Annual Report to shareholders
Released
Released
Announcement PDF
ABX Group Limited
ABN 14 139 494 885
Annual Report - 31 December 2023
ABX Group Limited
Contents
31 December 2023
Corporate directory
Chairman's letter
Review of Operations
Directors' report
Auditor's independence declaration
Statement of profit or loss and other comprehensive income
Statement of financial position
Statement of changes in equity
Statement of cash flows
Notes to the financial statements
Directors' declaration
Independent auditor's report to the members of ABX Group Limited
Shareholder information
1
2
3
5
13
26
27
28
29
30
31
52
53
56
ABX Group Limited
Corporate directory
31 December 2023
Directors
Paul Lennon (Non-Executive Chairman)
Ian Levy (Non-Executive Director)
Ken Boundy (Non-Executive Director)
Dr Mark Cooksey (Managing Director & CEO)
Joint company secretary
Mathew Watkins
Registered office
Level 4, 100 Albert Road
South Melbourne, VIC 3205
Principal place of business
Level 4, 100 Albert Road
South Melbourne, VIC 3205
Telephone: +61 3 9692 7222
Fax: +61 2 9956 7355
Website: www.abxgroup.com.au
Share register
Computershare Investor Services Pty Limited
Level 3, 60 Carrington Street
Sydney NSW 2000
Telephone: 1300 850 505
Auditor
K.S. Black & Co.
Level 5, 350 Kent Street
Sydney NSW 2000
Telephone: +61 2 8839 3000
Bankers
Australia & New Zealand Banking Group Limited
20 Martin Place
Sydney NSW 2000
Telephone: +62 2 9227 1818
St George Bank Limited
Level 14, 182 George St
Sydney NSW 2200
Telephone: +61 2 9236 2230
Stock exchange listing
ABX Group Limited shares and options are listed on the Australian Securities
Exchange (ASX code: ABX & ABXO)
2
ABX Group Limited
Chairman's letter
31 December 2023
CHAIRMAN’S LETTER
Dear fellow shareholders,
It is with great pleasure that I provide a review of ABx Group’s activities throughout 2023, a year in which our company took
significant strides forward in progressing work programs across our rare earth, Alcore and bauxite projects.
Before I do, I would like to sincerely thank our existing shareholders for their ongoing support in the company and in our board
and management. For new shareholders, I welcome you to the Company and look forward to what I hope to be a very active,
eventful, prosperous, and exciting year ahead for ABx.
It was a year of significant milestones at our rare earth project in northern Tasmania both in terms of exploration activity and
in continuing to develop the ionic adsorption clay resource.
In another significant step towards commercial assessment, we completed with our consultants the first comprehensive block
model resource estimation of the Deep Leads-Rubble Mound rare earth resource. The estimate saw a significant increase in
the size of the deposit to 52 million tonnes at 817 ppm of total rare earth oxides (TREO). It is testament to the Tasmanian team
that they increased this resource by more than 10-fold since announcing a 3.9 million tonnes maiden resource in November
2022.
Importantly, the block model also confirmed four high-grade rare-earth zones in accessible sites that warrant infill drilling. The
resource is exceptionally enriched in permanent magnet rare earths, especially dysprosium and terbium, which are highly
valuable, have the highest supply risk and are almost exclusively produced from ionic adsorption clay rare earth deposits.
On the exploration front, we undertook several rare earth drilling campaigns that yielded exceptional results. This included our
highest-grade intersection ever of 17,333ppm TREO, four times higher than our previous highest-grade rare earth result.
In addition, desorption tests conducted by ANSTO on samples from the Deep Leads and Rubble Mound deposits reported up
to 83% extraction of rare earth, the highest extractions from any clay-hosted REE prospect in Australia.
Our 83%-owned Alcore business is in the process of developing industry-leading technology that processes aluminium smelter
waste, known as ’excess bath’, into high value products such as aluminium fluoride, an essential chemical for aluminium
production.
During 2023, Alcore significantly progressed with developing its pilot plant at the Alcore Technology Centre in Berkeley Vale,
NSW. We completed the initial preliminary engineering design for the continuous pilot plant, and fully installed and
commissioned the bath pilot batch reactor. This reactor, which was ordered from a specialised international supplier, features
state-of-the-art technology to enhance process mixing and features a process capacity ten times larger than our previous bath
laboratory reactor.
