Quarterly report and activity statement
3 months to 30 September 2025
ABx Group Limited (ASX: ABX) is a uniquely positioned Australian company delivering
materials for a cleaner future.
Highlights
Heavy rare earths: Supplying light and heavy rare earths from Tasmania into Western
supply chains
ANSTO diagnostic and larger-scale slurry tests confirm exceptionally high
extractions of the heavy rare earths dysprosium (Dy) and terbium (Tb), achieving
up to 72% Dy and 73% Tb under benign leach conditions (pH > 4)
ANSTO remains on schedule to deliver a mixed rare earth carbonate (MREC)
product sample in Q4 2025 for evaluation by potential customers
Clean fluorine chemical production: Producing industrial chemicals from aluminium
smelter by-product (ALCORE)
Continuous pilot-plant construction at Bell Bay, Tasmania, remains on schedule
with all key equipment ordered and fabrication advancing
AusIndustry approved ALCORE’s Overseas R&D Finding, enabling claims on
overseas expenditure for 2024–2026
Near-term bauxite production: Mining bauxite resources for the aluminium, cement
and fertiliser industries
Agreements with Good Importing International (GII) GII to invest up to $5.4m to
acquire up to a 75% interest in the ABx Sunrise Bauxite Project in Queensland
GII to have a 9-month exclusive option to invest $4.8m to acquire a 75% interest
in the ABx Taralga and Penrose Bauxite Projects in New South Wales
Corporate
Completed a $3 million placement at $0.064 per share, led by Alpine Capital, to
advance Deep Leads and support working capital needs.
ASX: ABX
31 October 2025
2
Quarterly report to 30 September 2025
Heavy Rare Earths: Supplying light and heavy rare earths from Tasmania into Western
supply chains
During the quarter, ABx and ANSTO achieved multiple technical milestones in the Deep Leads
program:
• Diagnostic leach tests on 100 kg of bulk sample achieved greater than 70% extractions
for Dy and Tb under mild acidic conditions, confirming the deposit can be effectively
leached above pH 4 — roughly the acidity of apple juice — reducing impurities and
lowering reagent use.1
• Larger-scale slurry tests (300g samples) reproduced outstanding rare earths extractions:
o 60-66% for dysprosium (Dy) and 55-62% for terbium (Tb)
o 65-72% for neodymium (Nd) and 63-70% for praseodymium (Pr)
Results indicate that the high extractions achieved in smaller-scale tests are reproduced
in the larger-scale tests that are more representative of conditions in commercial
production.2
• Post end-of-quarter, impurity-removal optimisation reported by ANSTO identified over
98% of rare earths retained – a major indicator of process efficiency and purity – with
even higher retention rates for key permanent magnet rare earths.3
The overall program is on schedule, with ANSTO’s production of a MREC product sample
expected in Q4 2025. Results and samples will be provided to prospective customers.
A formal Processing Options Analysis for the Deep Leads project was conducted in partnership
with external experts. This has helped clarify the pathway to develop an optimised project
design.
Applications for two new exploration leases are in progress:
• EL25/2022: covering the 16 km extension from Deep Leads - Rubble Mound to the Wind
Break discovery area
• EL14/2025: a 165 km2
tenement about 30 km northwest of Launceston and south of the
famous Beaconsfield gold mine
Discussions with potential customers in North America and Europe for an ABx mixed rare earth
carbonate (MREC) product continued to highlight the value of an MREC with relatively high
proportions of heavy rare earths, particularly dysprosium (Dy) and terbium (Tb).
In-house facilities continue to be used for metallurgical studies on the Deep Leads resource.
Post end-of-quarter, an R&D tax offset of $480,000 was received for rare earth activities
undertaken in 2024.4
1
ASX announcement, 3 September 2025
2
ASX announcement, 17 September 2025
3
ASX announcement, 13 October 2025
4
ASX announcement, 6 October 2025
3
Quarterly report to 30 September 2025
Rare Earths Strategy
ABx’s vision is to establish Australia’s first ionic rare earths project, where a mixed rare earth
carbonate (MREC) with high dysprosium and terbium content will be produced and sold to rare
earth separation plants.
