward to updating you all on future progress.
Paul Lennon
Chairman
Level 5 52 Phillip St
Sydney 2000
ASX : ABX
ABx’s ionic adsorption clay
rare earth deposits in Tasmania,
Australia
Ian Levy, Director
+61 407 189 122 ilevy@abxgroup.com.au
31 May 2023
ABx discoveries
Qualifying statements
Disclaimer Regarding Forward Looking Statements
This ASX announcement (Announcement) contains various forward-looking statements. All statements other than statements of
historical fact are forward-looking statements. Forward-looking statements are inherently subject to uncertainties in that they may be
affected by a variety of known and unknown risks, variables and factors which could cause actual values or results, performance, or
achievements to differ materially from the expectations described in such forward-looking statements.
ABx does not give any assurance that the anticipated results, performance, or achievements expressed or implied in those forwardlooking statements will be achieved.
General
The information in this report that relate to Exploration Information and Mineral Resources are based on information compiled by Ian
Levy who is a member of The Australasian Institute of Mining and Metallurgy and the Australian Institute of Geoscientists. Mr Levy is a
qualified geologists and a director of ABx Group Limited.
Mr Levy has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity, which they are undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for
Reporting of exploration Results, Mineral Resources and Ore Reserves. Mr Levy has consented in writing to the inclusion in this report of
the Exploration Information in the form and context in which it appears.
ABx rare earth discoveries in Tasmania contain the most critical REEs
❑ True ionic adsorption clay IAC REE deposits * **
❖ Rich in critical permanent magnet REEs
❖ Highest proportion of important REEs Dy & Tb
❖ Can be developed quickly at low cost
❖ Located in easily accessible pine plantations
❑ Shallow 5m from surface, 6 to 8m thick REE zone
New enlarged
target area
ABx
ELA
❑ Testing by ANSTO confirmed IAC REE type **
❑ Deep Leads & Rubble Mound have joined
❑ Extension to Wind Break REE next step
❑ Resources exceeded 20M tonnes** in 12 months
15km
* Only ionic adsorption clay REE deposits (IAC REE) achieve high extraction rates at low cost, delivering extraction rates of 50% to
75% of REE using benign, low-cost processing. ABx has discovered the only true IAC REE deposit in Australia, in Tasmania.
** See ASX announcements dated 8 May 2023 (resource update) & 31 May 2022 (ANSTO tests confirm high ionic extraction rates)
3
ABx rare earth resources exceed 20Mt*
* See ASX release 8 May 2023
Permanent Magnet REOs
TREO- Perm
ThickTREO
Nd2O3 Pr6O11 Tb4O7 Dy 2O3 CeO2 Er2O3 Eu2O3 Gd2O3 Ho2O3 La2O3 Lu2O3 Sm2O3 Tm2O3 Yb2O3 Y2O3
ness
CeO2 Mag
ppm
ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm
(m)
ppm ppm
Inferred
17
5
12
6.7 746 565 192 128
32
4.4
27 181 15
7.8
29
5.4 111 2.0
29
2.2
13 159
Indicated
4
4
17 12.5 880 677 216 142
35
5.5
33 203 19
9.3
35
6.6 128 2.3
33
2.5
15 210
Total
21
5
13
7.7 770 585 196 130
33
4.6
28 185 16
8.1
30
5.6 114 2.1
29
2.2
14 168
Parameters Cut-off grade = 250ppm TREO-CeO2 Minimum thickness = 2 metres Maximum extrapolation = 80 metres Density = 1.9 tonnes/cubic metre
TREO = total rare earth elements as oxides. TREO-CeO2 = TREO minus cerium oxide
Resource Million From To
Category Tonnes (m) (m)
From less than 20% of 36 km2 target area at Deep Leads-Rubble Mound
High extraction rates 30% to 83% in ANSTO desorption tests
GOOD MIX OF REE
❖ High content of permanent magnet REEs (Nd, Pr, Tb & Dy)
❖ Very high proportions of Dy & Tb (4.6% of Total Rare Earths)
❖ Non-radioactive: Free of Uranium & Thorium. :. Easily traded
Deep Leads–Rubble Mound (1st project)
11m @ 1,700ppm TREO*
Hole RM302
4,444 max TREO
REE prospect is significantly enlarged to NE
• Current REE drilling target is 6.5km x 7km = 36km2
• ABx has a lease application to cover gap to Wind Break
• NE holes high grade REE include 11m @ 4,400ppm TREO*
Results
pending
High grades*
• New drilling target to Wind Break exceeds 100km2
Thicker mineralisation identified
• Thick REE zones discovered up to 30m thick
• Economic assessment of thickened zones begun
• Overburden depth averages 5m
• REE horizon averages 7.7m thickness
= shallow orebody, easily developed
* See Qualifying statements & Appendix JORC information
2km
Deep Leads–Rubble Mound business concepts (for minimum exploration targets)
Mine
Concentrate
• Dredge & pump
• Hydraulic mine &
slurry
• Simple, lowcost leachate
• Clay only?