If the pilot batch reactor achieves its designed high yield of fluorine from the aluminium smelter waste, it will:
1. Give further confidence that the continuous pilot plant and first commercial plant will perform as designed
2. Enable further development work to be conducted on processing and market evaluation of the metal sulfate coproducts
To date, we have successfully conducted five test runs under standard processing conditions which have provided Alcore with
valuable insights into the design of the continuous pilot plant. We are awaiting assay results from the fourth and fifth test runs.
Meanwhile, commercial discussions with potential investors have included the possibility of locating the continuous pilot plant
at an alternative, superior site, instead of the Alcore Technology Centre. Ordering of pilot plant reactors has been deferred
until those commercial discussions are resolved.
In 2023, we continued to pursue the excellent potential at our bauxite projects in Tasmania and Queensland.
3
ABX Group Limited
Chairman's letter
31 December 2023
The signing of a five-year agreement with Adelaide Brighton Cement Limited (ABCL), a subsidiary of Adbri Limited, for the
supply of cement-grade bauxite to ABCL’s South Australian operations was a significant endorsement of the suitability of the
bauxite from our DL130 Bauxite Project in Tasmania for the broader cement industry.
Importantly, regular mining operations to supply ABCL will increase ABx’s ability to secure additional customers, for which
there are active discussions. Start of mining is anticipated for Q3 2024.
At the Sunrise bauxite project in Queensland, we progressed an internal review of the Binjour mine plan with selection of the
preferred mining schedule and infrastructure layout. Our application to modify the Bundaberg port site boundary is being
progressed by the Department of Resources. Scheduling of the planned environmental studies at the mine and port sites are
continuing. We envisage commencing exporting product from Sunrise in H2 2025.
In summary, the Company is looking forward to delivering strong news flow throughout 2024 as we progress our rare earth,
Alcore and bauxite operations, and I want to thank the Board and ABx staff for their dedication and hard work in progressing
each of these businesses. I am very confident that 2024 will be another strong year for ABx and I look forward to sharing our
progress with you all.
Yours faithfully,
Paul Lennon
4
ABX Group Limited
Review of Operations
31 December 2023
REVIEW OF OPERATIONS
ABx Group (ABx) is a uniquely positioned, high-tech Australian company delivering materials for a cleaner future.
The two current areas of focus are:
Creation of an ionic adsorption clay rare earth project in northern Tasmania
Establishment of a plant to produce hydrogen fluoride and aluminium fluoride from recycled industrial waste, to replace
imports (ALCORE)
There is also a legacy business:
Mining and enhancing bauxite resources for cement, aluminium and fertiliser production
ABx endorses best practices on agricultural land, strives to leave land and environment better than we find it. We only operate
where welcomed.
2023 will be remembered as a noteworthy year for ABx due to the following:
Rare Earth Elements Exploration
ABx is the first company to discover rare earths in Tasmania, and has the highest reported extractions under relatively neutral
conditions from any clay-hosted rare earths project in Australia.
During the period, ABx reported an increase in the mineral resource estimate to 52 million tonnes averaging 817 ppm TREO
and 633 ppm TREO-CeO2. The resource has the highest proportion of dysprosium and terbium (Dy+Tb is 4.4% of TREO) of
any clay-hosted rare earths resource in Australia.
Multiple drilling programs were conducted during the period. The most recent 66-hole drilling program conducted from October
to December 2023 was designed to test step-out locations from ABx’s previous drilling campaign, which intersected the highest
assays to date. Initial drilling was conducted at the Wind Break deposit, the first drilling program dedicated to rare earths at
this location, while the remainder of the drilling program was conducted at the northern extensions of the Deep Leads – Rubble
Mound resource.
ALCORE: Aluminium fluoride for aluminium smelters
Alcore has developed a world-first process to recover hydrogen fluoride from aluminium smelter bath. It intends to construct
commercial hydrogen fluoride and aluminium fluoride plants in Bell Bay, Tasmania.
During the period, Alcore commissioned and commenced operations using the bath pilot batch reactor. Three test runs were
completed under standard process conditions with hydrogen fluoride gas successfully produced throughout each of the runs.
While lower-than-expected fluorine recovery rate was achieved in the third test run, Alcore undertook a fourth test run in late
January utilising newly commissioned equipment to allow feed bath particle size to be controlled. Alcore remains confident
results from this test run and subsequent test runs will achieve a higher recovery rate.
