Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ABx Group Limited ASX: ABX Suite 2, Level 11, 385 Bourke Street, Melbourne VIC 3000
ABN 14 139 494 885 P: +61 3 9692 7222 F: +61 2 9956 7355
Quarterly report and activity statement
3 months to 31 December 2025
ABx Group Limited (ASX: ABX) is a uniquely positioned Australian company delivering
materials for a safer, cleaner future.
Highlights
Heavy rare earths: Supplying light and heavy rare earths from Tasmania into Western
supply chains
ANSTO has produced first mixed rare earth carbonate (MREC) product from
Deep Leads deposit, with dysprosium (Dy) and terbium (Tb) content 2.8 to 4.7
times higher than peer MRECs
Preliminary column leach results on 26 kg bulk samples demonstrate very high
rare earth extractions and support the technical feasibility of heap leaching
Aiming to be Australia’s first ionic adsorption clay rare earth project
Clean fluorine chemical production: Producing industrial chemicals from aluminium
smelter by-product (ALCORE)
Continuous pilot plant facility development activities in progress with major
process equipment packages scheduled to be delivered from Q1 2026
Pilot plant fully funded with completion anticipated in Q2 2026
Near-term bauxite production: Mining bauxite resources for the aluminium, cement
and fertiliser industries
Good Importing International (GII) made Stage 1 $2.7 million payment to earn
70% ownership of ABx subsidiary ABx3, which holds the Sunrise Bauxite Project
GII paid a non-refundable fee of A$300,000 to retain an exclusive option to invest
A$4.8m to acquire a 75% interest in the ABx Taralga and Penrose Bauxite
Projects
Aiming to be mining bauxite for customers in 2026
Corporate
Firm commitments received to raise approximately $6 million (before costs) via a
successful share placement to sophisticated and professional investors
ASX: ABX
30 January 2026
2
Quarterly report to 31 December 2025
Heavy Rare Earths: Supplying light and heavy rare earths from Tasmania into Western
supply chains
During the quarter, ABx achieved multiple milestones for the rare earths program in
northern Tasmania.
MREC: ANSTO produced the first mixed rare earth carbonate (MREC) product produced from
a bulk material sample extracted from the Deep Leads deposit, representing a critical
milestone for the project.1
The MREC contains 4.0% Dy and 0.7% Tb as a percentage of TREO,
which is 2.8 to 4.7 times higher than peer MRECs. The high proportions of Dy, Tb and other
high value rare earths means that the ABx MREC basket price is up to 44% higher than all
peer MRECs, based on current rare oxide prices.2
This MREC was produced using the standard three-step process for ionic rare earths:
leaching, impurity removal and precipitation, an existing commercial process that has been
used for many decades.
The MREC composition results have been provided to multiple prospective customers, and
samples will be provided in early 2026. Early customer feedback has been very positive, with
strong indications that the ABx MREC is a very attractive feed material for rare earth
separation plants.
Metallurgical tests: Outstanding preliminary results were obtained from two rare earth
column leach tests conducted on 26 kg bulk samples by ANSTO.3
Post end-of-quarter, it was
confirmed that both column tests achieved more than 80% extraction of total rare earths,
including over 70% extraction of dysprosium and terbium.4
The results exceeded
expectations and confirm that high extractions can be achieved from the Deep Leads rare
earth resource using a range of flowsheet options. This provides ABx with significant
flexibility and scope for optimisation.
Project development: Using the above column leach results, ABx continued its engagement
with engineering partners on project design options, focusing on faster, cheaper, lower risk
alternatives.
Exploration: ABx continues to expand its portfolio of prospective tenements in northern
Tasmania. Exploration Licence EL25/2022 covering 18km2
of highly prospective tenure,
located between the existing Rubble Mound and Wind Break deposits, was granted for an
initial five-year term.5
Post end-of-quarter, the exploration program at the T8 prospect yielded strong results,
intersecting 3,500 ppm TREO at 2m depth, with high levels of dysprosium and terbium.6
1
ASX Announcement, 2 December 2025
2
Based on SMM rare earth oxide prices, 22 January 2026
3
ASX Announcement, 18 December 2025
4
ASX Announcement, 23 January 2026
5
ASX Announcement, 12 December 2025
6
ASX Announcement, 20 January 2026
3
Quarterly report to 31 December 2025
Rare Earths Strategy
ABx is aiming to establish Australia’s first ionic rare earths project, where a MREC with high
dysprosium and terbium content will be produced and sold to rare earth separation plants.
