Second High Purity Mixed Rare Earth Carbonate
Produced from Column Leach
Engage with this announcement on our interactive Investor Hub
ANSTO has produced second mixed rare earth carbonate (MREC) sample
product from Deep Leads deposit in northern Tasmania
Quality is even better than maiden MREC – more heavy rare earths and less of
the most important impurities
Results provide ABx with broad flexibility and scope for project optimisation
On behalf of ABx Group Limited (ASX: ABX) (ABx or the Company), the Australian Nuclear
Science and Technology Organisation (ANSTO) has produced the second mixed rare earth
carbonate (MREC) sample from the Deep Leads resource in northern Tasmania. This sample
was produced from the leachate generated in the recently reported column leach testwork.1
Compared to the maiden ABx MREC, this MREC contains even higher proportions of the most
valuable heavy rare earths, such as dysprosium (Dy) and terbium (Tb) (Table 1), and
significantly lower amounts of the key impurities, aluminium and iron.
Table 1: Proportions of REO in ABx MRECs. Full results in Table 2
Rare earth oxide (REO) Maiden MREC Second MREC
La2O3 17.5% 16.7%
CeO2 5.6% 1.1%
Pr6O11 + Nd2O3 28.3% 28.3%
Sm2O3 + Eu2O3 + Gd2O3 10.9% 12.0%
Tb4O7 + Dy2O3 4.6% 5.4%
Other HREO 5.2% 6.5%
Y2O3 27.8% 30.0%
Total 100.0% 100.0%
ABx Group Managing Director and CEO Mark Cooksey said:
“This is another example of the high purity MREC that can be produced from Deep Leads using the
simple three-step process that has been used commercially for many decades. Significantly, it
indicates that ABx can produce a high quality MREC using either a tank leach or a column leach.
This provides ABx with broad flexibility and scope for project optimisation.
1
ASX Announcement, 23 January 2026
ASX Announcement
16 March 2026
ASX: ABX
Figure 1: Second MREC sample
produced from Dee Leads
ASX announcement 16 March 2026
page 2
Bulk Sample Material
The source of the material for the MREC sample is a 100 kg bulk sample from trial pit DLP002
from the Deep Leads resource (Figure 1).2
Mixed Rare Earth Carbonate Product Quality
See Table 2 for detailed composition. Compared to the maiden ABx MREC, this MREC
contains even higher proportions of the most valuable heavy rare earths, such as
dysprosium (Dy) and terbium (Tb), and lower amounts of cerium (Ce), the least valuable rare
earth.
The most important impurities in MRECs are typically aluminium and iron. The levels of both
are incredibly low, with the iron below the detection limit.
The uranium and thorium contents are very low and similar to the maiden MREC, which has
already been shown to meet the exemption criteria for control as set by the International
Atomic Energy Agency.3
Next Steps
The second MREC enables ABx to provide samples to even more prospective customers and
offtake partners. The results are also valuable input to the engineering studies underway
with external experts.
Strategic Importance of MREC Production
Existing and prospective rare earth refineries are seeking high quality MRECs produced at
low cost. MRECs with high proportions of heavy rare earths such as Dy and Tb are in
particular demand because these elements have the most acute supply risk.4
ABx has
excellent prospects of meeting these requirements because:
1. ABx achieved high extractions at ambient temperatures and pressures with minimal
acid in a short time, which is likely to lead to lower cost and lower impurities in the
MREC product. For most clay-hosted rare earth deposits globally, minimal rare earth
extraction is achieved using these process conditions;
2. The ABx MREC has a significantly higher proportion of Dy and Tb compared to peers.
Magnet rare earth prices remain high, with Benchmark5
reporting Dy oxide (DDP
China) at over US$200/kg and Tb oxide (DDP China) at over US$900/kg. Furthermore,
CIF Europe prices for Dy and Tb are over four times higher than Chinese domestic
prices, illustrating the potential premium for non-China sources of rare earths.
2
ASX Announcement, 6 August 2025
3
ASX Announcement, 2 March 2026
4
ASX Announcement, 23 April 2025
5
Benchmark Mineral Intelligence, 5 March 2026
ASX announcement 16 March 2026
page 3
ABx has already executed a Memorandum of Understanding with Ucore Rare Metals Inc.
(TSXV: UCU) (OTCQX: UURAF),6
which is focussed on rare-earth processing facilities in North
America, and ABx is also in discussions with additional potential offtake partners.