Progressing Bauxite Operations
The ABx strategy is to selectively produce metallurgical grade, cement grade and fertiliser grade bauxite, with a focus on
profitability.
An agreement was executed with Adelaide Brighton Cement Limited (ABCL), a subsidiary of Adbri Limited (ASX:ABC), for the
supply of cement-grade bauxite to ABCL’s Birkenhead cement manufacturing operation in South Australia.
The agreement forecasts supply of 90,000-120,000 tonnes of bauxite over a five-year term, with commencement of mining
now expected in Q3 2024. The bauxite sale price has been agreed for the first shipment and is satisfactorily profitable and
commercial-in-confidence. The sale price is to be negotiated for subsequent shipments. ABCL has the option to extend the
term for a further five years.
5
ABX Group Limited
Review of Operations
31 December 2023
Rare Earth Elements Exploration
Rare earths have many applications in a wide variety of industries. Permanent magnets are the most valuable application,
representing over 90% of the total value of rare earths demand. Permanent magnets are used in electric vehicles, wind
turbines, smartphones and military applications. The four most important rare earths for permanent magnets are neodymium,
praseodymium, dysprosium and terbium. The demand for these four rare earths is predicted to grow significantly in coming
years, potentially leading to significant supply shortfalls. The supply risk is highest for dysprosium and terbium, the two heavy
rare earths in permanent magnets.
Globally, most rare earths are sourced from mineral deposits. These typically require large, costly processing plants and a
significant lead time to reach production.
A less common source of rare earths is ionic adsorption clay (IAC) deposits, which have historically been mined only in
southern China. A major advantage of IAC deposits is that the rare earths can be extracted from the clay via a low-cost
desorption process. Secondly, they often exist at shallow depth. These factors mean that the minimum viable project for an
IAC project is typically significantly smaller than for a mineral project. Crucially, this means that much less capital, time and
risk is typically required to deliver a cash-flow positive IAC project compared to a mineral project. Furthermore, IAC deposits
typically contain a higher proportion of heavy rare earths compared to hard rock deposits, and low concentrations of radioactive
elements such as uranium and thorium.
ABx is the first company to discover rare earths in Tasmania and has reported a JORC-compliant mineral resource of 52
million tonnes at its Deep Leads / Rubble Mound project1.
ABx engaged Australian Nuclear Science and Technology Organisation (ANSTO) to conduct desorption tests, which found
the highest extractions under relatively neutral conditions reported from any clay-hosted project in Australia2,3. This proves the
mineralisation to be of the IAC type. Low-cost processing is crucial for clay-hosted rare earth deposits, and industry processing
experts indicate that low-cost processing can only be achieved using desorption with low acid consumption. Additionally, the
rare earths in the Deep Leads / Rubble Mound resource have the highest proportion of dysprosium and terbium (Dy+Tb is
4.4% of TREO) of any clay-hosted rare earths resource in Australia. Furthermore, the level of radioactive elements is very low
(2 ppm U2O3 and 6 ppm ThO). These factors put ABx at the forefront for customers and countries seeking to diversify rare
earths supply.
The ABx strategy is to produce a mixed rare earth carbonate (MREC) that can be sold to rare earth separation plants, which
produces separated rare earth oxides. The ABx MREC will be high in heavy rare earths and low in radioactive elements, which
is expected to be attractive to many prospective customers. Market discussions with several potential customers endorse this
strategy.
During 2023, ABx undertook several REE drilling campaigns that yielded exceptional results. This included the Company’s
highest-grade intersection ever of 17,333ppm TREO, four times higher than the previous highest-grade rare earth result.
ABx and its consultants completed the first comprehensive block model resource estimation of the Deep Leads-Rubble Mound
rare earth resource. The resource estimate currently stands at 52 million tonnes averaging 817 ppm TREO and 633 ppm
TREO-CeO2 at a cut-off grade of 350 ppm TREO-CeO2. The rare earth grades for the resource estimate are shown in Table
1. The resource model was based on data from 407 drillholes across the resource area and covered 39% of the identified
mineralised outline. Furthermore, because it models all intercepts to date, the resource estimate highlights four high grade
zones that warranted follow-up.
Towards the end of the year, ABx Group carried out a 66-hole drilling program to test step-out locations from previous drilling
campaigns initially targeting the Wind Break deposit – the first drilling program dedicated to rare earths at this location – with
the remainder of the program conducted at the northern extensions of the Deep Leads – Rubble Mound resource.