Rare earths have many applications in a wide variety of industries. Permanent magnets are the
most valuable application, representing over 90% of the total value of rare earths demand.
Permanent magnets are used in electric vehicles, wind turbines, smartphones and military
applications. The four most important rare earths for permanent magnets are neodymium (Nd),
praseodymium (Pr), dysprosium (Dy) and terbium (Tb). The demand for these four rare earths is
predicted to grow significantly in coming years, potentially leading to significant supply shortfalls.
The supply risk is highest for dysprosium and terbium, the two heavy rare earths that enable
permanent magnets to perform at high temperatures.
Globally, most rare earths are sourced from mineral deposits. These typically require large,
costly processing plants and a significant lead time to reach production.
An alternative source of rare earths is clay-hosted deposits. These typically contain a mixture of
ionically adsorbed (ionic) rare earths and non-ionic rare earths. The relative proportion of each
varies enormously in different deposits. The ionic rare earths can be leached using a low-cost
three-step process that has been used commercially for many decades.
The other typical major advantages of ionic rare earths are:
• Higher proportion of heavy rare earths compared to mineral deposits
• Low concentrations of radioactive elements such as uranium and thorium
• Exist at shallow depth
Deposits of ionic rare earths have historically been mined predominantly in southern China.
ABx has reported a JORC-compliant mineral resource of 89 million tonnes7
at its Deep Leads -
Rubble Mound and Wind Break deposits.8
The resource contains 36 ppm Dy+Tb9
and Dy+Tb is
4.3% of TREO, the highest proportion of any clay-hosted rare earth deposit in Australia and
among the highest globally. Furthermore, the level of radioactive elements is very low (2 ppm
U2O3 and 6 ppm ThO2). This is complemented by a portfolio of deposits and exploration
tenements in northern Tasmania (Figure 1).
Leaching tests conducted by Australian Nuclear Science and Technology Organisation (ANSTO)
found the highest ionic extractions reported from any clay-hosted resource in Australia.10,11
ABx has produced its maiden MREC product from the Deep Leads resource.12
The MREC
contains 4.0% Dy and 0.7% Tb as a percentage of TREO, more than twice that of any other peer
MREC.
7
41 Mt inferred, 42 Mt indicated and 6 Mt measured
8
ASX Announcement, 2 May 2024
9
Dy+Tb = Dy2O3 + Tb4O7
10
ASX Announcement, 31 May 2022
11
ASX Announcement, 2 February 2023
12
ASX Announcement, 2 December 2025
4
Quarterly report to 31 December 2025
The ABx rare earth deposits are in accessible forest plantations near major towns, highways,
ports and grid hydropower.
ABx has executed a Memorandum of Understanding with Ucore Rare Metals Inc. (TSXV: UCU)
(OTCQX: UURAF),13
which is focussed on creating rare-earth processing facilities in North
America. ABx is also in discussions with other potential offtake partners.
Rare Earths Project Development
ABx is focusing on the following three areas that are the key to commencing commercial
production of an MREC as soon as possible:
• Resource Growth: Continue exploration throughout its expanding tenement holdings
in northern Tasmania to expand the resource size and identify optimum projects
• Project Design: Complete economic studies to optimise project design, supported by
metallurgical studies conducted in-house and with partners such as ANSTO and
engineering partners
• Customer Engagement: Grow the relationships and partnerships with several
Australian and international customers, such as Ucore Rare Metals
Figure 1: ABx exploration tenements in northern Tasmania.
13
ASX Announcement, 4 September 2024
5
Quarterly report to 31 December 2025
Clean Fluorine Chemical Production: Producing industrial chemicals from aluminium
smelter by-product (ALCORE)
The design and construction of the continuous pilot plant are proceeding on schedule at the
ALCORE Technology Centre (ATC) in Bell Bay, Tasmania.
During the period, the ATC entered a critical infrastructure phase to receive the pilot plant
equipment packages.