ABx Rare Earth Resource
The Deep Leads – Rubble Mound and Wind Break discoveries contain a resource estimate of
89 million tonnes7
averaging 844 ppm total rare earth oxides (TREO). The resource contains
36 ppm Dy+Tb (Dy+Tb is 4.4% of TREO), the highest of any ionic clay deposit in Australia and
among the highest globally.8
This resource estimate has been defined from only 29% of the project’s mineralised outline.
This announcement is approved for release by the board of ABx Group Limited.
Go to the ABx Investor Hub to watch a video of this announcement and ask any questions of
management.
For further information please contact:
Dr Mark Cooksey
MD & CEO
ABx Group
+61 447 201 536
mcooksey@abxgroup.com.au
www.abxgroup.com.au
Media
Chapter One Advisors
David Tasker / Alex Baker
+61 433 112 936 / +61 432 801 745
dtasker@chapteroneadvisors.com.au /
abaker@chapteroneadvisors.com.au
About ABx Group Limited
ABx Group Limited (ABx) is a uniquely positioned Australian company delivering materials
for a cleaner future.
The three priority projects are:
• Heavy rare earths: Supplying light and heavy rare earths from Tasmania into
Western supply chains
o Maiden mixed rare earth carbonate produced
o Processing Options Analysis conducted in partnership with external experts
• Clean fluorine chemical production: Producing industrial chemicals from
aluminium smelter by-product (ALCORE)
o Continuous pilot plant under construction in Bell Bay, Tasmania
6
ASX Announcement, 4 September 2024
7
41 Mt inferred, 42 Mt indicated and 6 Mt measured
8
ASX Announcement, 2 May 2024
ASX announcement 16 March 2026
page 4
• Near-term bauxite production: Mining bauxite resources for the aluminium,
cement and fertiliser industries
o Agreements executed with Good Importing International for bauxite projects
in Queensland and New South Wales, and $2.7 million initial payment has
been received
o Approvals well advanced for DL130 bauxite project in northern Tasmania
ABx endorses best practices on agricultural land and strives to leave land and environment
better than we find it. We only operate where welcomed.
Disclaimer Regarding Forward Looking Statements
This ASX announcement (Announcement) contains various forward-looking statements. All
statements other than statements of historical fact are forward-looking statements.
Forward-looking statements are inherently subject to uncertainties in that they may be
affected by a variety of known and unknown risks, variables and factors which could cause
actual values or results, performance, or achievements to differ materially from the
expectations described in such forward-looking statements.
ABx does not give any assurance that the anticipated results, performance, or achievements
expressed or implied in those forward-looking statements will be achieved.
Competent Persons Statement
The information in this report that relate to Exploration Information and Mineral Resources
are based on information compiled by Ian Levy who is a member of The Australasian
Institute of Mining and Metallurgy and the Australian Institute of Geoscientists. Mr Levy is a
qualified geologist and a director of ABx Group Limited.
Mr Levy has sufficient experience, which is relevant to the style of mineralisation and type of
deposit under consideration and to the activity, which he is undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of
exploration Results, Mineral Resources and Ore Reserves. Mr Levy has consented in writing
to the inclusion in this report of the Exploration Information in the form and context in which
it appears.
ASX announcement 16 March 2026
page 5
Appendix
Mixed Rare Earth Carbonate (MREC) Production
This MREC was produced using the standard three-step process for ionic rare earths:
leaching, impurity removal and precipitation. The leaching was via a column leach with
conditions as follows:9
• Ore was homogenised and screened at 10 mm, followed by agglomeration to a
10 mm feed to consolidate fines and ensure suitable bed structure and permeability
• Two identical columns, each 2.4 metres high and 150 mm in diameter (Figure 1)
• Approximately 26 kg of ore per column to a ‘bed height’ of 2m
• Two ammonium sulfate (AMS) leachate concentrations:
o Test C1: 0.30 M ammonium sulfate
o Test C2: 0.15 M ammonium sulfate
• Irrigation rate of ore with leachate: 5.0 L/m²/hour (approximately 2.12 L / day)
• Ambient temperature (~21°C ambient conditions)
• Target pH: 4.0 (actual feed pH ~3.8).
• Test duration: 24 days
• Discharge liquor collected daily (except Sunday) and stored separately
• Post-test treatment: Column flushed with 8 L of tap water at 15 L/m2
/hour (~30hrs).
Column allowed to discharge under gravity for >13-15 days. Solid residue discharged
(Figure 1)
Following the column leaching, all discharge liquor from both columns was combined to
produce 95L of rare earth enriched liquor.
