Half Yearly Report and Accounts
Released
Released
Announcement PDF
Half-Yearly Financial Report
For the half year ended 30 June 2023
ASX:ABX
Interim Financial Report
for the half‐year ended 30 June 2023
Table of Contents
Page
CORPORATE DIRECTORY
3
REVIEW OF OPERATIONS
4
DIRECTORS’ REPORT
13
AUDITOR’S INDEPENDENCE DECLARATION
16
INDEPENDENT AUDITOR’S REVIEW REPORT
17
DECLARATION BY DIRECTORS
19
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND
OTHER COMPREHENSIVE INCOME
20
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
21
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
22
CONSOLIDATED STATEMENT OF CASH FLOW
23
NOTES TO THE FINANCIAL STATEMENTS
24
This interim financial report does not include all the notes of the type normally included in an annual
financial report. Accordingly, this report is to be read in conjunction with the annual report for the
year ended 31 December 2022 and any public announcements made by ABx Group Limited during the
interim reporting period in accordance with the continuous disclosure requirements of the Corporations Act
2001.
Interim Financial Report for the Half-Year Ended 30 June 2023
Page | 2
ABx Group Limited and Controlled Entities
ACN 139 494 885
CORPORATE DIRECTORY
ABx Group Limited
Registered and Corporate Office
Directors
Paul Lennon (Non-Executive Chairman)
Dr Mark Cooksey (Executive Director
and Chief Executive Officer)
Ian Levy (Non-Executive Director)
Ken Boundy (Non-Executive Director)
Level 5
52 Phillip Street
Sydney NSW 2000
Company Secretary
ACN 139 494 885
ABN 14 139 494 885
Telephone:
Fax:
+61 2 9251 7177
+61 2 9251 7500
Email:
Website:
corporate@abxgroup.com.au
www.abxgroup.com.au
Henry Kinstlinger
Auditor
Share Registry
K.S. Black & Co
Level 1
251 Elizabeth Street
Sydney NSW 2000
Telephone: +61 2 8839 3000
Computershare Investor Services Pty Limited
Level 3
60 Carrington Street
Sydney NSW 2000, Australia
Telephone: 1300 327 328 (within Australia)
Lawyers
Piper Alderman
Level 23, Governor Macquarie Tower
1 Farrer Place
Sydney NSW 2000
Telephone: +61 2 9253 9999
Bankers
ASX Code – ABX
Australia & New Zealand Banking Group Limited
20 Martin Place
Sydney NSW 2000
Telephone: +61 2 9227 1818
St George Bank Limited
Level 14, 182 George St
Sydney NSW 2200
Telephone: +61 2 9236 2230
ABx Group Limited shares are listed on the
Australian Securities Exchange.
This financial report covers the Consolidated Entity
consisting ABx Group Limited and its controlled
entities.
ABx Group Limited is a company limited by shares,
incorporated and domiciled in Australia.
Interim Financial Report for the Half-Year Ended 30 June 2023
Page | 3
ABx Group Limited and Controlled Entities
ACN 139 494 885
REVIEW OF OPERATIONS
Highlights
Rare earths (ionic adsorption clay resource in Tasmania)
Resource increased five-fold to 21 million tonnes averaging 770 ppm TREO and 585 ppm TREO-CeO2 at a cutoff grade of 250 ppm TREO-CeO2. Post 30 June 2023, resource further increased to 27 million tonnes
Recent results indicate that the rare earth mineralisation could extend 16 km from the Deep Leads / Rubble
Mound resource to the Wind Break discovery
Production of hydrogen fluoride and aluminium fluoride from aluminium smelter
waste (Alcore)
Received two instalments ($3.0 million and $2.7) million of the previously announced $7.5 million in grant
funding under the Federal Government’s Modern Manufacturing Initiative (MMI)
Completed basic engineering design and preliminary engineering design for pilot plant. Orders for major
equipment planned to be placed by September
Lab bath reactor MkII order and planned to be delivered in August, which will expedite process development
Bauxite Operations (Queensland and Tasmania)
For the Binjour Project in Queensland, design of the mine and Bundaberg port was progressed.
1,000 tonnes of bauxite were excavated from a trial pit at the DL130 Project in Tasmania and provided to two
customers
A multi-year supply agreement for cement-grade bauxite is being negotiated with a customer
Corporate
Group available cash at 30 June 2023 was $5.89 million
ABx securities total 223,590,814 ordinary shares
Interim Financial Report for the Half-Year Ended 30 June 2023
Page | 4
ABx Group Limited and Controlled Entities
ACN 139 494 885
ABx Group (ASX: ABX) is a uniquely positioned, high-tech Australian company delivering materials for a cleaner future.