1
45 Mt inferred and 7 Mt indicated
ASX announcement, 31 May 2022
3
ASX announcement, 2 February 2023
2
6
ABX Group Limited
Review of Operations
31 December 2023
Post period end4, results received from the 30-hole campaign conducted at Wind Break returned thick, clay-hosted high grade
REE and confirmed ABx’s northern Tasmanian exploration target area exceeded 100 km2. The drilling campaign is continuing
on the high-grade Rubble Mound and extensions of the Deep Leads zone with assay results anticipated shortly.
Table 1: Mineral resources at Deep Leads – Rubble Mound (350 ppm TREO-CeO2 cut-off grade)
Figure 1: Map of block model showing the zones of high REE enrichment as the purple, red and orange blocks
4
ASX announcement, 22 January 2024
7
ABX Group Limited
Review of Operations
31 December 2023
Figure 2: Location of ABx Exploration Projects in northern Tasmania
The Company was also granted two significant exploration licences covering the southwards extensions of the Portrush
discovery near Launceston.5 The two tenements, EL27/2022 and EL28/2022, total 483 km2 and were granted for an initial
term of 5 years. They are located ~52 km east of ABx’s major Deep Leads / Rubble Mound project, and secure the southwards
extension of the high grade Portrush deposit. These two large exploration licences significantly increase our rare earths
exploration footprint in Tasmania to almost 600 km2.
ALCORE: Aluminium fluoride for aluminium smelters
Hydrogen fluoride is an essential chemical for the production of fluorocarbons and aluminium fluoride. Aluminium fluoride is
an essential chemical for aluminium metal production. Fluorine has been recently added to Australia’s critical minerals list.
Hydrogen fluoride is mainly produced from fluorspar, which is obtained from the mineral fluorite. Fluorspar is relatively high
cost and has been identified as a critical material by the USA, Europe, Japan and Canada.
Australia does not mine any fluorite, or produce any fluorspar, hydrogen fluoride or aluminium fluoride, and so must import all
its requirements. The Australian demand for hydrogen fluoride is small, and it is imported at high cost. Conversely, Australia
is a significant producer of aluminium and so its demand for aluminium fluoride is high.
Australia is the largest producer of primary aluminium metal without its own domestic aluminium fluoride production, so
Australian aluminium smelters rely entirely on imported aluminium fluoride. This is typically more than 80% from China, but
this proportion was only 40% in 2021 when China production was lower, illustrating the supply risks. The median aluminium
fluoride price (FOB China) for the last two years is over US$1,400/t (Figure 3).
Most modern aluminium smelters produce excess bath, for which the only meaningful market is new smelters, which require
bath to commence operations. Aluminium industry forecasts suggest that the global bath market will increasingly be in surplus,
because far fewer new smelters are being constructed. All of the major global aluminium producers are eager for alternative
applications for excess bath, to avoid the unpalatable options of on-site storage or landfill.
ALCORE has developed a world-first process to recover hydrogen fluoride from aluminium smelter bath. This is combined
with aluminium hydroxide to produce aluminium fluoride. ALCORE is also investigating the use of dross (another aluminium
5
ASX announcement, 26 September 2023
8
ABX Group Limited
Review of Operations
31 December 2023
smelter waste) and bauxite as alternatives to aluminium hydroxide as the source of aluminium. The use of dross or bauxite
would further lower the production cost.
ALCORE intends to construct commercial hydrogen fluoride and aluminium fluoride plants in Bell Bay, Tasmania. The
aluminium source for the initial aluminium fluoride production is likely to be aluminium hydroxide, as this is lower risk and
allows a faster path to production. Subsequent production may use aluminium from dross or bauxite to further improve the
financial and environmental outcomes.
The initial plant is proposed to transform 1,600 tonnes per year of aluminium smelter bath into hydrogen fluoride and other
industrial chemicals. A proportion of the hydrogen fluoride will be further processed to aluminium fluoride. The relative amounts
of hydrogen fluoride and aluminium fluoride produced can be optimised to suit market demand. In 2022, ALCORE received a
$7.6 million grant from the Australian Government’s Modern Manufacturing Initiative (MMI) to support this plant. ALCORE is
matching grant funding dollar-for-dollar for the project.
ALCORE’S longer term plan is to expand the plant by 15 times, which will process all of Australia’s aluminium smelter bath
and supply more than 80% of Australia’s aluminium fluoride requirements.