Infrastructure upgrades, including power supply expansion, low-voltage electrical
distribution, equipment foundations and hazardous chemical bunding were being designed
according to equipment specifications and Australian regulatory standards.14
Auxiliary systems have been manufactured by external suppliers, including the wastewater
treatment plant, demineralised water system and air compressor package. These systems
will be delivered to site and installed after equipment foundations and utilities are prepared.
Detailed mechanical designs and fabrication drawings have been completed for all major
process equipment packages. These are currently under review by Australian-registered
professionals to ensure compliance with Australian Standards, safety regulations, site-
specific criteria and process operability requirements. Manufacture of these major process
equipment packages will commence immediately upon approval of the review.
These equipment packages are scheduled to be delivered and assembled from Q1 2026.15
In addition, ALCORE has begun recruiting additional staff to deliver the construction,
commissioning and operation of the continuous pilot plant. A Site Operations Manager has
been appointed, and the recruitment of two process engineers is in progress.
During the quarter, ALCORE received a research & development (R&D) tax offset of
$298,386.33 from the Australian Taxation Office (ATO) for activities undertaken during the
2024 financial year.16
ALCORE submitted an application for a Commercialisation and Growth Grant of $3.03 million
from the Federal Government Industry Growth Program, which is designed to support small
and medium enterprises (SMEs) undertaking innovative commercialisation and/or growth
projects within the priority areas of the Australian Government’s National Reconstruction
Fund. It is expected that the application will be assessed by mid-2026.
Clean Fluorine Chemicals Strategy
ALCORE is aiming to establish the production of hydrogen fluoride and aluminium fluoride
in Australia, using an aluminium smelter by-product as feed material.
The main applications of hydrogen fluoride are to produce fluorocarbons, such as
refrigerants and polymers, and aluminium fluoride. It is also used in the manufacture of
14
ASX Announcement, 15 October 2025
15
ASX Announcement, 28 November 2025
16
ASX Announcement, 6 October 2025
6
Quarterly report to 31 December 2025
semi-conductors, solar cells and lithium-ion batteries, which is the most rapidly growing
application. The global market for hydrogen fluoride is over US$3 billion per year.
Hydrogen fluoride is mainly produced from fluorspar, which is obtained from the mineral
fluorite. Fluorspar is relatively high cost and has been identified as a critical material by all
major jurisdictions, including Australia.
Australia does not mine any fluorite, or produce any fluorspar, hydrogen fluoride or
aluminium fluoride, and so must import all its requirements. The present Australian demand
for hydrogen fluoride is small and it is imported at high cost. There are prospects for demand
growth, but this will be difficult to satisfy without local production.
Aluminium fluoride is an essential chemical for aluminium metal production. Australia is the
largest global producer of aluminium metal without its own domestic aluminium fluoride
production, so Australian aluminium smelters rely entirely on imported aluminium fluoride,
typically more than 80% from China.
Most modern aluminium smelters produce excess ‘bath’ as a by-product, a solid powder that
contains about 50% fluorine, for which the only meaningful market is new smelters that
require bath to commence operations. Aluminium industry forecasts suggest that the global
bath market will increasingly be in surplus, because far fewer new smelters are being
constructed. All the major global aluminium producers are eager for alternative applications
for excess bath, to avoid the unpalatable options of on-site storage or landfill.
ALCORE has developed a world-first proprietary process to produce industrial chemicals
from aluminium smelter bath. The major products are hydrogen fluoride and metal sulfates.
The hydrogen fluoride is combined with aluminium hydroxide to produce aluminium
fluoride via an existing commercial process. The combined approach is illustrated in Figure
2.
The metal sulfates can potentially be sold as a single industrial chemical or further processed
into multiple industrial chemicals. A range of options is being assessed.
ALCORE intends to construct commercial hydrogen fluoride and aluminium fluoride plants
in Bell Bay, Tasmania.
The process to produce hydrogen fluoride has been operated at pilot scale in a batch reactor.
The next stage is to construct and operate a bath continuous pilot plant, the outcomes of
which will be:
1. Selection of reactor designs and process conditions for the commercial plant
2. Production of saleable hydrogen fluoride for evaluation by customers
ALCORE has secured the support of Rio Tinto17
and the Tasmanian Government18
to locate
the pilot plant in an existing industrial facility adjacent to the Bell Bay aluminium smelter in
northern Tasmania.