Rare earths have many applications in a wide variety of industries. Permanent magnets are the
most valuable application, representing over 90% of the total value of rare earths demand.
Permanent magnets are used in electric vehicles, wind turbines, smartphones and military
applications. The four most important rare earths for permanent magnets are neodymium (Nd),
praseodymium (Pr), dysprosium (Dy) and terbium (Tb). The demand for these four rare earths is
predicted to grow significantly in coming years, potentially leading to significant supply shortfalls.
The supply risk is highest for dysprosium and terbium, the two heavy rare earths that enable
permanent magnets to perform at high temperatures.
Globally, most rare earths are sourced from mineral deposits. These typically require large,
costly processing plants and a significant lead time to reach production.
An alternative source of rare earths is clay-hosted deposits. These typically contain a mixture of
ionically adsorbed (ionic) rare earths and non-ionic rare earths. The relative proportions of each
in different deposits varies enormously. The ionic rare earths can be leached using a low-cost
process.
The other typical major advantages of ionic rare earths are:
• Higher proportion of heavy rare earths compared to mineral deposits
• Low concentrations of radioactive elements such as uranium and thorium
• Exist at shallow depth
Deposits of ionic rare earths have historically been mined predominantly in southern China.
ABx has reported a JORC-compliant mineral resource of 89 million tonnes5
at its Deep Leads -
Rubble Mound and Wind Break deposits.6
The resource contains 36 ppm Dy+Tb7
and Dy+Tb is
4.3% of TREO, the highest of any clay-hosted rare earth deposit in Australia and among the
highest globally. Furthermore, the level of radioactive elements is very low (2 ppm U2O3 and 6
ppm ThO2).
Leaching tests conducted by Australian Nuclear Science and Technology Organisation (ANSTO)
found the highest ionic extractions reported from any clay-hosted resource in Australia.8,9
The ABx rare earth deposits are located in accessible forest plantations near major towns,
highways, ports and grid hydropower.
5
41 Mt inferred, 42 Mt indicated and 6 Mt measured
6
ASX Announcement, 2 May 2024
7
Dy+Tb = Dy2O3 + Tb4O7
8
ASX Announcement, 31 May 2022
9
ASX Announcement, 2 February 2023
4
Quarterly report to 30 September 2025
ABx has executed a Memorandum of Understanding with Ucore Rare Metals Inc. (TSXV: UCU)
(OTCQX: UURAF),10
which is focussed on creating rare-earth processing facilities in North
America, and ABx is also in discussions with additional potential offtake partners.
The next stages of the project are:
• Further exploration, to identify the preferred initial mining location and grow the
resource
• Metallurgical studies, to inform the process design
• Developing a preferred process design and cost model
Figure 1: ABx leases in the 52 km wide REE province in northern Tasmania.
10
ASX Announcement, 4 September 2024
5
Quarterly report to 30 September 2025
Clean Fluorine Chemical Production: Producing industrial chemicals from aluminium
smelter by-product (ALCORE)
The design and construction of the continuous pilot plant are proceeding on schedule at the
ALCORE Technology Centre (ATC) in Bell Bay, Tasmania (Figure 2).11
Infrastructure upgrades,
including power supply expansion, low-voltage electrical distribution, equipment
foundations and hazardous chemical bunding are being designed according to equipment
specifications and Australian regulatory standards.
Auxiliary systems have been manufactured by external suppliers, including the wastewater
treatment plant, demineralised water system and air compressor package. These systems
will be delivered to site and installed after equipment foundations and utilities are prepared.
Detailed mechanical designs and fabrication drawings have been completed for two of three
major process equipment packages, with the remaining design expected by early November.
Figure 2: Location of ALCORE Pilot Plant in proximity to Bell Bay aluminium smelter
AusIndustry approved an Overseas R&D Finding application,12
which recognises that certain
development activities with South African fluorochemical engineering consultant BFluor
Chemicals and international equipment suppliers cannot be performed in Australia. The
ruling covers overseas R&D expenditure for 2024–2026, including more than $2 million of
capital costs for the Bell Bay continuous pilot plant. This outcome strengthens ALCORE’s
technology development and underscores its collaboration with specialised international
partners.