Figure 3: Aluminium fluoride monthly prices FOB China (source: China Customs Statistics)
During 2023, ALCORE significantly progressed the development of its pilot plant at the ALCORE Technology Centre in
Berkeley Vale, NSW. The bath pilot batch reactor fully installed and commissioned (Figure 4). This reactor features state-ofthe-art technology to enhance process mixing. Following engineering design by ALCORE, it was ordered from a specialised
international supplier in late March. It features a process capacity ten times larger than the bath laboratory reactor. If the pilot
batch reactor achieves its designed high yield of fluorine from the aluminium smelter waste, it will:
Give further confidence that the continuous pilot plant and first commercial plant will perform as designed; and
Enable further development work to be conducted on processing and market evaluation of the metal sulfate co-products.
During the year, three test runs were completed under standard processing conditions with a further two completed post end
of period. All test runs have provided ALCORE with valuable insights into the design of the continuous pilot plant. ALCORE is
currently awaiting assay results from the fourth and fifth test runs.
9
ABX Group Limited
Review of Operations
31 December 2023
While the third test run results returned a lower-than-expected fluorine recovery rate due to large bath feed particle size,
ALCORE had commissioned equipment to allow feed bath particle size to be controlled. This equipment was utilised during
the fourth test run undertaken in late January. ALCORE remains confident results from this test run and subsequent test runs
will achieve a higher recovery rate.
Initial preliminary engineering design for the continuous pilot plant was completed.
Meanwhile, commercial discussions with potential investors have included the possibility of locating the continuous pilot plant
at an alternative, superior site, instead of the ALCORE Technology Centre. Ordering of pilot plant reactors has been deferred
until those commercial discussions are resolved.
ALCORE received $5.7 million in two instalments6 from the $7.6 million grant from the Australian Government’s Modern
Manufacturing Initiative (MMI) that was awarded in 20227. This is to support ALCORE’s proposed $16.4 million aluminium
smelter bath recycling plant in Bell Bay, Tasmania. ALCORE is matching grant funding dollar-for-dollar for the project.
Figure 4: Third run of bath pilot batch reactor under standard process conditions
Bauxite Operations
The ABx strategy is to selectively produce metallurgical grade, cement grade and fertiliser grade bauxite, with a focus on
profitability. In 2023, the Company continued to pursue the excellent potential at its bauxite projects in Tasmania and
Queensland.
The largest project is Binjour, with a JORC compliant resource of 37 million tonnes8, supporting 20-25 years production. In
February 2022, ABx entered a JV with Alumin for the development of the Sunrise Bauxite Project, comprising a bauxite mine
6
ASX Announcement, 28 June 2023
ASX Announcement, 29 April 2022
8
ABX ASX Announcement, 18 June 2018; 14 Mt inferred and 23 Mt indicated
7
10
ABX Group Limited
Review of Operations
31 December 2023
at Binjour plateau and port operations at Bundaberg in Queensland . Alumin is an Australian special purpose vehicle company
associated with our strategic marketing partner, Rawmin India, having extensive experience in funding long term sustainable
investments in projects involving mining and bulk-shipping of metallurgical grade bauxite to end users around the world.
It is anticipated that the mine at Binjour will export 500,000 tonnes per year of metallurgical grade bauxite in its first year of
production, then scale up to full operational capacity of 1.5 million tonnes per year. ABx has reforecast its timeline to begin
exporting of product in H2 2025.
In Tasmania, ABx has three bauxite deposits and has previously mined at Bald Hill near Campbell Town. ABx plans to
recommence bauxite mining in Tasmania by Q2 2024, at the DL130 Bauxite Project. The primary products are likely to be
cement grade and fertiliser grade bauxite.
DL130 Project, Tasmania
An agreement was executed with Adelaide Brighton Cement Limited (ABCL), a subsidiary of Adbri Limited (ASX:ABC), for the
supply of cement-grade bauxite to ABCL’s Birkenhead cement manufacturing operation in South Australia.9
The agreement forecasts supply of 90,000-120,000 tonnes of bauxite over a five-year term. The bauxite sale price has been
agreed for the first shipment and is satisfactorily profitable and commercial-in-confidence. The sale price is to be negotiated
for subsequent shipments. ABCL has the option to extend the term for a further five years.
It is understood that ABCL has used a trial shipment of ABx bauxite material in its cement manufacturing operation with no
significant issues.