Rare Earths: Ionic adsorption clay resource increased by more than 50%
The mineral resource estimate for the Deep Leads / Rubble Mound project was increased to 21 million tonnes1
averaging 770 ppm TREO and 585 ppm TREO-CeO2 at a cut-off grade of 250 ppm TREO-CeO2.2 This was a five-fold
increase over the resource estimate as at the end of 2022. Post 30 June, the resource estimate was further
increased to 27 million tonnes3 averaging 803 ppm TREO and 603 ppm TREO-CeO2.4 This resource estimate includes
all assay results from samples obtained from the drilling program completed during January-April 2023.
The estimated area within the drilling boundary is 28 km2, of which assay results show that 15 km2 is mineralised
above cut-off grade. The area covered by the 27 Mt resource estimate is 3.3 km2, which is 22% of the estimated
mineralised area.
A grant for drilling at the Wind Break discovery was received from Mineral Resources Tasmania for Round 8 of the
Exploration Drilling Grant Initiative (EDGI). The funding is for up to a maximum of $70,000 on a dollar-for-dollar
basis. An exploration licence application covering the 16 km extension from Deep Leads / Rubble Mound to the
Wind Break REE discovery area is in progress, which will expand the rare earths target area from 35 km2 to more
than 100 km2. ABx has also made two large exploration licence applications covering other key areas in northern
Tasmania south of the Portrush REE discovery area (Figure 1).
71 desorption tests on rare earth element samples from the Deep Leads / Rubble Mound resource were conducted
by ANSTO. Tests were conducted at ‘standard’ desorption conditions of 0.5 M ammonium sulfate at pH 4, which are
low-acid, low-cost processing conditions for ionic adsorption clay (IAC) rare earth deposits. The extractions of
contained rare earths ranged from 24% to 83% for the resource area, and 73% of the samples from the more
closely drilled Deep Leads project area averaged 50% extraction. These are the highest extractions under these
conditions reported for any clay-hosted resource in Australia. Low-cost processing is crucial for IAC rare earth
deposits, and industry processing experts indicate that low-cost processing can only be achieved using desorption
with low acid consumption.
Market discussions with several potential customers endorsed the ABx strategy of producing a mixed rare earth
carbonate for sale to existing processing plants.
1
17 Mt inferred and 4 Mt indicated
2
ASX announcement 8 May 2023
3
24 Mt inferred and 4 Mt indicated
4
ASX announcement 18 July 2023
Interim Financial Report for the Half-Year Ended 30 June 2023
Page | 5
ABx Group Limited and Controlled Entities
ACN 139 494 885
ABx Rare Earths Strategy
Rare earths have many applications in a wide variety of industries. Permanent magnets are the most valuable
application, representing over 90% of the total value of rare earths consumption. Permanent magnets are used in
electric vehicles, wind turbines, smartphones and military applications. The four most important rare earths for
permanent magnets are neodymium, praseodymium, dysprosium and terbium. Furthermore, the demand for these
four ‘supermagnet’ rare earths is predicted to grow faster than for other rare earths.
Globally, most rare earths are sourced from hard-rock mines. These typically require large, costly processing plants
and a significant lead time to reach production.
A less common source of rare earths is ionic adsorption clay (IAC) deposits, which have historically been mined only
in southern China. A major advantage of IAC deposits is that the rare earths can be extracted from the clay via a
low-cost desorption process. Secondly, they often exist at shallow depth. These advantages enable a project to be
developed rapidly and at lower cost. Furthermore, IAC deposits typically contain a higher proportion of heavy rare
earths compared to hard rock deposits, and low concentrations of radioactive elements such as uranium and
thorium. Globally, almost all dysprosium and terbium is sourced from IAC deposits.
ABx is the first company to discover rare earths in Tasmania (Figure 1) and has reported a JORC-compliant mineral
resource of 27 million tonnes at its Deep Leads / Rubble Mound project.
ABx engaged Australian Nuclear Science and Technology Organisation (ANSTO) to conduct desorption tests, which
found the highest extractions under relatively neutral conditions reported from any clay-hosted project in
Australia5,6. This proves the mineralisation to be of the IAC variety. Low-cost processing is crucial for clay-hosted
rare earth deposits, and industry processing experts indicate that low-cost processing can only be achieved using
desorption with low acid consumption. Additionally, the rare earths in the Deep Leads / Rubble Mound resource
have the highest proportion of DyTb (4.3% of TREO) of any clay-hosted rare earths resource in Australia. These
factors put ABx at the forefront for customers and countries seeking to diversify rare earths supply.