11
ASX announcement, 10 October 2025
12
ASX announcement, 4 September 2025
6
Quarterly report to 30 September 2025
ALCORE is preparing an application for a Commercialisation and Growth Grant of up to $5
million from the Federal Government Industry Growth Program, which is designed to
support small and medium enterprises (SMEs) undertaking innovative commercialisation
and/or growth projects within the priority areas of the Australian Government’s National
Reconstruction Fund. ALCORE successfully passed the first stage of the application process,
where an Industry Growth Program Adviser was provided who has worked with ALCORE to
develop a plan for commercialisation and has provided an Advisory Service report.
ALCORE reached agreement with the Department of Industry, Science and Resources (DISR)
on a schedule for repayment of Modern Manufacturing Initiative (MMI) grant funds. The
Federal Government’s program, which concluded in March 2025, approved $7.44 million in
total project expenditure, including $3.15 million in eligible grant funds. DISR indicated that
the unused balance of grant funds received ($2.53m) was repayable. DISR confirmed its
support for the ALCORE project and agreed to a repayment plan of roughly equal monthly
instalments concluding on 29 June 2026.
Post end-of-quarter, an R&D tax offset of $298,000 was received for ALCORE activities
undertaken in 2024.13
Clean Fluorine Chemicals Strategy
ALCORE’s vision is to establish the production of hydrogen fluoride and aluminium fluoride
in Australia, using an aluminium smelter by-product as feed material.
The main applications of hydrogen fluoride are to produce fluorocarbons, such as
refrigerants and polymers, and aluminium fluoride. It is also used in the manufacture of solar
cells and lithium-ion batteries, which is the most rapidly growing application. The global
market for hydrogen fluoride is over US$3 billion.
Hydrogen fluoride is mainly produced from fluorspar, which is obtained from the mineral
fluorite. Fluorspar is relatively high cost and has been identified as a critical material by all
major jurisdictions, including Australia.
Australia does not mine any fluorite, or produce any fluorspar, hydrogen fluoride or
aluminium fluoride, and so must import all its requirements. The present Australian demand
for hydrogen fluoride is small and it is imported at high cost. There are prospects for demand
growth, but this will be difficult to satisfy without local production.
Aluminium fluoride is an essential chemical for aluminium metal production. Australia is the
largest global producer of aluminium metal without its own domestic aluminium fluoride
production, so Australian aluminium smelters rely entirely on imported aluminium fluoride,
typically more than 80% from China.
Most modern aluminium smelters produce excess ‘bath’ as a by-product, a solid powder that
contains about 50% fluorine, for which the only meaningful market is new smelters that
require bath to commence operations. Aluminium industry forecasts suggest that the global
bath market will increasingly be in surplus, because far fewer new smelters are being
13
ASX announcement, 6 October 2025
7
Quarterly report to 30 September 2025
constructed. All the major global aluminium producers are eager for alternative applications
for excess bath, to avoid the unpalatable options of on-site storage or landfill.
ALCORE has developed a world-first proprietary process to produce industrial chemicals
from aluminium smelter bath. The major products are hydrogen fluoride and metal sulfates.
The hydrogen fluoride is combined with aluminium hydroxide to produce aluminium
fluoride via an existing commercial process. The combined approach is illustrated in Figure
3.
The metal sulfates can potentially be sold as a single industrial chemical or further processed
into multiple industrial chemicals. A range of options is being assessed.
ALCORE intends to construct commercial hydrogen fluoride and aluminium fluoride plants
in Bell Bay, Tasmania.
The process to produce hydrogen fluoride has been operated at pilot scale in a batch reactor.
The next stage is to construct and operate a bath continuous pilot plant, the outcomes of
which will be:
1. Selection of reactor designs and process conditions for the commercial plant
2. Production of saleable hydrogen fluoride for evaluation by customers
ALCORE has secured the support of Rio Tinto14
and the Tasmanian Government15
to locate
the pilot plant in an existing industrial facility adjacent to the Bell Bay aluminium smelter in
northern Tasmania.