During the period, the EPA approved the Environmental Effects Report (EER) for the mine lease application. While some
aspects of the application were taking longer than planned, these are not major issues and they should all be straightforward
to resolve with commencement of mining anticipated for Q3 2024.
In addition, 390 tonnes of bauxite was excavated from a trial pit and provided to a separate customer, with a further 600 tonnes
excavated in January.
Sunrise Project, Queensland
ABx Group progressed an internal review of the Binjour mine plan with selection of the preferred mining schedule and
infrastructure layout.
The Company’s application to modify the Bundaberg port site boundary is being progressed by the Department of Resources.
Scheduling of the planned environmental studies at the mine and port sites are continuing.
Corporate
Placement and Share Purchase Plan
ABx Group securities totalled 242,340,314 ordinary shares and group available cash was $5.86 million (including restricted
cash of $5.52 million) at 31 December 2023.
On 13 September 2023 the Company raised $1,500,000 capital via placement of 18,750,000 ordinary shares at $0.08 per
share to professional and sophisticated investors ('Investors'). In addition, the Company issued 9,375,000 free attaching
options (at an exercise price of $0.12 each and expiring on 6 September 2025) to the Investors, representing one free attaching
option for every two shares subscribed.
On 4 December 2023, the Company launched a share purchase plan ("SPP") to raise up to $500,000 to eligible shareholders
of the Company, with one free attaching option (at an exercise price of $0.12 each and expiring on 6 September 2025) (“SPP
Options”) for every two shares applied under the SPP. The SPP price was $0.08 per share. The SPP was closed on 21
December 2023 with over subscription of $115,900. 7,699,500 shares were issued on 2 January 2024 and the 3,849,750 SPP
Options were issued on 14 February 2024 following shareholder approval at a general meeting held on 14 February 2024.
During the period, ABx Group commenced disclosing environmental, social and governance (ESG) metrics using the
internationally accepted Stakeholder Capitalism Metrics developed by the World Economic Forum. The Company subscribed
to Socialsuite’s reporting platform to assist with monitoring and disclosing progress against these ESG metrics.
9
ASX announcement, 11 September 2023
11
ABX Group Limited
Review of Operations
31 December 2023
Risks
The Group’s operating and financial results and performance are subject to various risks and uncertainties, some of which are
beyond the Group’s reasonable control. Set out below are matters which the Group has assessed as having the potential to
have a material impact on its operating and/or financial results and performance:
1) Fluctuations in external economic drivers including macroeconomics and metal prices: The Group’s primary
focus is the advancement of its rare earth, Alcore and bauxite projects. Fluctuations in the relevant commodity prices
can result from various aspects beyond the Group’s control, including macroeconomic and geopolitical. Sustained
lower commodity prices would adversely impact the viability of the projects.
2) Failure to discover mineral resources and convert to ore reserves: Exploration activities are speculative in nature
and often require substantial expenditure on exploration surveys, drilling and sampling as a basis on which to establish
the presence, extent and estimated grade (metal content) of mineralised material. Even if significant mineralisation is
discovered, it may take additional time and further financial investment to determine whether a mineral resource has
attributes that are adequate enough to support the technical and economic viability of mining projects and enable a
financial investment and development decision to be made. During that time the economic viability of the project may
change due to fluctuations in factors that affect both revenue and costs, including metal prices, foreign exchange
rates, the required return on capital, regulatory requirements, tax regimes and future cost of development and mining
operations.
3) Renewal of tenements: The consolidated entity has been granted tenements on the terms and conditions set out by
the relevant government authorities. At the expiry of the lease term, the decision of renewal application to assign
tenements to the consolidated entity remains with the government. A non-renewal of a tenement that makes up the
Company’s flagship projects would adversely affect the operational results and fulfilment of the aspirations of the
consolidated entity.
4) Technological risk: The Company’s 83% owned subsidiary, Alcore Limited, is developing chemical engineering
processes to recover hydrogen fluoride and aluminium fluoride from recycled industrial waste. This involves the control
of feed material properties and process conditions to achieve suitable product quality at an acceptable rate and yield.
There can be challenges in scaling-up from the existing laboratory-scale proof of concept to an industrial-scale
process, because some phenomena exhibit different behaviour at larger scale. The Alcore process requires feed
materials, energy and labour. The cost of these can vary and affect the commercial viability of the process.
5) Cap