17
ASX Announcement, 15 January 2025
18
ASX Announcement, 19 December 2024
7
Quarterly report to 31 December 2025
Clean Fluorine Chemicals Project Development
ABx is focusing on the following three areas that are the key to commencing commercial
production of an MREC as soon as possible:
• Pilot Plant: Construct and operate the continuous pilot plant to validate commercial
design parameters
• Project Design: Complete economic studies to optimise project design, supported by
international engineering partners
• Customer Engagement: Grow the relationships and partnerships with Australian and
international customers
Figure 2: Circular economy approach of production of clean fluorine chemicals from aluminium smelter
bath
Smelter bath
Aluminium
smelting
Aluminium
fluoride
AIF3
Hydrogen
fluoride
HF
Traditional
Applications
Al-Na
sulfate
Emerging
Applications
H2SO4
Sulfuric acid
• Lithium-ion batteries
• Graphite purification
• Refrigerants
• Fluoropolymers
• Solar cell manufacture
• Semiconductor manufacture
Aluminium-sodium
sulfate
8
Quarterly report to 31 December 2025
Near-term Bauxite Production: Mining bauxite resources for the aluminium, cement and
fertiliser industries
Sunrise Bauxite Project: Binjour, Queensland
ABx’s strategic partners, Good Importing International (GII) made a Stage 1 $2.7 million
payment to earn 70% ownership of ABx’s wholly owned subsidiary ABx3, which holds the
Sunrise Bauxite Project.19
The funds are being applied to finalise mine planning,
environmental and port approvals for the initial direct shipping ore (DSO) program. Stage 2
funding of a further $2.7 million will follow upon completion of Stage 1 milestones.
The Stage 1 program is expected to be complete in 2027. The timing is mainly dependent on
securing environmental approvals.
Taralga and Penrose Bauxite Projects: New South Wales
GII also paid a non-refundable fee of A$300,000 to retain an exclusive option to invest
A$4.8m to acquire a 75% interest in ABx2, a wholly-owned subsidiary of ABx Group which
possesses the Taralga and Penrose Bauxite Projects.20
Following payment of the $300,000 fee, GII now retains an exclusive option to 11 June 2026.
The fee will be credited against the $4.8m investment if the option is exercised and
completed. A portion of the $300,000 fee is anticipated to be deployed on Taralga project
studies being conducted jointly by ABx and GII.
DL130 Bauxite Project: Tasmania
As previously advised, ABx has completed all environmental approvals and Meander Valley
Council (MVC) approved the planning permit, subject to some conditions. ABx appealed
some aspects of the MVC decision to the Tasmanian Civil & Administrative Tribunal (TASCAT).
A representor also appealed the decision. All parties are participating in mediation, which
continues.
During the quarter, Mineral Resources Tasmania granted Mining Lease 2142P/M for the
project. This means that commencement of bauxite quarrying is only subject to resolution
of the planning permit appeal.
19
ASX Announcement, 9 October 2025
20
ASX Announcement, 9 December 2025
9
Quarterly report to 31 December 2025
Bauxite Strategy
Metallurgical and Refractory Grade
Global metallurgical bauxite prices spiked substantially in late 2024 and early 2025 due to a
combination of factors, notably actions by the Guinean government to restrict exports by
some companies.
These higher prices materially increase the value of ABx’s bauxite assets. The ABx strategy is
to bring these into production as soon as possible, with a focus on profitability.
The ABx metallurgical and refractory bauxite assets are listed in Table 1.
The Sunrise Bauxite Project in Queensland consists of a JORC-compliant resource of
37 million tonnes of gibbsite-type metallurgical bauxite at Binjour and port operations at
Bundaberg port (Figure 3).
The Taralga deposit consists of a JORC-compliant resource of 38 million tonnes of gibbsite-
type metallurgical bauxite, located 200 km inland from Port Kembla (Figure 4). The Penrose
discovery is a layer of refractory-grade bauxite in Penrose state pine forest, adjacent to the
Hume Highway, 90 kilometres from Port Kembla.
ABx executed a transformational series of agreements with Good Importing International
(GII). GII will invest up to $5.4m in two stages to acquire up to a 75% interest in ABx3 Pty Ltd
(ABx3), which holds the Sunrise Bauxite Project assets. GII also has a 9-month exclusive
option to invest $4.8m to acquire a 75% interest in ABx2 Pty Ltd (ABx2), which holds the
Taralga and Penrose bauxite assets.