Figure 3: Circular economy approach of production of clean fluorine chemicals from aluminium smelter
bath
14
ASX Announcement, 15 January 2025
15
ASX Announcement, 19 December 2024
8
Quarterly report to 30 September 2025
Near-term Bauxite Production: Mining bauxite resources for the aluminium, cement and
fertiliser industries
Sunrise Bauxite Project: Binjour, Queensland
ABx executed a transformational series of agreements with Good Importing International
(GII), with GII to invest up to $5.4m in two stages to acquire up to a 75% interest in ABx3 Pty
Ltd (ABx3), a wholly-owned subsidiary of ABx, which holds the Sunrise Bauxite Project assets
(Figure 4). 16
Post end-of-quarter, GII made a Stage 1 $2.7 million payment to earn 70% ownership of
ABx3.17
These funds will be used to finalise the project design for the extraction of at least
800,000 tonnes of direct shipping ore bauxite from the Binjour mine and export through
Bundaberg port:
• Secure all regulatory approvals, land access agreements and permits
• Finalise mine plan
• Finalise port infrastructure design
The Stage 1 program is expected to take 12-24 months.
Taralga and Penrose Bauxite Projects: New South Wales
ABx has also granted GII a 9-month exclusive option to invest $4.8m to acquire a 75% interest
in ABx2 Pty Ltd (ABx2), a wholly-owned subsidiary of ABx, which holds the Taralga and
Penrose bauxite assets (Figure 5). This option may be exercised by 11 December 2025, or GII
may extend the option exercise deadline to 11 June 2026 by paying a non-refundable option
fee of $300,000 by 11 December 2025. This fee will be credited against the exercise price if
the option is exercised and completed.
DL130 Bauxite Project: Tasmania
As previously advised, in May, Meander Valley Council (MVC) approved the planning permit,
subject to some conditions, including that:
• ABx makes a one-off reasonable, equitable and proportional financial contribution
towards MVC’s reasonable costs of the design and construction of upgrades to the
section of Porters Bridge Road between Meander Valley Road and access to the site, and:
• ABx cannot use Porters Bridge Rd to transport bauxite quarried from the site until MVC
has completed the upgrades to the road
ABx appealed aspects of the MVC decision to the Tasmanian Civil & Administrative Tribunal
(TASCAT). A representor also appealed the decision. All parties are participating in mediation,
which continues.
16
ASX announcement, 12 September 2025
17
ASX announcement, 9 October 2025
9
Quarterly report to 30 September 2025
Bauxite Strategy
Metallurgical and Refractory Grade
Global metallurgical bauxite prices spiked substantially in late 2024 and early 2025 due to a
combination of factors, notably actions by the Guinean government to restrict export by
some companies.
These higher prices materially increase the value of ABx’s bauxite assets. The ABx strategy is
to bring these into production as soon as possible, with a focus on profitability.
The ABx metallurgical and refractory bauxite assets are listed in Table 1.
The Sunrise Bauxite Project in Queensland consists of a JORC-compliant resource of
37 million tonnes of gibbsite-type metallurgical bauxite at Binjour and port operations at
Bundaberg port (Figure 4).
The Taralga deposit consists of a JORC-compliant resource of 38 million tonnes of gibbsite-
type metallurgical bauxite, located 200 km inland from Port Kembla. The Penrose discovery
is a layer of refractory-grade bauxite in Penrose state pine forest, adjacent to the Hume
Highway, 90 kilometres from Port Kembla.
ABx executed a transformational series of agreements with Good Importing International
(GII). GII will invest up to $5.4m in two stages to acquire up to a 75% interest in ABx3 Pty Ltd
(ABx3), which holds the Sunrise Bauxite Project assets. GII also has a 9-month exclusive
option to invest $4.8m to acquire a 75% interest in ABx2 Pty Ltd (ABx2), which holds the
Taralga and Penrose bauxite assets.