Following these excellent discovery and processing results, ABx has built significant momentum and will continue to
conduct further exploration, which will include targeting new areas within its tenements that have geological
features considered prospective for additional rare earths.
The ABx strategy is to produce a mixed rare earth carbonate that can be sold to existing refineries to increase their
production. The ABx carbonate will be high in heavy rare earths and low in radioactive elements, which is expected
to be attractive to many prospective customers. Market discussions with several potential customers endorse this
strategy.
5
ASX announcement 31 May 2022
6
ASX announcement 2 February 2023
Interim Financial Report for the Half-Year Ended 30 June 2023
Page | 6
ABx Group Limited and Controlled Entities
ACN 139 494 885
Figure 1: ABx leases in the 52 km wide REE province, including the new exploration licence application covering
the area between Deep Leads and the Wind Break rare earths discovery located 16km ENE of Deep Leads.
Interim Financial Report for the Half-Year Ended 30 June 2023
Page | 7
ABx Group Limited and Controlled Entities
ACN 139 494 885
Alcore: completed preliminary engineering design of a pilot plant
Alcore received two instalments ($3.0 million and $2.7 million7) of the previously announced $7.5 million8 in
grant funding under the Federal Government’s Modern Manufacturing Initiative (MMI)9. This means that 75% of
the grant funding has been received. Alcore will match the grant funding dollar-for-dollar for the project. The pilot
plant is being designed to recover fluorine from ‘excess bath’, an aluminium smelter waste product, to produce
hydrogen fluoride.
For the pilot plant, a hazard and operability (HAZOP) study was conducted, and the basic engineering design and
preliminary engineering design were completed.10 The detailed engineering designs of all major equipment are
very close to being finalised, with suppliers identified and orders planned to be placed by September 2023. Alcore
staff are working on the site preparation, including with contractors for civil and electric infrastructure work, and
with local authorities for all necessary permits and approvals. The facility will occupy the entire the back section of
the Alcore Technology Centre in Berkeley Vale, NSW. It is planned that pilot plant commissioning will commence
by March 2024.
Development work in 2022 and early 2023 strongly indicated that the existing laboratory equipment provided
insufficient process mixing to achieve a very high yield of fluorine from the aluminium smelter waste. Yield is
important, to maximise the amount of hydrogen fluoride and aluminium fluoride produced and minimise the
amount of fluorine that reports to the metal sulfate co-products. In late March, a laboratory bath reactor MkII
employing state-of-the-art technology to enhance process mixing was ordered from a specialised international
supplier. Manufacture and factory testing is complete and delivery is expected in August.
Further experiments were conducted using the existing laboratory equipment. The results support the conclusion
that process mixing is a limiting factor, giving further confidence that the laboratory bath reactor MkII will achieve
higher fluorine yield. This will be very significant because it will:
•
Give further confidence that the pilot plant will perform as designed
•
Enable further development work to be conducted on processing of the metal sulfate co-products
7
ASX announcement 28 June 2023
8
ASX announcement 29 April 2022. Note: Actual grant is $7,582,966
9
The grant provides for up to 50% of eligible project expenditure. See https://business.gov.au/grants-and-
programs/mmi-manufacturing-translation-stream-recycling-and-clean-energy-round-2
10
ASX announcement 21 June 2023
Interim Financial Report for the Half-Year Ended 30 June 2023
Page | 8
ABx Group Limited and Controlled Entities
ACN 139 494 885
Alcore Strategy
Hydrogen fluoride is an essential chemical for the production of fluorocarbons and aluminium fluoride. Aluminium
fluoride is an essential chemical for aluminium metal production.
Hydrogen fluoride is mainly produced from fluorspar, which is obtained from the mineral fluorite. Fluorspar is
relatively high cost and has been identified as a critical material by the USA, Europe, Japan and Canada.
Australia does not mine any fluorite, or produce any fluorspar, hydrogen fluoride or aluminium fluoride, and so
must import all its requirements. The Australian demand for hydrogen fluoride is small, and it is imported at high
cost. Conversely, Australia is a significant producer of aluminium and so its demand for aluminium fluoride is high.