GII has made the Stage 1 $2.7 million payment to earn 70% ownership of ABx3.21
Table 1: ABx bauxite resources subject to agreements with Good Importing International (GII)
Location State ABx Subsidiary Resource (Mt)
Inferred Indicated Total
Binjour22
QLD ABx3 14.2 22.8 37.0
Taralga23
NSW ABx2 17.5 20.4 37.9
Penrose24
NSW ABx2 - - -
21
ASX Announcement, 9 October 2025
22
ASX Announcement, 18 June 2018 and Table 1
23
ASX Announcement, 31 May 2012 and Table 1
24
ASX Announcement, 27 February 2017
10
Quarterly report to 31 December 2025
Figure 3: Sunrise Bauxite project (mine at Binjour and port at Bundaberg)
Figure 4: Taralga and Penrose Bauxite projects, and port at Port Kembla
11
Quarterly report to 31 December 2025
Cement and Fertiliser Grade
The ABx strategy is to selectively produce cement grade and fertiliser grade bauxite, with a
focus on profitability. ABx bauxite can substantially improve the properties of cement and
superphosphate fertiliser produced by particular plants.
In Tasmania, ABx has three bauxite deposits of cement and fertiliser grade. ABx has
previously mined at Bald Hill near Campbell Town from 2014 to 2020 and sold the product
to cement and fertiliser plants.
ABx plans to recommence bauxite mining at the DL130 Bauxite Project, located about 50 km
west of Launceston.
In September 2023, an agreement was executed with Adelaide Brighton Cement Limited
(ABCL), a subsidiary of Adbri Limited (ASX:ABC), for the supply of cement-grade bauxite to
ABCL’s Birkenhead cement manufacturing operation in South Australia.25
The agreement
forecasts supply of 90,000-120,000 tonnes of bauxite over a five-year term.
Meander Valley Council (MVC) has approved the DL130 planning permit, subject to some
conditions. ABx appealed aspects of the MVC decision to the Tasmanian Civil &
Administrative Tribunal (TASCAT). A representor also appealed the decision. All parties are
participating in mediation.
Corporate
In November 2025, ABx received firm commitments to raise approximately $6 million (before
costs) via a successful share placement to sophisticated and professional investors.26
The
placement was strongly supported by several new Australian and international institutional
investors and new high-net-worth investors
In May 2024, ABx published its baseline Environmental, Social, and Governance (“ESG”)
report.27
In each quarterly report, ABx will publish its ESG progress dashboard, summarising
its progress against 21 core metrics developed by the World Economic Forum. The
dashboard is shown on the following page.
Updated rare earths, ALCORE and bauxite presentations have been placed on the ABx
website www.abxgroup.com.au.
This announcement is approved for release by the board of directors.
For further information please contact:
Dr Mark Cooksey
MD & CEO
ABx Group
+61 447 201 536
mcooksey@abxgroup.com.au
www.abxgroup.com.au
Media
Chapter One Advisors
David Tasker / Alex Baker
+61 433 112 936 / +61 432 801 745
dtasker@chapteroneadvisors.com.au /
abaker@chapteroneadvisors.com.au
25
ASX Announcement, 11 September 2023
26
ASX Announcement, 25 November 2025
27
ASX Announcement, 30 May 2024
12
Quarterly report to 31 December 2025
13
Quarterly report to 31 December 2025
Qualifying statements
General: The information in this report that relate to Exploration Information and Mineral Resources are based on
information compiled by Jacob Rebek and Ian Levy who are members of The Australasian Institute of Mining and
Metallurgy and the Australian Institute of Geoscientists. Mr Rebek and Mr Levy are qualified geologists and Mr Levy is
a director of ABx Group Limited.
Mainland: The information relating to Mineral Resources on the Mainland was prepared and first disclosed under the
JORC Code 2004. It has not been updated since to comply with the JORC Code 2012 on the basis that the information
has not materially changed since it was last reported. Mr Rebek and Mr Levy have sufficient experience, which is relevant
to the style of mineralisation and type of deposit under consideration and to the activity, which they are undertaking to
qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of exploration Results,
Mineral Resources and Ore Reserves. Mr Rebek and Mr Levy have consented in writing to the inclusion in this report of
the Exploration Information in the form and context in which it appears.