Impurity removal was performed by addition of 150 g/l ammonium bicarbonate solution to
the liquor to achieve a target pH 6.2 and allowing 30 minutes for impurity precipitation. The
solution was filtered to separate the clean liquor from the minor residue.
Rare earth precipitation was achieved by further addition of the ammonium bicarbonate
solution to achieve a target pH of 7.5 which was held for 2 hours. The MREC product was
separated from the barren liquor by filtering and flushing to ensure maximum recovery. The
damp filter cake was dried at 55°C to produce119g of MREC. A sub-sample of the MREC is
undergoing gamma-counting to determine its total radioactivity, with results expected in
May.
9
ASX Announcement, 23 January 2026
ASX announcement 16 March 2026
page 6
Table 2: Normalised1
composition of ABx MRECs (wt%)
Oxide Maiden MREC10
Second MREC Chinese Standard2
REO La2O3 16.90 15.79 -
CeO2 5.36 1.07 -
Pr6O11 4.93 4.84 -
Nd2O3 22.33 21.88 -
Sm2O3 4.47 4.67 -
Eu2O3 1.22 1.55 -
Gd2O3 4.84 5.09 -
Tb4O7 0.64 0.74 -
Dy2O3 3.83 4.36 -
Ho2O3 0.77 1.02 -
Er2O3 2.20 2.60 -
Tm2O3 0.27 0.36 -
Yb2O3 1.58 1.90 -
Lu2O3 0.22 0.28 -
Y2O3 26.80 28.28 -
TREO 96.37 94.42 93.4
NdPr3
27.26 26.71 -
DyTb3
4.47 5.10 -
Impurities Al2O3 0.45 0.084 1.5
CaO 0.52 1.93 -
Fe2O3 0.21 <0.002 -
MgO 0.030 <0.026 -
SiO2 0.67 0.19 1.5
SO4 1.48 2.95
U3O8 0.0057 0.0062 -
ThO2 <0.002 <0.002 -
Total4
3.63 5.58 -
1
MREC is normalised to MREO by calculating the expected product composition after calcination to a moisture-
free and hydration-free mixed oxide state, i.e. containing only rare earth oxides and impurity oxides
2
Chinese Standard has been normalised to remove 1.5% loss on ignition
3
NdPr = Pr6O11 + Nd2O3, DyTb = Tb4O7 + Dy2O3
4
Includes other impurities not individually listed
10
ASX Announcement, 2 December 2025
ASX announcement 16 March 2026
page 7
Figure 2: Trial pit locations at Deep Leads
Table 3: Summary of sampling information referred to above, in accordance with LR 5.8.1
Geology and geological interpretation REE mineralisation occurs in clay layers that overlie a Jurassic age dolerite
basement in a district with some residual weathered Tertiary age alkali
basalt.
Sampling and sub-sampling techniques Pit sampling was done at 1 metre intervals using a large excavator with an 8
metre boom.
Subsampling of ~100kg was performed by fractional shovelling. This sample
was lightly disaggregated and hand-screened at 10mm without drying.
Drilling techniques Not applicable (N.A.). Bulk pit sampling by excavator
Criteria usedfor resource classification, drill&
data spacing & distribution.
N.A.
Sample analytical method Assay samples are analysed by standard NATA-approved induction coupled
plasma analytical methods for rare earth elements at ALS labs in Brisbane
(method ME-MS81). Interlab comparisons were satisfactory.
Estimation methodology, cut-off grade,
mining, metallurgy & other modifying
factors
All N.A.
ASX announcement 16 March 2026
page 8
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling
• Include reference to measures taken to ensure sample
representivity
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• Industry standard work:
• Bulk pit dug by excavator
• Samples taken at 1 metre intervals by
cleaning pit at the metre interval, then
taking full 1 metre slice for the samples.
• Subsampling the metre samples done as per
ISO bauxite sampling processes
Drilling
techniques
• Drill type • Not applicable to bulk pits excavated by
excavator with 8 metre boom
Drill sample
recovery
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Not applicable to bulk pits
Logging • Whether samples have been geologically and geotechnically
logged to an appropriate level for metallurgical studies.
• Whether sampling is qualitative or quantitative.
• Totallength&percentageoftherelevantintersectionslogged.
• Pits sampled, assayed, logged, photographed &
& stored to ISO standards. See below
• All8metreswasloggedandsampled
• Depth 5m to 6m selected – see below
Sub-
sampling
techniques
andsample
preparation
• If core, whether cut or sawn, quarter, half or all core.