Australia is the largest producer of primary aluminium metal without its own domestic aluminium fluoride
production, so Australian aluminium smelters rely entirely on imported aluminium fluoride. This is typically more
than 80% from China, but this proportion was only 40% in 2021 when China production was lower, illustrating the
supply risks (Figure 2). Aluminium fluoride prices have been above US$1,300/t for the last 20 months (Figure 3).
Most modern aluminium smelters produce excess bath, for which the only meaningful market is new smelters,
which require bath to commence operations. Aluminium industry forecasts suggest that the global bath market
will increasingly be in surplus, because far fewer new smelters are being constructed. All the major global
aluminium producers are eager for alternative applications for excess bath, to avoid the unpalatable options of
on-site storage or landfill.
Alcore has developed a world-first process to recover hydrogen fluoride from aluminium smelter bath. This is
combined with aluminium hydroxide to produce aluminium fluoride. Alcore is also investigating the use of dross
(another aluminium smelter waste) and bauxite as alternatives to aluminium hydroxide as the source of
aluminium. The use of dross or bauxite would further lower the production cost.
Alcore intends to construct commercial hydrogen fluoride and aluminium fluoride plants in Bell Bay, Tasmania.
The aluminium source for the initial aluminium fluoride production is likely to be aluminium hydroxide, as this is
lower risk and allows a faster path to production. Subsequent production may use aluminium from dross or
bauxite to further improve the financial and environmental outcomes.
The initial plant is proposed to transform 1,600 tonnes per year of aluminium smelter bath into hydrogen fluoride
and other industrial chemicals. A proportion of the hydrogen fluoride will be further processed to aluminium
fluoride. The relative amounts of hydrogen fluoride and aluminium fluoride produced can be optimised to suit
market demand. Alcore’s longer term plan is to expand the plant by 15 times, which will process all of Australia’s
aluminium smelter bath and supply more than 80% of Australia’s aluminium fluoride requirements.
Interim Financial Report for the Half-Year Ended 30 June 2023
Page | 9
ABx Group Limited and Controlled Entities
ACN 139 494 885
Figure 2: Imports of aluminium fluoride from China into Australia (source: China Customs Statistics)
Figure 3: Aluminium fluoride monthly prices FOB China (source: China Customs Statistics)
Interim Financial Report for the Half-Year Ended 30 June 2023
Page | 10
ABx Group Limited and Controlled Entities
ACN 139 494 885
Bauxite Operations
Sunrise Bauxite Project: Binjour, Queensland
An internal review of the Binjour mine plan has progressed, with selection of the preferred mining schedule and
infrastructure layout.
The infrastructure designs for the operational site at the Bundaberg port were modified. The application to modify
the Bundaberg port site boundary is being assessed by the Department of Resources.
The next stage of environmental studies at both the mine and port locations are scheduled for Q4, 2023.
DL130 Bauxite Project: Tasmania
1,000 tonnes of bauxite were excavated from a trial pit and provided to two customers. The customer trial for
fertiliser production was successful and future orders are anticipated. The material for trial for cement production
is enroute to the customer. In parallel, a multi-year supply agreement for cement-grade bauxite is being
negotiated with this customer.
The Environmental Effects Report (EER) was submitted to the EPA. After review by the EPA, minor amendments
were made to the EER and it was resubmitted for evaluation. The EER forms a significant part of the mine lease
application
Discussions were held with all landowners affected by the mine lease application. No major issues were identified,
but finalisation of landowner agreements is taking longer than anticipated. Commencement of mining is now
expected in Q4 2023 / Q1 2024.
Bauxite Strategy
The ABx strategy is to selectively produce metallurgical grade, cement grade and fertiliser grade bauxite, with a
focus on profitability.
The largest project is Binjour, with a JORC compliant resource of 37 million tonnes, supporting 20-25 years
production. In February 2022, ABx entered a JV with Alumin for the development of the Sunrise Bauxite Project,
comprising a bauxite mine at Binjour plateau and port operations at Bundaberg in Queensland11. Alumin is an
Australian special purpose vehicle company associated with our strategic marketing partner, Rawmin India, having
extensive experience in funding long term sustainable investments in projects involving mining and bulk-shipping
of metallurgical grade bauxite to end users around the world.
It is anticipated that the mine at Binjour will export 500,000 tonnes per year of metallurgical grade bauxite in its
first year of production, then scale up to full operational capacity of 1.5 million tonnes per year. ABx plans to begin
exporting product in H1 2025.