GII has made the Stage 1 $2.7 million payment to earn 70% ownership of ABx3.18
Table 1: ABx bauxite resources subject to agreements with Good Importing International (GII)
Location State ABx Subsidiary Resource (Mt)
Inferred Indicated Total
Binjour19
QLD ABx3 14.2 22.8 37.0
Taralga20
NSW ABx2 17.5 20.4 37.9
Penrose21
NSW ABx2 - - -
18
ASX announcement, 9 October 2025
19
ASX Announcement, 18 June 2018 and Table 1
20
ASX Announcement, 31 May 2012 and Table 1
21
ASX Announcement, 27 February 2017
10
Quarterly report to 30 September 2025
Figure 4: Sunrise Bauxite project (mine at Binjour and port at Bundaberg)
Figure 5: Taralga and Penrose Bauxite projects, and port at Port Kembla
11
Quarterly report to 30 September 2025
Cement and Fertiliser Grade
The ABx strategy is to selectively produce cement grade and fertiliser grade bauxite, with a
focus on profitability. ABx bauxite can substantially improve the properties of cement and
superphosphate fertiliser produced by particular plants.
In Tasmania, ABx has three bauxite deposits of cement and fertiliser grade. ABx has
previously mined at Bald Hill near Campbell Town from 2014 to 2020 and sold the product
to cement and fertiliser plants.
ABx plans to recommence bauxite mining at the DL130 Bauxite Project, located about 50 km
west of Launceston.
In September 2023, an agreement was executed with Adelaide Brighton Cement Limited
(ABCL), a subsidiary of Adbri Limited (ASX:ABC), for the supply of cement-grade bauxite to
ABCL’s Birkenhead cement manufacturing operation in South Australia.22
The agreement
forecasts supply of 90,000-120,000 tonnes of bauxite over a five-year term.
Meander Valley Council (MVC) has approved the DL130 planning permit, subject to some
conditions. ABx appealed aspects of the MVC decision to the Tasmanian Civil &
Administrative Tribunal (TASCAT). A representor also appealed the decision. All parties are
participating in mediation.
Corporate
In September, ABx completed a $3 million placement at $0.064 per share, led by Alpine
Capital, to advance Deep Leads and support working capital needs
In May 2024, ABx published its baseline Environmental, Social, and Governance (“ESG”)
report.23
In each quarterly report, ABx will publish its ESG progress dashboard, summarising
its progress against 21 core metrics developed by the World Economic Forum. The
dashboard is shown on the following page.
Updated rare earths, ALCORE and bauxite presentations have been placed on the ABx
website www.abxgroup.com.au.
This announcement is approved for release by the board of directors.
For further information please contact:
Dr Mark Cooksey
MD & CEO
ABx Group
+61 447 201 536
mcooksey@abxgroup.com.au
www.abxgroup.com.au
Media
Chapter One Advisors
David Tasker / Alex Baker
+61 433 112 936 / +61 432 801 745
dtasker@chapteroneadvisors.com.au /
abaker@chapteroneadvisors.com.au
22
ASX Announcement, 11 September 2023
23
ASX Announcement, 30 May 2024
12
Quarterly report to 30 September 2025
13
Quarterly report to 30 September 2025
Qualifying statements
General: The information in this report that relate to Exploration Information and Mineral Resources are based on
information compiled by Jacob Rebek and Ian Levy who are members of The Australasian Institute of Mining and
Metallurgy and the Australian Institute of Geoscientists. Mr Rebek and Mr Levy are qualified geologists and Mr Levy is
a director of ABx Group Limited.
Mainland: The information relating to Mineral Resources on the Mainland was prepared and first disclosed under the
JORC Code 2004. It has not been updated since to comply with the JORC Code 2012 on the basis that the information
has not materially changed since it was last reported. Mr Rebek and Mr Levy have sufficient experience, which is relevant
to the style of mineralisation and type of deposit under consideration and to the activity, which they are undertaking to
qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of exploration Results,
Mineral Resources and Ore Reserves. Mr Rebek and Mr Levy have consented in writing to the inclusion in this report of
the Exploration Information in the form and context in which it appears.