Tasmania: The information relating to Exploration Information and Mineral Resources in Tasmania has been prepared
or updated under the JORC Code 2012. Mr Rebek and Mr Levy have sufficient experience, which is relevant to the style
of mineralisation and type of deposit under consideration and to the activity, which they are undertaking to qualify as
a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves. Mr Rebek and Mr Levy have consented in writing to the inclusion in this report
of the Exploration Information in the form and context in which it appears.
The information relating to the latest REE Resources update is extracted from the report entitled “ABx Rare Earth
Resources Increase 70% to 89 Million Tonnes” dated 2 May 2024 and is available to view on
https://www.abxgroup.com.au/site/investor-information/asx-announcements.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the company’s market announcements and, in the case of estimates of Mineral Resources or Ore Reserves,
that all material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed.
The Company also confirms that the form and context in which the Competent Person’s findings are presented have
not been materially modified from the original market announcements.
Disclaimer Regarding Forward Looking Statements
This ASX announcement (Announcement) contains various forward-looking statements. All statements other than
statements of historical fact are forward-looking statements. Forward-looking statements are inherently subject to
uncertainties in that they may be affected by a variety of known and unknown risks, variables and factors which could
cause actual values or results, performance or achievements to differ materially from the expectations described in
such forward-looking statements.
ABx does not give any assurance that the anticipated results, performance or achievements expressed or implied in
those forward-looking statements will be achieved.
14
Quarterly report to 31 December 2025
Table 1: Tenement information required under LR 5.3.3 as at quarter end
State Tenement Location
Tasmania ML 2412P/M DL130 Project
EL 7/2010 Conara
EL 9/2010 Deloraine
EL 18/2014 Prosser’s Road
EL 10/2021 Rubble Mound
EL 25/2022 Selbourne
EL 27/2022 Temple Bar
EL 28/2022 Triangle Flats
Queensland* MLA 100277 Sunrise ML application
EPM 27787 Binjour
New South Wales EL 9664 Penrose Quarry
EL 9798 Taralga
Notes: No tenements were relinquished. All tenements are in good standing, 100% owned
and not subject to any third-party royalties nor are they encumbered in any way
*Subsequent to quarter end, the interest in the Queensland tenements reduced to 30%
following the transaction with Good Importing International.28
Information required under Listing Rule 5.3.1: Exploration expenditure reported during the quarter related to
the rare earth project development ($462,000), research conducted by ALCORE with respect to its reported
advancements ($455,000), and staff, administration and corporate costs ($792,000).
Information required under Listing Rule 5.3.2: No mining production was conducted during the quarter.
Information required under Listing Rule 5.3.5: The payments as disclosed in section 6.1 of the Appendix 5B
amounting to $256,000 relate to payment for Director’s fees and salaries.
28
ASX Announcement, 9 October 2025
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
ABx Group Limited
ABN Quarter ended (“current quarter”)
14 139 494 885 31 December 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date (12
months)
$A’000
1. Cash flows from operating activities
87 116
1.1 Receipts from customers
1.2 Payments for
- -
(a) exploration & evaluation
(b) research & development (455) (2,071)
(c) production - -
(d) staff costs (124) (372)
(e) administration and corporate costs (668) (1,661)
1.3 Dividends received (see note 3) - -
1.4 Interest received - 55
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives 754 1,817
1.8 Other (provide details if material) - -
1.9 Net cash from / (used in) operating
activities
(406) (2,116)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) exploration & evaluation (462) (1,793)
(e) investments - -
(f) other non-current assets (repayment to
MMI fund held-in-trust)
(3,482) (3,482)
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (12
months)
$A’000
2.2 Proceeds from the disposal of: - -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets (release of
MMI funds held-in-trust)
- 1,482
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (Security Deposit and Option fee
received)
- (74)
2.6 Net cash from / (used in) investing
activities (3,944) (3,867)
3. Cash flows from financing activities
5,225 8,125
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- 1,475
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(336) (573)
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (Advance received from Investors) 300 300
3.10 Net cash from / (used in) financing
activities
5,189 9,327
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
3,066 561
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(406) (2,116)
4.3 Net cash from / (used in) investing activities
(item 2.6 above) (3,944) (3,867)
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (12
months)
$A’000
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
5,189 9,327
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and