• Dig & truck?
• Tank leach
• In-situ leaching
may be possible?
• Vat leach
• Heap leach?
Sell bulk REE
concentrates to
downstream
processors
Australia or
overseas
Rehabilitate
Improve
• Water treated
• Contour land
• Clays dewatered
• Infrastructure
• Reinstated to
usable land
• Better drainage
• Replanting
• Pasture,
plantations,
offsets, forests?
Concentrate project achieves ~50% of the revenue for ~25% of the costs
Fastest, lowest-cost start-up
Deep Leads – Rubble Mound Land-Use Setting
Open land on recently
harvested hardwood
plantations and farmland
Supportive landholders
Forico-Mitsui plantations
Good access on highway and
all-weather logging roads
Appendix: All assay results for hole RM302 highlighted on slide 5
Permanent Magnet REOs
Hole RM302 assays
TREO- Perm Dy+TB
ThickFrom To
TREO
Nd2O3 Pr6O11 Tb4O7 Dy 2O3 CeO2 Er2O3 Eu2O3 Gd2O Ho2O3 La2O3 Lu2O3 Sm2O Tm2O Yb2O3 Y2O3
ness
CeO2 Mag TREO
(m) (m)
ppm
ppm ppm ppm ppm ppm ppm ppm 3 ppm ppm ppm ppm 3 ppm 3 ppm ppm ppm
(m)
%
ppm ppm
2
3
4
5
6
7
8
9
10
11
12
3
4
5
6
7
8
9
10
11
12
13
1
1
1
1
1
1
1
1
1
1
1
724 300
1,648 628
2,932 1,660
1,222 805
1,723 1,422
4,444 4,014
3,269 2,893
1,408 1,219
640 540
421 348
453 375
104
245
773
334
460
902
742
320
150
95
103
2
13
11
1,717 1,291 385
2.4%
2.1%
2.5%
3.4%
5.7%
6.3%
5.7%
5.3%
4.9%
4.9%
4.8%
4.7%
70
167
545
230
286
496
442
195
95
59
65
17
43
155
63
76
124
112
50
24
15
16
2.3
4.7
11.0
5.5
12.9
36.2
24.7
10.0
4.2
2.6
2.9
15
424
9
31 1,020 18
63 1,271 30
36
416
19
85
301
47
246 430 153
162 376
98
65
189
39
27
100
15
18
73
11
19
77
12
3.6
9.0
24.5
11.4
19.0
41.3
30.6
13.3
5.7
3.6
3.8
13
28
67
33
69
197
140
57
26
16
18
3.0
5.7
10.8
6.3
16.5
53.0
34.7
13.8
5.7
3.7
4.1
60
128
378
176
232
452
446
212
107
61
68
1.4
2.4
4.1
2.9
5.9
17.7
11.7
4.7
2.1
1.4
1.5
16
38
118
54
72
146
113
47
23
15
16
1.3
2.6
4.6
3.0
7.0
20.3
13.6
5.4
2.3
1.5
1.6
9
78
19
133
33
218
21
144
46
448
121 1,911
82 1,182
33
474
14
189
10
131
10
137
241
63
10.6
70
15.1
60
14.3
211
5.1
60
5.7
36
Hole location
Hole ID
RM302
Northing
5412740
Easting
481722
Latitude Longitude Elevation GPS
-41.4367 146.7812
230
425
41
459
Appendix: Summary of exploration results information in accordance
with LR 5.8.1
Geology and geological interpretation
Clay layers overlying Jurassic age dolerite basement
and an area with Tertiary age alkali basalt, Jurassic
age tholeiitic dolerite and Tertiary age bauxitelaterite are the main geological units. Paleochannels
host thicker clay zones which host the rare earth
element mineralisation.
Sampling and sub-sampling techniques
Sampling was at 1 metre intervals. Subsampling for
assaying is by quartering the clay samples twice and
each time, mixing diagonally opposite quarters.
Assay results from resampling corresponded
satisfactorily.
RC aircore and push-tube coring used.
Drilling techniques
Sample analytical method
Assay samples are analysed by standard NATA-approved
induction coupled plasma analytical methods for rare
earth elements at ALS labs in Brisbane (method ME-MS81)
and at LabWest in Perth (method MMA04). Interlab
comparisons proved satisfactory.
APPENDIX : JORC Code, 2012 Edition – Table 1 report
APPENDIX : JORC Code, 2012 Edition – Table 1 report (continued)
APPENDIX : JORC Code, 2012 Edition – Table 1 report (concluded)
For JORC Code information relating to resource estimation, refer ASX Announcement 8 May 2023
(ASX:ABX)
Aluminium fluoride recycled
from industrial waste
31 May 2023
Page 1
Aluminium fluoride from aluminium smelter waste
Aluminium fluoride (AlF3): essential for aluminium smelting
•
1.2 million tonnes produced globally per year worth US$1.5
billion (US$1,000-1,800 per tonne)
•
50% produced in China, mainly for Chinese smelters
•
Australia imports 100% of requirements, mostly from China
• Traditionally produced
from high-cost aluminium
hydroxide and fluorspar
• Achievable specification –
product purity risk is low
• Mature market – dozens
of customers globally
‘Tapped bath’: an aluminium smelter waste
Aluminium fluoride
Current imports/exports
Tapped bath
•
Fluorine is lost from smelter in ‘tapped bath’
•
Only attractive market is new smelter construction; none
in Australia
•
Global market for tapped bath has moved into oversupply
•
Tapped bath is a low-cost source of fluorine
2
Process to produce aluminium fluoride
• Exemplary illustration of
circular economy
• ABx’s 83%-owned refining technology subsidiary
• Developing processes to produce aluminium
fluoride using:
• Fluorine from tapped bath (an aluminium
smelter waste)
• Aluminium from dross (an aluminium smelter
waste) or bauxite
3
Process economics
• Based on long term aluminium fluoride prices and exchange rates, and estimated costs
• For 20,000 t/y aluminium fluoride
• Attractive margins under all scenarios
Operating Operating
EBITDA*
cost
margin*
(A$m)
(A$/t AlF3) (A$/t AlF3)
$1,250
$730
$15m
Aluminium source
Scenario
AlF3 price
FX rate
AlF3 price
(US$/t)
USD:AUD
(A$/t)
Aluminium hydroxide
Baseline
$1,220
0.75
$1,630
Dross
Baseline
$1,220
0.75
$1,630
$1,050
$930
$19m
Aluminium hydroxide
Optimistic
$1,400
0.70
$2,000
$930
$1,450
$29m
Dross
Optimistic
$1,400
0.70
$2,000
$770
$1,600
$32m
*Includes revenue from co-products
4
Technical progress
• Critical processing steps have been demonstrated in laboratory
• Initial operating conditions for the pilot plant reactor have been selected1
• Basic engineering design for pilot plant reactor completed, and detailed design being finalised
Bath lab reactor MkI for
recovery of fluorine from
aluminium smelter bath
AlF3 imports
from China to
Australasia fell
by more than
60% in 2021
Oleum lab reactor
5
Process scale-up
• Rigorous scale-up to reduce technical risk
• First aluminium fluoride plant planned for Bell Bay,
Tasmania, near existing hydro-powered aluminium
smelter. Planned production 20,000 t/y
• High potential for plants in other major aluminium
smelting regions
• Potential expansion into other markets, including
fluorine chemicals
aborator
h bath
ilot
h bath
m
2019-22
2022-24
ommer ial
ta e
h bath
t AlF
Tasmania
m
ommer ial
ta e
h bath
t AlF
Tasmania
m
2024-
$7.5m grant awarded2 and $3.3m instalment received3
6
Technical plan
Reactor
Purpose
Commissioning
Bath lab
reactor MkII
• Confirm preferred reactor design
• Demonstrate that can achieve high
fluorine yield from bath
• Produce metal sulfate residue
suitable for further process
development
August 2023
Bath pilot
plant reactor
• Demonstrate quality of hydrogen
fluoride produced at pilot scale
• Determine design and operating
parameters for commercial plant
Early 2024
Illustrative
images
7
ABx Group Limited
L5 52 Phillip Street
Sydney 2000
Australia
Phone: +61 2 9251 7177
E: corporate@abxgroup.com.au
Mark Cooksey
Managing Director and CEO
E: mcooksey@abxgroup.com.au
Reference Information
Page 9 9
References
1ASX release 24 October 2022
2ASX release 29 April 2022
3ASX release 18 Jan 2023
Share your feedback
Discover