11
ASX Announcement 28 February 2022
Interim Financial Report for the Half-Year Ended 30 June 2023
Page | 11
ABx Group Limited and Controlled Entities
ACN 139 494 885
In Tasmania, ABx has a JORC compliant resource of 13.7 million tonnes across three deposits. ABx plans to
recommence bauxite mining in Tasmania by Q1 2024, at the DL130 Bauxite Project. The primary products are
likely to be cement grade and fertiliser grade bauxite.
Interim Financial Report for the Half-Year Ended 30 June 2023
Page | 12
ABx Group Limited and Controlled Entities
ACN 139 494 885
DIRECTORS’ REPORT
Your directors present their report together with the financial statements of the parent entity and the
consolidated entity (referred to hereafter as the Group) consisting of ABx Group Limited (the Company) and the
entities it controlled at the end of or during the period ended 30 June 2023 and the Auditor’s Review Report
thereon.
Principal activities
The principal continuing activities of the Group during the reporting
period were selling bauxite mineral, conducting the bauxite processing
research, development and exploration programs.
Financial performance
The net consolidated loss of the Group for the six months ended 30
June 2023 was $1.22 million (2022: Loss $0.95 million).
Cash holding of the Group at 30 June 2023 was $5.91 million.
The Group will have sufficient cash reserves to fund its current
exploration, processing and development programs.
Review of operations
Information on the operations and financial position of the Group
and its business strategies and prospects are set out in the Review
of Operations on pages 4 to 12 of this report.
Dividends
The Directors of the Company do not recommend that any amount
be paid by way of dividend. The Company has not paid or declared
any amount by way of dividend since the commencement of the
financial year.
Directors
The following persons were directors of ABx Group Limited during the whole of the period and up to the date of
this report, unless otherwise stated:
Paul Lennon
Dr Mark Cooksey
Ian Levy
Ken Boundy
Non‐Executive Chairman
Executive Director and
Chief Executive Officer
Non-Executive Director
Non‐Executive Director
Subsequent Events
At the date of this report there are no matters or circumstances which have arisen since 30 June 2023 that have
significantly affected or may significantly affect:
the operations, in financial half‐year subsequent to 30 June 2023, of the Group;
the results of those operations; or
the state of affairs, in financial half‐year subsequent to 30 June 2023, of the Group.
Rounding
The amounts contained in the half year financial report have been rounded to the nearest thousand dollars
(where rounding is applicable) under the option available to the Company under ASIC Class Order 98/100. The
Company is an entity to which the Class Order applies.
Interim Financial Report for the Half-Year Ended 30 June 2023
Page | 13
ABx Group Limited and Controlled Entities
ACN 139 494 885
Directors’ Report (continued)
Environmental Regulations
The Group is subject to significant environmental regulation in respect of its exploration activities as follows:
The Company’s operations in the State of Queensland involve drilling operations. These operations are
governed by the Environmental Protection Act (1994).
The Company’s operations in the State of NSW involve exploration activities. These operations are
governed by the Environment Planning and Assessment Act 1979.
The Company’s operations in the State of Tasmania involve drilling operations. These operations are
governed by the Environmental Management and Pollution Control Act 1994.
The Company operates within the resources sector and conducts its business activities with respect for
the environment while continuing to meet the expectations of the shareholders, employees and
suppliers.
The Company aims to ensure that the highest standard of environmental care is achieved, and that it
complies with all relevant environmental legislation. The Directors are mindful of the regulatory regime in
relation to the impact of the Company’s activities on the environment.
To the best of the directors’ knowledge, the Group has adequate systems in place to ensure compliance
with the requirements of all environmental legislation described above and are not aware of any breach
of those requirements during the financial year and up to the date of the Directors’ Report.
Environmental Code of Practice for Bauxite Mineral Exploration, adopted 1 March 2010
The Company is committed to conducting its exploration programs by following industry best practice in
accordance with published government guidelines and codes.
The following policy is specific to bauxite exploration on the Company’s east Australian bauxite province.
Access to Land
Prior to the commencement of any work, the Company makes contact with landholders/leaseholders and
discusses the general aims and types of work likely to be conducted. Discussion with landowners, leaseholders and
Native Title Claimants is ongoing. It commences prior to any work being conducted and continues throughout the
program and beyond the cessation of exploration work.
The Company establishes conditions of access with landholders and where practicable, signs a written access
agreement that sets out conditions and includes a schedule of agreed compensation payments. The Company
endeavours to provide landholders with ample warning prior to commencing any work and landholders are kept
informed upon commencement, during and upon completion of an exploration program.
Type of Land
The type of land is determined and its inhabitants are assessed to identify areas of particular environmental
concern including identification of sensitive areas or areas prone to erosion, water catchment, heritage sites, and
areas home to vulnerable and endangered species.
Land use is taken into consideration and land under cultivation is not disturbed without the express consent of the
landholder.
Mineral Exploration Programs Access
The Company utilises existing tracks for access where possible. Climatic conditions are considered when assessing
areas to avoid access during extreme conditions such as during bush fire risk during hot, windy conditions and
damage to tracks after heavy rain. Surface disturbances are kept to a minimum.
Interim Financial Report for the Half-Year Ended 30 June 2023
Page | 14
ABx Group Limited and Controlled Entities
ACN 139 494 885
Directors’ Report (continued)
Drilling
Drilling programs include rehabilitation and where possible holes are positioned in areas requiring little or no
clearing. Small, manoeuvrable drill rigs are used to minimise the need for track clearing and to reduce ground
compaction. Where required, topsoil is removed and stored separately so that it can be replaced during
rehabilitation of the site. Ground sheets are used where required to avoid oil/fuel spills contaminating the soil.
Rehabilitation
Drill sites are rehabilitated as soon as practicable and drill holes are filled and capped where necessary.
Landholders are asked to confirm at the end of each program that exploration has been conducted to their
satisfaction and that sites have been rehabilitated.
Qualifying Statements
General: The information in this report that relate to Exploration Information and Mineral Resources are based on
information compiled by Jacob Rebek and Ian Levy who are members of The Australasian Institute of Mining and
Metallurgy and the Australian Institute of Geoscientists. Mr Rebek and Mr Levy are qualified geologists and Mr
Levy is a director of Australian Bauxite Limited.
Mainland: The information relating to Mineral Resources on the Mainland was prepared and first disclosed under
the JORC Code 2004. It has not been updated since to comply with the JORC Code 2012 on the basis that the
information has not materially changed since it was last reported. Mr Rebek and Mr Levy have sufficient
experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity, which they are undertaking to qualify as a Competent Person as defined in the 2004 Edition of the
Australasian Code for Reporting of exploration Results, Mineral Resources and Ore Reserves. Mr Rebek and Mr
Levy have consented in writing to the inclusion in this report of the Exploration Information in the form and
context in which it appears.
Tasmania: The information relating to Exploration Information and Mineral Resources in Tasmania has been
prepared or updated under the JORC Code 2012. Mr Rebek and Mr Levy have sufficient experience, which is
relevant to the style of mineralisation and type of deposit under consideration and to the activity, which they are
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Rebek and Mr Levy have consented in
writing to the inclusion in this report of the Exploration Information in the form and context in which it appears.
Previous ASX announcements can be found at https://www.abxgroup.com.au/site/investor-information/asxannouncements.
Auditor’s Independence Declaration
A copy of the independence declaration by the auditor K.S. Black and Co. under section 307C is included on page
16 of this half year financial report.
Signed in accordance with a resolution of the Directors:
Dr Mark Cooksey
Executive Director
29 August 2023
Paul Lennon
Chairman
Interim Financial Report for the Half-Year Ended 30 June 2023
Page | 15
ABx Group Limited and Controlled Entities
AUDITOR’S INDEPENDENCE DECLARATION
Interim Financial Report for the Half-Year Ended 30 June 2023
Page | 16
ACN 139 494 885
ABx Group Limited and Controlled Entities
INDEPENDENT AUDITOR’S REVIEW REPORT
Interim Financial Report for the Half-Year Ended 30 June 2023
Page | 17
ACN 139 494 885
ABx Group Limited and Controlled Entities
Interim Financial Report for the Half-Year Ended 30 June 2023
Page | 18
ACN 139 494 885
ABx Group Limited and Controlled Entities
ACN 139 494 885
DECLARATION BY DIRECTORS
The Directors of the Company declare that:
1.
The financial statements and notes, set out on pages 20 to 33, are in accordance with the
Corporations Act 2001, and:
•
•
2.
give a true and fair view of the financial position of the consolidated entity as at
30 June 2023 and of its performance for the half‐year ended on that date; and
comply with Australian Accounting Standard AASB 134 Interim Financial Reporting and the
Corporations Regulations 2001.
In the Directors’ opinion, there are reasonable grounds to believe that the company will
be able to pay its debts as and when they become due and pa