ALCORE Bath Pilot Batch Reactor Update:
Latest Test Runs Achieve Higher Fluorine Recovery
Analytical results from further runs using bath pilot batch reactor show higher
fluorine recovery
80% fluorine recovery achieved in single stage, with further processing of
product material achieving 88% fluorine recovery
Next stage of work planned to involve combination of bath pilot batch reactor and
specialised laboratory reactor
Figure 1: Preparing to disassemble bath pilot batch reactor after test run
ABx Group (ASX:ABX) (“ABx” or “the Company”) is pleased to announce independent
assessments of several powder samples from further runs of its 83%-owned subsidiary
ALCORE’s bath pilot batch reactor have indicated higher fluorine recovery.
The reactor is operating at the ALCORE Technology Centre on the NSW Central Coast and
has been designed for the recovery of fluorine from ‘excess bath’ (an aluminium smelter
waste) to produce hydrogen fluoride.
At commercial scale, a proportion of the hydrogen fluoride will be further processed via an
existing commercial process to produce aluminium fluoride – a high-value chemical essential
for aluminium smelting that is currently fully imported.
ABx Group Limited
Level 4, 100 Albert Road, South Melbourne, VIC 3205
ABN 14 139 494 885
P: +61 3 9692 7222
F: +61 2 9956 7355
ASX announcement 4 April 2024
page 2
Since the bath pilot batch reactor was commissioned in October 2023 1 , ALCORE has
conducted several test runs, each involving approximately 10kg total of bath and sulfuric
acid.
ABx has previously reported assay results from the first three test runs, with samples from
the third test run consistently showing 70% fluorine recovery.2
To enable ALCORE to prepare bath feed with a narrower range of finer particle sizes –
anticipated to increase fluorine recovery – a ball mill and ultrasonic vibrating screen was
ordered in November 2023 and received in January 2024.
With this improved bath preparation capability, ALCORE has conducted three further runs
since late January. The assay results from these runs indicated significant impacts of feed
particle sizes on fluorine recovery, with a maximum of 80% being achieved from a single
process stage using the bath pilot batch reactor alone.
A rigorous analysis of the results suggests that a second stage process, using a different
reactor configuration, may be required to further increase the fluorine recovery to over 90%.
This possibility has been anticipated for some time and has been incorporated into the
design of the continuous pilot plant, as some existing analogous commercial processes
involve two stages.
Initial investigations, involving further manual processing of some product material from
these recent runs in a separate furnace, achieved a maximum of 88% fluorine recovery.
These manual tests highlight the necessity but also the exciting potential of a second stage
reactor, and provide direction for design optimisation of the second stage reactor.
In addition, separate pilot batch reactor runs were conducted at various temperatures to
investigate the effect of temperature on fluorine recovery. This exploration will assist to
identify the feasible range of process temperatures for future continuous pilot process
operation.
Commenting on the reactor performance, ABx Group Managing Director and CEO Dr
Mark Cooksey said:
“I am pleased with our progress and with the ongoing increase in fluorine recovery with each
reactor test ALCORE has undertaken. As anticipated, the newly commissioned equipment which
allowed bath feed particle size to be optimised has assisted in achieving a higher recovery of
fluorine in the latest test runs.
“The next stage of development work is planned to involve using the existing specialised laboratory
reactor3 to serve as the second process stage. It is anticipated that the combination of the bath
pilot batch reactor and the specialised laboratory reactor can produce a higher fluorine recovery.
We are in the process of planning further reactor tests over the coming months. I look forward to
keeping investors up-to-date about these future results.”
1
ASX announcement, 8 November 2023
ASX announcement, 20 February 2024
3
ASX announcement, 18 July 2022
2
ASX announcement 4 April 2024
page 3
This announcement is approved for release by the board of directors.
For further information please contact:
Dr Mark Cooksey
MD & CEO
ABx Group
+61 447 201 536
mcooksey@abxgroup.com.au
www.abxgroup.com.au
Media
Chapter One Advisors
David Tasker / Alex Baker
+61 433 112 936 / +61 432 801 745
dtasker@chapteroneadvisors.com.au /
abaker@chapteroneadvisors.com.au
About ABx Group Limited
ABx Group (ABx) is a uniquely positioned, high-tech Australian company delivering materials
for a cleaner future.
The two current areas of focus are:
Creation of an ionic adsorption clay rare earth project in northern Tasmania
Establishment of a plant to produce hydrogen fluoride and aluminium fluoride from
recycled industrial waste, to replace imports (ALCORE)
There is also a legacy business:
Mining and enhancing bauxite resources for cement, aluminium and fertiliser
production
ABx endorses best practices on agricultural land, strives to leave land and environment
better than we find it. We only operate where welcomed.
Disclaimer Regarding Forward Looking Statements
This ASX announcement (Announcement) contains various forward-looking statements. All
statements other than statements of historical fact are forward-looking statements.
Forward-looking statements are inherently subject to uncertainties in that they may be
affected by a variety of known and unknown risks, variables and factors which could cause
actual values or results, performance, or achievements to differ materially from the
expectations described in such forward-looking statements.
ABx does not give any assurance that the anticipated results, performance, or achievements
expressed or implied in those forward-looking statements will be achieved.
Share your feedback
Discover