• If non-core, sample method, whether sampled wet or dry.
• Nature, quality & appropriateness of the sample preparation.
• Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
• Measures taken to ensure that the sampling is representative
of the in situ material collected, including for instance results
for field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the
material being sampled.
• Depth 5m to 6m selected for the sample to
be used to produce a mixed carbonate rare
earth carbonate (MREC)
• 100kg sub-sample obtained by
homogenisation and fractional shovelling on
a tarp followed by light disaggregation and
hand-screening at 10mm. Manually
identified clasts (<5% of sample) were
removed by hand.Separatesubsamples
assayedthesame
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
• Geophysical tools, spectrometers, handheld XRF instruments,
etc, the parameters used in determining the analysis
• Nature of quality control procedures adopted.
• Assaying done by NATA-registered ALS
laboratories, Brisbane
• N.A. Assays are by ALS which is a major
mineral laboratory
• ALS is industry-standard and publishes its
QA/QC protocols and results on its website
Verification
of sampling
and
assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Pit sampling supervised by 4 ABx senior staff
– see Competent Person & Expert
Statement for details.
• Repeated subsampling assayed the same.
• Metal assays from ALS converted to oxides
as per industry standards for reporting
Location of
data points
• Accuracy & quality of surveys used to locate drill holes & pits.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Location by GPS
• Pit DLP002 location: 477720E , 5410126N
(WGS 84 56S grid). RL 287.675m by LiDAR.
Data
spacing and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient.
• Whether sample compositing has been applied.
• Bulk pit sampling at 1m intervals considered
appropriate and sufficient
Orientationof
datainrelation
togeological
structure
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
• Does the drilling orientation introduce a sampling bias
• Vertical bulk pit sampling is appropriate for
the horizontal layers of REE mineralisation
Sample
security
• The measures taken to ensure sample security. • Chain of custody protocols were applied to
secure the bulk bag samples.
Audits or
reviews
• The results of any audits or reviews of sampling techniques
and data.
• Two bulk samples taken simultaneously
assayed the same
ASX announcement 16 March 2026
page 9
Section 2 Reporting of Exploration Results (Criteria listed in preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement
and land
tenure status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
• Security of tenure and impediments to obtaining a licence to operate.
• EL7/2010 100% owned and
unencumbered. Pit located in a
pine plantation with approvals
from owner and government
agencies.
Explorationby
otherparties
• Acknowledgment and appraisal of exploration by other parties. • ABx sole discoverer and first to
explore this area.
Geology • Deposit type, geological setting and style of mineralisation. • REE mineralisation occurs in clay
layers that overlie a Jurassic age
dolerite basement in a district
with some residual weathered
Tertiary age alkali basalt.
Drill hole
Information
• Summary of information for understanding exploration results including a
tabulation of the following information for all material drill holes:
o easting and northing of thedrillhole collar
o elevation or RL (Reduced Level –elevation above sea level in metres)
o dip and azimuth of thehole
o down hole length and interception depth
o hole length.
• If exclusion of this information is justified, the Competent Person should
clearly explain why this is the case.
• Pit DLP002 location:
477720E ,
5410126N
(WGS 84 56S grid).
RL 287.675m by LiDAR.
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (eg cutting of high grades) and cut-off
grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade results
and longer lengths of low grade results, the procedure used for such
aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values should be
clearly stated.
• No aggregation or any cutting
of assays done
• Metal assays from ALS
converted to oxides as per
industry standards for
reporting
Relationship
between
mineralisation
widths &
intercept
lengths
• These relationships are particularly important.
• If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.
• If it is not known and only the down hole lengths are reported, there should be
a clear statement to this effect (eg ‘down hole length, true width not known’).
• Vertical bulk pit sampling is
appropriate for the horizontal
layers of REE mineralisation
Diagrams • Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These should
include, but not be limited to a plan view of drill hole collar locations and
appropriate sectional views.
• See report
Balanced
reporting
• Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should
be practiced to avoid misleading reporting of Exploration Results.
• All data to date is reported in
this report
Other
substantive
exploration
data
• Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious or
contaminating substances.
• All data to date is reported in
this report
Further
work
• The nature and scale of planned further work (eg tests for lateral extensions
or depth extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions, including the
main geological interpretations and future drilling areas, provided this
information is not commercially sensitive.
• ANSTO labs are engaged to
undertake the processing on
the 100kg sample to produce a
mixed rare earth carbonate
(MREC)