Tasmania: The information relating to Exploration Information and Mineral Resources in Tasmania has been prepared
or updated under the JORC Code 2012. Mr Rebek and Mr Levy have sufficient experience, which is relevant to the style
of mineralisation and type of deposit under consideration and to the activity, which they are undertaking to qualify as
a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves. Mr Rebek and Mr Levy have consented in writing to the inclusion in this report
of the Exploration Information in the form and context in which it appears.
The information relating to the latest REE Resources update is extracted from the report entitled “ABx Rare Earth
Resources Increase 70% to 89 Million Tonnes” dated 2 May 2024 and is available to view on
https://www.abxgroup.com.au/site/investor-information/asx-announcements.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the company’s market announcements and, in the case of estimates of Mineral Resources or Ore Reserves,
that all material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed.
The Company also confirms that the form and context in which the Competent Person’s findings are presented have
not been materially modified from the original market announcements.
Disclaimer Regarding Forward Looking Statements
This ASX announcement (Announcement) contains various forward-looking statements. All statements other than
statements of historical fact are forward-looking statements. Forward-looking statements are inherently subject to
uncertainties in that they may be affected by a variety of known and unknown risks, variables and factors which could
cause actual values or results, performance or achievements to differ materially from the expectations described in
such forward-looking statements.
ABx does not give any assurance that the anticipated results, performance or achievements expressed or implied in
those forward-looking statements will be achieved.
14
Quarterly report to 30 September 2025
Table 1: Tenement information required under LR 5.3.3 as at quarter end
Notes: No tenements were relinquished. All tenements are in good standing, 100% owned and not subject to
any third-party royalties nor are they encumbered in any way (*noting that subsequent to quarter end the
interest in the Queensland tenements reduced to a 30% interest following a transaction with Good Importing
International as announced 9 October 2025).
Information required under Listing Rule 5.3.1: Exploration expenditure reported during the quarter related to
the rare earth project development ($483,000), research conducted by ALCORE with respect to its reported
advancements ($122,000), and staff, administration and corporate costs ($470,000).
Information required under Listing Rule 5.3.2: No mining production was conducted during the quarter.
Information required under Listing Rule 5.3.5: The payments as disclosed in section 6.1 of the Appendix 5B
amounting to $105,000 relate to payment for Director’s fees and salaries.
Tenement No. Location
New South Wales
EL 9593 Taralga
EL 9664 Penrose Quarry
Queensland*
MLA 100277 Sunrise ML application
EPM 27787 Binjour
Tasmania
EL 7/2010 Conara
EL 9/2010 Deloraine
EL 18/2014 Prosser’s Road
EL 10/2021 Rubble Mound
EL 27/2022 Temple Bar
EL 28/2022 Triangle Flats
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
ABx Group Limited
ABN Quarter ended (“current quarter”)
14 139 494 885 30 September 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
1. Cash flows from operating activities
29 29
1.1 Receipts from customers
1.2 Payments for
- -
(a) exploration & evaluation
(b) research & development (122) (1,616)
(c) production - -
(d) staff costs (28) (248)
(e) administration and corporate costs (442) (992)
1.3 Dividends received (see note 3) - -
1.4 Interest received 9 54
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives 306 1,063
1.8 Other (provide details if material) - -
1.9 Net cash from / (used in) operating
activities
(248) (1,710)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) exploration & evaluation (483) (1,331)
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
2.2 Proceeds from the disposal of: - -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets (release of
MMI funds held-in-trust)
876 1,482
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (Security Deposit) (60) (74)
2.6 Net cash from / (used in) investing
activities 333 77
3. Cash flows from financing activities
2,900 2,900
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- 1,475
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(176) (237)
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (Advance received from Investors) - -
3.10 Net cash from / (used in) financing
activities
2,724 4,138
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
257 561
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(248) (1,710)
4.3 Net cash from / (used in) investing activities
(item 2.6 above) 333 77
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
2,724 4,138
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
3,066 3,066
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 3,066 167
5.2 Call deposits - 90
5.3 Bank overdrafts - -
5.4 Other - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
3,066 257
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
105
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities - -